← Back
Two family converted from one family
626 MAC DONOUGH STREET
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3040279
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R5BZoning
2,268 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: 626 MACDONOUGH, LLC · 1,800 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 2 filings · 20 docs
Basement1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LUNALAND LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/26/2023$2.4M—LUNALAND LLC → 626 MACDONOUGH, LLC$1,052/sf building
11/05/2021$1.2M—Private party → LUNALAND LLC$547/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN401/17/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor303/21/2026
BNH CONSTRUCTION NY INCGeneral Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252201/17/2023
AA BUILDING & INSPECTION1519206/23/2022
Building Lifecycle
All (44)Filed (4)Permit Issued (3)Signed Off (2)Violation (3)Inspection (2)Special Inspection (30)
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
06/14/2023
Signed off — Alteration
B00684329-I1
06/13/2023
Signed off — Alteration
Installation of new gas fired equipment and plumbing fixtures, for the interior renovation of the existing two family dwellings. file in conjunction with ALT II application #B00684329-I1
B00694399-I1
05/16/2023
Permit issued — Structural
B00684329-I1-GC-CX
01/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/20/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
01/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/17/2023
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures, for the interior renovation of the existing two family dwellings. file in conjunction with ALT II application #B00684329-I1
B00694399-P1
01/11/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
01/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
10/26/2022
Permit issued — Plumbing
B00694399-I1-PL
07/19/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2022
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/07/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/07/2022
Special inspection requirement — Maintenance information
Younes Abouyaala
07/07/2022
Special inspection requirement — Shutoff dampers
Younes Abouyaala
07/07/2022
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/07/2022
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
07/07/2022
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/07/2022
Special inspection requirement — Final
NAVEEN KUMAR
07/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/07/2022
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/07/2022
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/07/2022
Special inspection requirement — Interior lighting power
Younes Abouyaala
06/30/2022
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures, for the interior renovation of the existing two family dwellings. file in conjunction with ALT II application #B00684329-I1
B00694399-I1
06/23/2022
Filed — Alteration
B00684329-P1
03/21/2022
Permit issued — General Construction
B00684329-I1-GC-CX
02/28/2022
Filed — Alteration
B00684329-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNYC BUILDING SOLUTIONS CO05/16/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/26/2022
DOB NOWGeneral ConstructionSigned-offBNH CONSTRUCTION NY INC03/21/2022
1 project · most recent 06/11/2022
General Wiring
FiledStatusContractorScope
06/11/2022CompleteERIC & NG ELEC'L, INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
01/20/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/20/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/20/2023Maintenance informationYounes Abouyaalaenergy_progress
01/20/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/20/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/20/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
01/11/2023Maintenance informationYounes Abouyaalaenergy_progress
01/11/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/11/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/11/2023HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/11/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/11/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
07/07/2022Concrete - Cast-In-PlaceYounes Abouyaalaspecial
07/07/2022Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/07/2022Maintenance informationYounes Abouyaalaenergy_progress
07/07/2022Shutoff dampersYounes Abouyaalaenergy_progress
07/07/2022Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/07/2022HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/07/2022HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/07/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/07/2022Structural Steel - DetailsYounes Abouyaalaspecial
07/07/2022Mechanical SystemsYounes Abouyaalaspecial
07/07/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
07/07/2022FinalNAVEEN KUMARprogress
07/07/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
Latest 25 of 48.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00684329-P1Request digital key ↗
08/31/2026B00684329-I1Request digital key ↗
08/29/2026B00694399-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026B00694399-P1Open ↗
09/02/2026B00694399-P1Open ↗
08/28/2026B00694399-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00694399-P1Open ↗
08/28/2026B00694399-I1Open ↗
08/25/2026B00684329-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00684329-P1Open ↗
08/31/2026B00684329-I1Open ↗
08/13/2026B00694399-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00684329-P1Open ↗
08/31/2026B00684329-I1Open ↗
08/13/2026B00694399-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00684329-I1Open ↗
08/13/2026B00694399-I1Open ↗