Health center, child center, clinic
Philip Michaels Day Care Center
629 COURTLANDT AVENUE · Melrose · BIN 2001876
💬 Discuss this project
1972Year Built
3Stories
I5Building Class
R7-1Zoning
24,248 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Health center, child center, clinic · Owner of record: LANCOURT ASSOCIATES, LLC · 7,648 sf lot · 3.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof2p · 2 filings · 8 docs
Floor 447p · 2 filings · 20 docs
Floor 349p · 2 filings · 20 docs
Floor 251p · 3 filings · 20 docs
Floor 150p · 3 filings · 20 docs
Cellar45p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BARONE MANAGEMENT4307/08/2026
TOPLINE NYC CONTRACTING707/08/2026
LANCOURT ASSOCIATES907/08/2026
MANAGEMENT LLC BARONE403/22/2026
RESTORATION INC M G R103/22/2026
SCAFFOLDING LLC SPRING103/22/2026
LAND COURT ASSOCIATES203/21/2026
ACS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.203/21/2026
JM ZONING, LLC.3003/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
SMN CONSULTING SERVICES203/21/2026
SPRING SCAFFOLDING LLC1603/21/2026
LOUIS STRIAR403/21/2026
TSC103/21/2026
H Z BUILDING NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BARONE MANAGEMENT LLCGeneral Contractor1107/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor907/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing207/08/2026
FM95 NYScaffold207/08/2026
YOUNG CHOEElectrical203/21/2026
BREEZIN H V A C INCGeneral Contractor107/08/2026
MP & L METAL INCElectrical103/21/2026
DDS MECHANICAL FPS CORPFire Protection107/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GLOBAL ARCH DESIGN & BUIL33971305/12/2025
JOSE L. PENA, P.E5969103/26/2021
Building Lifecycle
All (205)Filed (34)Permit Issued (32)Signed Off (15)Violation (48)Inspection (10)Objection (36)Special Inspection (30)
07/24/2026
Signed off — Alteration CO
FOUNDATION WORK REALTED TO THE INTERIOR & EXTERIOR RENOVATION AND VERTICAL ENLARGEMENT (NEW 4TH FLOOR) OF EXISTING CEL + 3-STORY SCHOOL AS PER PLANS FILED HEREWITH.
X00825579-S4
06/01/2026
Signed off — Alteration
Installation of 8'h plywood fence
X00893026-I1
05/27/2026
Signed off — Alteration
Reinforce existing structure for additional fourth floor over the existing building.
X00913510-I1
05/22/2026
Signed off — Alteration CO
FOUNDATION WORK REALTED TO THE INTERIOR & EXTERIOR RENOVATION AND VERTICAL ENLARGEMENT (NEW 4TH FLOOR) OF EXISTING CEL + 3-STORY SCHOOL AS PER PLANS FILED HEREWITH.
X00825579-S5
05/22/2026
Signed off — Alteration CO
FOUNDATION WORK REALTED TO THE INTERIOR & EXTERIOR RENOVATION AND VERTICAL ENLARGEMENT (NEW 4TH FLOOR) OF EXISTING CEL + 3-STORY SCHOOL AS PER PLANS FILED HEREWITH.
X00825579-S2
05/22/2026
Signed off — Alteration CO
FOUNDATION WORK REALTED TO THE INTERIOR & EXTERIOR RENOVATION AND VERTICAL ENLARGEMENT (NEW 4TH FLOOR) OF EXISTING CEL + 3-STORY SCHOOL AS PER PLANS FILED HEREWITH.
X00825579-S1
02/21/2026
Violation issued (FDNY_NOV, closed)
02/21/2026
Violation issued (FDNY_NOV, closed)
07/16/2025
Permit issued — Structural
X00825579-S4-ST
06/12/2025
Violation issued (FDNY_ORDER, closed)
05/30/2025
Special inspection requirement — Final
NITHIN JOHN
05/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NITHIN JOHN
05/30/2025
Special inspection requirement — Structural Steel - Welding
NITHIN JOHN
05/30/2025
Special inspection requirement — Open-web Steel Joists and Joist Girders
NITHIN JOHN
05/30/2025
Special inspection requirement — Concrete - Cast-In-Place
NITHIN JOHN
05/30/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
NITHIN JOHN
05/30/2025
Special inspection requirement — Structural Steel - Details
NITHIN JOHN
05/30/2025
Special inspection requirement — Structural Cold-Formed Steel
NITHIN JOHN
05/30/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
NITHIN JOHN
05/30/2025
Special inspection requirement — Post-installed Anchors
NITHIN JOHN
05/30/2025
Special inspection requirement — Structural Steel - High Strength Bolting
NITHIN JOHN
05/23/2025
Objection resolved — Addressed
05/22/2025
Objection raised — Scope
05/12/2025
Filed — Alteration CO
FOUNDATION WORK REALTED TO THE INTERIOR & EXTERIOR RENOVATION AND VERTICAL ENLARGEMENT (NEW 4TH FLOOR) OF EXISTING CEL + 3-STORY SCHOOL AS PER PLANS FILED HEREWITH.
