← Back
Primarily 1 family with 1 store or office
6272 AMBOY ROAD
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5087273
💬 Discuss this project
1931Year Built
2Stories
S1Building Class
R3XZoning
2,600 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: N&N 2022 PROPERTY, INC. · 9,300 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 9 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
N&N 2022 PROPERTY INC LI103/22/2026
PLEASANT PLAINS LLC103/22/2026
N & N 2022 PROPERTY INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS, LLP505/19/2021
TAN ENGINEERING PC101/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS503/21/2026
CHERICO KING ARCHITECT P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KCM PLUMBING & HEATING COPlumbing207/08/2026
KCM PLMBG & HTNG CORPGeneral Contractor107/08/2026
PRESTIGIOUS MAINTENANCE IGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738102/17/2021
TAN ENGINEERING, P.C.1291201/21/2021
Building Lifecycle
All (38)Filed (6)Permit Issued (4)Signed Off (3)Violation (3)Objection (14)Special Inspection (8)
10/24/2024
Violation issued (ECB, closed)
Plumbing
06/05/2023
Violation issued (FDNY_NOV, closed)
10/18/2021
Signed off — Alteration
proposed partitions and commercial kitchen at first floor of existing mixed use building. no change to building egress, floor area, use or occupancy proposed as part of this application.
S00469840-I1
09/22/2021
Signed off — Alteration
Plumbing work filed in conjunction with DOBNOW application # S00469840-I1,
S00469895-I1
08/03/2021
Permit issued — General Construction
S00469840-I1-GC
06/03/2021
Signed off — Alteration
INSTALL MECHANICAL VENTILATION SYSTEM FOR A COMMERCIAL KITCHEN ON 1ST FLOOR. INSTALLATION TO INCLUDE, KITCHEN HOOD, BLACK IRON DUCT, MAKE-UP AIR AND EXHAUST FAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00452921-I1
05/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/26/2021
Special inspection requirement — Final
anthony santoro
05/26/2021
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
05/25/2021
Permit issued — Mechanical Systems
S00452921-I1-MS
05/19/2021
Filed — Alteration
Plumbing work filed in conjunction with DOBNOW application # S00469840-I1,
S00469895-P2
05/19/2021
Filed — Alteration
proposed partitions and commercial kitchen at first floor of existing mixed use building. no change to building egress, floor area, use or occupancy proposed as part of this application.
S00469840-P1
05/06/2021
Permit issued — Plumbing
S00469895-I1-PL
03/31/2021
Permit issued — Plumbing
S00469895-I1-PL
03/11/2021
Filed — Alteration
Plumbing work filed in conjunction with DOBNOW application # S00469840-I1,
S00469895-P1
02/24/2021
Objection raised — Fire_Protection
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Accessibility
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Structural
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Accessibility
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Fire_Protection
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Scope
02/24/2021
Objection resolved — Addressed
02/24/2021
Objection raised — Structural
02/24/2021
Objection resolved — Addressed
02/17/2021
Filed — Alteration
proposed partitions and commercial kitchen at first floor of existing mixed use building. no change to building egress, floor area, use or occupancy proposed as part of this application.
S00469840-I1
02/17/2021
Filed — Alteration
Plumbing work filed in conjunction with DOBNOW application # S00469840-I1,
S00469895-I1
01/21/2021
Filed — Alteration
INSTALL MECHANICAL VENTILATION SYSTEM FOR A COMMERCIAL KITCHEN ON 1ST FLOOR. INSTALLATION TO INCLUDE, KITCHEN HOOD, BLACK IRON DUCT, MAKE-UP AIR AND EXHAUST FAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00452921-I1
01/21/2021
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
01/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
01/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
01/12/2021
Special inspection requirement — Final
Roger Tan
01/12/2021
Special inspection requirement — Mechanical Systems
Roger Tan
07/15/2006
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKCM PLMBG & HTNG CORP08/03/2021
DOB NOWMechanical SystemsSigned-offPRESTIGIOUS MAINTENANCE I05/25/2021
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO05/06/2021
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO03/31/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/26/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
05/26/2021Finalanthony santoroprogress
05/26/2021Fire-Resistance Rated Constructionanthony santoroprogress
01/21/2021HVAC-R and service water heating equipmentRoger Tanenergy_progress
01/20/2021Energy Code Compliance InspectionsRoger Tanprogress
01/12/2021Fire-Resistant Penetrations and JointsRoger Tanspecial
01/12/2021FinalRoger Tanprogress
01/12/2021Mechanical SystemsRoger Tanspecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026S00469895-I1Request digital key ↗
08/15/2026S00469895-P2Request digital key ↗
08/15/2026S00469895-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
08/25/2026S00469840-P1Request digital key ↗
08/15/2026S00469840-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026S00452921-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026S00469895-I1Open ↗
08/25/2026S00469895-P2Open ↗
08/25/2026S00469895-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026S00452921-I1Open ↗
09/02/2026S00452921-I1Open ↗
09/02/2026S00452921-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026S00452921-I1Open ↗
09/02/2026S00452921-I1Open ↗
08/29/2026S00469840-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/13/2026S00469895-P1Open ↗
08/13/2026S00469895-I1Open ↗
08/13/2026S00469895-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026S00469895-I1Open ↗
08/25/2026S00469895-P2Open ↗
08/25/2026S00469895-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00452921-I1Open ↗