← Back
BuildNYC
Five to six families
628 60TH STREET
BROOKLYN · BIN 3143530
💬 Discuss this project
1915Year Built
3Stories
C2Building Class
R6BZoning
4,750 sfGross Floor Area
6Units
Rent Stabilized2 Active Violations 1 likely answered 2 old, status unconfirmed ▸FDNY Report ↗
Five to six families · Owner of record: 628 Realty Group · 2,017 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior renovation of all bathrooms7p · 2 filings · 20 docs
Floor 3Unit 3F23p · 2 filings · 20 docs
Floor 2Unit 2F23p · 2 filings · 20 docs
Floor 1Unit 1F23p · 2 filings · 20 docs
CellarInterior renovation of all bathrooms26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
628 Realty Group2303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/26/2021$1.6M—— → —$347/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pondosa Design705/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC Plumbing and HeatingPlumbing907/08/2026
DHC ContractingGeneral Contractor603/21/2026
Combined Electrical ContngElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Just Consulting Engineering5865305/30/2023
Pondosa Design5126705/30/2023
Building Lifecycle
All (117)Filed (7)Permit Issued (3)Violation (9)Inspection (6)Objection (62)Special Inspection (30)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/08/2023
Special inspection requirement — Insulation placement and R values
MANG WONG
06/08/2023
Special inspection requirement — Mechanical Systems
MANG WONG
06/08/2023
Special inspection requirement — Permanent certificate
MANG WONG
06/08/2023
Special inspection requirement — Maintenance information
MANG WONG
06/08/2023
Special inspection requirement — Post-installed Anchors
MANG WONG
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANG WONG
06/08/2023
Special inspection requirement — Final
IHAB SHAFEI
06/08/2023
Special inspection requirement — Fenestration areas
MANG WONG
06/08/2023
Special inspection requirement — Metering
MANG WONG
06/08/2023
Special inspection requirement — Air barrier - visual inspection
MANG WONG
06/08/2023
Special inspection requirement — Fenestration air leakage
MANG WONG
06/08/2023
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
06/08/2023
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOJUN WANG
06/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
MANG WONG
06/08/2023
Special inspection requirement — Structural Wood Frame
MANG WONG
06/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
MANG WONG
06/08/2023
Special inspection requirement — Energy Code Compliance Inspections
MANG WONG
06/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MANG WONG
06/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MANG WONG
06/08/2023
Special inspection requirement — Interior lighting power
MANG WONG
06/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
MANG WONG
06/08/2023
Special inspection requirement — Shutoff dampers
MANG WONG
06/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MANG WONG
06/06/2023
Objection resolved — Addressed
06/05/2023
Objection resolved — Addressed
06/02/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/01/2023
Objection raised — Inspections
06/01/2023
Objection raised — Other
05/30/2023
Filed — Alteration
INTERIOR RENOVATION INCLUDING NEW PARTITION WALLS AND WINDOWS; REPLACE AND REINFORCE EXISTING WOOD JOISTS AND PROVIDE NEW BATHROOM EXHAUST FANS. NO CHANGE IN BULK; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
B00499215-P4
05/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MANG WONG
05/30/2023
Special inspection requirement — Post-installed Anchors
MANG WONG
05/30/2023
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MANG WONG
05/30/2023
Special inspection requirement — Mechanical Systems
MANG WONG
05/30/2023
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOJUN WANG
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
MANG WONG
05/24/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/21/2022
Filed — Alteration
INTERIOR RENOVATION INCLUDING NEW PARTITION WALLS AND WINDOWS; REPLACE AND REINFORCE EXISTING WOOD JOISTS AND PROVIDE NEW BATHROOM EXHAUST FANS. NO CHANGE IN BULK; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
B00499215-P3
09/09/2022
Permit issued — Mechanical Systems
B00499215-I1-GC-CX