X00825579-P7
05/04/2025
Special inspection requirement — Concrete - Cast-In-Place
NITHIN JOHN
05/04/2025
Special inspection requirement — Open-web Steel Joists and Joist Girders
NITHIN JOHN
05/04/2025
Special inspection requirement — Structural Steel - Welding
NITHIN JOHN
05/04/2025
Special inspection requirement — Structural Steel - Details
NITHIN JOHN
05/04/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
NITHIN JOHN
05/04/2025
Special inspection requirement — Post-installed Anchors
NITHIN JOHN
05/04/2025
Special inspection requirement — Structural Cold-Formed Steel
NITHIN JOHN
05/04/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
NITHIN JOHN
05/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NITHIN JOHN
05/04/2025
Special inspection requirement — Final
NITHIN JOHN
05/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
NITHIN JOHN
02/21/2025
Violation issued (FDNY_ORDER, closed)
01/30/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
X00877118-S4
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
X00877118-S2
01/29/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
X00877118-S3
01/23/2025
Inspection — Pass-Final CO-NB Inspection Up To 4 Total Levels
Pass
View inspection ↗
01/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/12/2025
Signed off — Alteration CO
FOUNDATION WORK REALTED TO THE INTERIOR & EXTERIOR RENOVATION AND VERTICAL ENLARGEMENT (NEW 4TH FLOOR) OF EXISTING CEL + 3-STORY SCHOOL AS PER PLANS FILED HEREWITH.
X00825579-S3
01/06/2025
Permit issued — Mechanical Systems
X00825579-S1-MS
12/23/2024
Special inspection requirement — Sprayed fire-resistant materials
NITHIN JOHN
12/23/2024
Special inspection requirement — Fenestration areas
NITHIN JOHN
12/23/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
NITHIN JOHN
12/23/2024
Special inspection requirement — Interior lighting power
NITHIN JOHN
12/23/2024
Special inspection requirement — Exterior lighting power
NITHIN JOHN
12/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NITHIN JOHN
12/23/2024
Special inspection requirement — Air barrier - visual inspection
NITHIN JOHN
12/23/2024
Special inspection requirement — Air barrier — testing
NITHIN JOHN
12/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2024
Objection resolved — Addressed
12/16/2024
Objection resolved — Addressed
12/11/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
X00877118-I1
12/11/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
X00877118-S1
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBARONE MANAGEMENT LLC07/16/2025
DOB NOWMechanical SystemsSigned-offBARONE MANAGEMENT LLC01/06/2025
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/04/2024
DOB NOWSignPermit IssuedRED HOOK SIGN AND ELECT12/04/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC10/09/2024
DOB NOWGeneral ConstructionPermit IssuedBARONE MANAGEMENT LLC09/30/2024
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP09/09/2024
DOB NOWConstruction FenceSigned-offBARONE MANAGEMENT LLC08/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC08/15/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC07/22/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC07/22/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/22/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC07/11/2024
DOB NOWGeneral ConstructionPermit IssuedBARONE MANAGEMENT LLC07/03/2024
DOB NOWFoundationSigned-offBARONE MANAGEMENT LLC05/31/2024
DOB NOWSuspended ScaffoldPermit IssuedM.G.R. RESTORATION INC05/28/2024
DOB NOWGeneral ConstructionPermit IssuedBARONE MANAGEMENT LLC04/18/2024
DOB NOWStructuralSigned-offBARONE MANAGEMENT LLC09/21/2023
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP09/12/2023
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP09/12/2023
DOB NOWConstruction FenceSigned-offBARONE MANAGEMENT LLC07/25/2023
DOB NOWGeneral ConstructionPermit IssuedBARONE MANAGEMENT LLC07/24/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC07/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC07/21/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/21/2023
DOB NOWMechanical SystemsSigned-offBREEZIN H V A C04/06/2021
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING04/27/2020
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING04/27/2020
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING01/09/2020
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING01/09/2020
BISOTISSUEDHI-BUILD CONSTRUCTION COR03/13/2020
BISPLISSUEDWEXLER PLUMBING LLC03/23/2015
BIS—ISSUEDMARKIS MANAGEMENT LLC12/09/2014
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/07/2001
BISOTISSUEDWOLET CONSTRUCTION03/30/2001
1 project · most recent 05/12/2025
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/12/2025Signed-offBARONE MANAGEMENT LLCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin REYQ120XATJB 120,000 BTU · Vrf Outdoor ×3
REYQ96XATJB 96,000 BTU · Vrf Outdoor ×2
DPS020A-HME2DW-4 15 tons · Rooftop Unit ×1
RXL12WMVJU9 10,600 BTU · Pump ×1
RXL24WMVJU9 21,200 BTU · Pump ×1
Ventilation
Greenheck SP-B150 100 CFM · Exhaust Fan ×2
SQ-97-VG 400 CFM · Exhaust Fan ×2
SQ-99-VG 1,000 CFM · Exhaust Fan ×2
CUE-140-VG 1,600 CFM · Kitchen Exhaust ×1
G-300-C 8,000 CFM · Exhaust Fan ×1
SQ-120 1,280 CFM · Exhaust Fan ×1
Daikin DAHA11AHYE2DW 4,475 CFM · Erv ×2
1 project · most recent 05/12/2025
Sprinkler System
FiledStatusContractorScope
05/12/2025Signed-offDDS MECHANICAL FPS CORPSprinkler System
1 project · most recent 05/12/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/12/2025Signed-offD.D.S. MECH PBG&HTG CORPStorm, Water/Sanitary
3 projects · most recent 11/05/2024
General Wiring
FiledStatusContractorScope
11/05/2024Permit IssuedAXON ELEC'L CONTRG CORPGeneral Wiring
05/19/2023CompleteTOP SHELF ELECTRIC CORP—
01/06/2020CompleteRICHARD NEU—
2 projects · most recent 05/12/2025
Steel Concrete
FiledStatusContractorScope
05/12/2025Signed-offBARONE MANAGEMENT LLCSteel, Concrete
08/03/2023Signed-offBARONE MANAGEMENT LLC1 scope_items
1 project · most recent 06/20/2023
Fence
FiledStatusContractorScope
06/20/2023Signed-offBARONE MANAGEMENT LLCFence
1 project · most recent 09/25/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
09/25/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/23/2025Pass-Final CO-NB Inspection Up To 4 Total LevelsPassView ↗
01/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/05/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
05/30/2025Structural Stability – Alterations of existing buildingsNITHIN JOHNspecial
05/30/2025FinalNITHIN JOHNprogress
05/30/2025Concrete - Cast-In-PlaceNITHIN JOHNspecial
05/30/2025Post-installed AnchorsNITHIN JOHNspecial
05/30/2025Structural Steel - WeldingNITHIN JOHNspecial
05/30/2025Wall Panels, Curtain Walls, and VeneersNITHIN JOHNspecial
05/30/2025Structural Steel - High Strength BoltingNITHIN JOHNspecial
05/30/2025Open-web Steel Joists and Joist GirdersNITHIN JOHNspecial
05/30/2025Construction Operations Influencing Adjacent StructuresNITHIN JOHNspecial
05/30/2025Structural Cold-Formed SteelNITHIN JOHNspecial
05/30/2025Structural Steel - DetailsNITHIN JOHNspecial
05/04/2025Wall Panels, Curtain Walls, and VeneersNITHIN JOHNspecial
05/04/2025FinalNITHIN JOHNprogress
05/04/2025Structural Steel - WeldingNITHIN JOHNspecial
05/04/2025Structural Steel - High Strength BoltingNITHIN JOHNspecial
05/04/2025Structural Steel - DetailsNITHIN JOHNspecial
05/04/2025Structural Stability – Alterations of existing buildingsNITHIN JOHNspecial
05/04/2025Structural Cold-Formed SteelNITHIN JOHNspecial
05/04/2025Post-installed AnchorsNITHIN JOHNspecial
05/04/2025Open-web Steel Joists and Joist GirdersNITHIN JOHNspecial
05/04/2025Construction Operations Influencing Adjacent StructuresNITHIN JOHNspecial
05/04/2025Concrete - Cast-In-PlaceNITHIN JOHNspecial
12/23/2024Air barrier — testing NITHIN JOHNenergy_progress
12/23/2024Air barrier - visual inspectionNITHIN JOHNenergy_progress
12/23/2024Fenestration and door U-factor and product ratingsNITHIN JOHNenergy_progress
Latest 25 of 106.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Access BronxcharterEducation—
Project X01139723 Alteration · Permit Entire · 12/03/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 269 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch27
08/23/2026X00893026-I1Request digital key ↗
08/22/2026X00877118-P2Request digital key ↗
08/22/2026X00877118-S4Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/20/2026X01054416-P1Request digital key ↗
08/20/2026X01054376-P1Request digital key ↗
08/15/2026X01054416-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00290942-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026X00290943-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00476570-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION12
10/09/2024220362024Open ↗
04/29/2024200714236Open ↗
03/12/2020240270327Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION4
03/12/2020240270327Open ↗
03/23/2015220362024Open ↗
12/10/2014220362024Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/22/2014220343689Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00825579-I1Open ↗