05/16/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/16/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/11/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/13/2022
Objection resolved — Addressed
04/11/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/14/2022
Objection raised — Mechanical
03/07/2022
Objection raised — Other
01/21/2022
Objection resolved — Addressed
01/21/2022
Objection resolved — Addressed
12/22/2021
Objection resolved — Addressed
12/22/2021
Objection resolved — Addressed
12/15/2021
Objection resolved — Addressed
12/15/2021
Objection resolved — Addressed
12/14/2021
Objection resolved — Addressed
12/14/2021
Objection resolved — Addressed
12/14/2021
Objection resolved — Addressed
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAlexander Chan09/09/2022
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating09/10/2021
DOB NOWMechanical SystemsPermit IssuedAlexander Chan09/08/2021
1 project · most recent 05/30/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/30/2023Permit IssuedDHC ContractingHeating Systems, Ventilation Systems
Heating
Navien NCB-190 160,000 BTU · Boiler ×35
Ventilation
Greenheck SP-A90 150 CFM · Exhaust Fan ×71
1 project · most recent 10/27/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/27/2021Signed-offXH&RC Plumbing and HeatingGas, Storm, Water/Sanitary
1 project · most recent 04/05/2022
General Wiring
FiledStatusContractorScope
04/05/2022CompleteCombined Electrical ContngGeneral Wiring
1 project · most recent 05/30/2023
Steel Wood
FiledStatusContractorScope
05/30/2023Permit IssuedDHC ContractingSteel, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/02/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/16/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/11/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
06/08/2023Insulation placement and R valuesMANG WONGenergy_progress
06/08/2023Fenestration areasMANG WONGenergy_progress
06/08/2023Permanent certificateMANG WONGenergy_progress
06/08/2023Fenestration and door U-factor and product ratingsMANG WONGenergy_progress
06/08/2023Interior lighting powerMANG WONGenergy_progress
06/08/2023MeteringMANG WONGenergy_progress
06/08/2023HVAC-R and service water heating equipmentMANG WONGenergy_progress
06/08/2023Shutoff dampersMANG WONGenergy_progress
06/08/2023Air barrier - visual inspectionMANG WONGenergy_progress
06/08/2023Maintenance informationMANG WONGenergy_progress
06/08/2023HVAC-R and service water piping design and insulationMANG WONGenergy_progress
06/08/2023Fenestration air leakageMANG WONGenergy_progress
06/08/2023HVAC-R and service water heating system controlsMANG WONGenergy_progress
06/08/2023Fire-Resistant Penetrations and JointsMANG WONGspecial
06/08/2023Structural Stability – Alterations of existing buildingsMANG WONGspecial
06/08/2023Structural Steel - High Strength BoltingXIAOJUN WANGspecial
06/08/2023Structural Steel - DetailsXIAOJUN WANGspecial
06/08/2023Post-installed AnchorsMANG WONGspecial
06/08/2023Mechanical SystemsMANG WONGspecial
06/08/2023Structural Wood FrameMANG WONGprogress
06/08/2023Fire-Resistance Rated ConstructionMANG WONGprogress
06/08/2023FinalIHAB SHAFEIprogress
06/08/2023Energy Code Compliance InspectionsMANG WONGprogress
05/30/2023Fenestration air leakageMANG WONGenergy_progress
05/30/2023Maintenance informationMANG WONGenergy_progress
Latest 25 of 112.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B00499215-P3Request digital key ↗
08/27/2026B00499215-P1Request digital key ↗
08/15/2026B00499215-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications82
▸DOB NOWProgress Inspector Seal & Signature59
10/04/2026B00499215-P4Open ↗
10/04/2026B00499215-P4Open ↗
10/04/2026B00499215-P4Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
10/04/2026B00499215-P4Open ↗
10/04/2026B00499215-P4Open ↗
10/04/2026B00499215-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00499501-P1Open ↗
08/31/2026B00499501-I1Open ↗
08/27/2026B00499215-P4Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026B00499215-I1Open ↗
08/14/2026B00499501-I1Open ↗
▸Other Documents7
▸DOB NOWDHCR Document7
08/14/2026B00499501-P1Open ↗
08/14/2026B00499501-I1Open ↗
08/13/2026B00499215-P2Open ↗
Showing 3 of 7 on file for this type