08/13/2026X00825579-P1Open ↗
08/13/2026X00825579-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00825579-I1Open ↗
08/13/2026X00825579-P1Open ↗
08/13/2026X00825579-P2Open ↗
▸BISZoning Diagram (ZD1)1
08/21/2014220362024Open ↗
▸Seals & Professional Certifications121
▸DOB NOWProgress Inspector Seal & Signature43
09/01/2026X00825579-P7Open ↗
09/01/2026X00825579-S4Open ↗
08/30/2026X00476570-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
09/01/2026X00825579-P7Open ↗
09/01/2026X00825579-P7Open ↗
09/01/2026X00825579-P7Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/26/2026X00290943-I1Open ↗
08/26/2026X00290942-I1Open ↗
08/25/2026X00476570-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
08/21/2014220362024Open ↗
03/27/2014220362024Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/12/2020240270327Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/12/2020240270327Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/12/2020240270327Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE2
05/19/2015220362024Open ↗
05/19/2015220362024Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/12/2015220362024Open ↗
03/27/2014220362024Open ↗
▸BISSIGN HANGER CERTIFICATE1
11/21/2013220343689Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/18/2017220582304Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026X00825579-P1Open ↗
08/13/2026X00825579-I1Open ↗
08/13/2026X00825579-P2Open ↗
▸BISSTREET TREE CHECKLIST1
03/27/2014220362024Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/22/2026X00913510-I1Open ↗
08/20/2026X00825579-S3Open ↗
08/20/2026X00825579-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/12/2020240270327Open ↗
03/27/2014220362024Open ↗
11/12/2013220343689Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01139722-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/03/2014220362024Open ↗
03/27/2014220362024Open ↗
▸BISTR8: Energy Code Progress Inspections2
08/21/2014220362024Open ↗
03/27/2014220362024Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/15/2026X00825579-S2Open ↗
08/13/2026X00825579-S1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/20/2024240270327Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/20/2024240270327Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/12/2020240270327Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/12/2020240270327Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00476570-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/12/2020240270327Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/20/2024240270327Open ↗
▸BISMASONRY1
11/20/2024240270327Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00825579-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00825579-S5Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/05/2018220582304Open ↗
05/08/2014220343689Open ↗
04/22/2014220343689Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE3
08/21/2014220362024Open ↗
08/21/2014220362024Open ↗
03/27/2014220362024Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/30/2020220362024Open ↗
04/22/2014220343689Open ↗
▸BISFINAL1
11/20/2024240270327Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
05/08/2014220343689Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
03/12/2020240270327Open ↗
01/30/2020220362024Open ↗
02/05/2018220582304Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/10/2024240270327Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET3
02/08/2017220582304Open ↗
03/27/2014220362024Open ↗
11/12/2013220343689Open ↗
▸BISADDITIONAL INFORMATION3
03/10/2015220362024Open ↗
01/12/2015220362024Open ↗
01/12/2015220362024Open ↗
▸BISBOROUGH INTAKE FORM2
01/30/2020220362024Open ↗
02/05/2018220582304Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/12/2020240270327Open ↗
▸Other Documents26
▸DOB NOWPlot Diagram4
08/13/2026X00825579-P2Open ↗
08/13/2026X00825579-S5Open ↗
08/13/2026X00825579-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAlternate Plan 14
08/20/2026X01054416-P1Open ↗
08/20/2026X01054376-P1Open ↗
08/15/2026X01054416-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026X00825579-P1Open ↗
08/13/2026X00825579-P2Open ↗
08/13/2026X00825579-I1Open ↗
▸DOB NOWCalculations3
08/20/2026X01050581-P1Open ↗
08/20/2026X01050581-I1Open ↗
08/13/2026X01050581-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00825579-I1Open ↗
08/13/2026X00825579-P2Open ↗
08/13/2026X00825579-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026X00825579-I1Open ↗
08/15/2026X00825579-P1Open ↗
08/14/2026X00825579-P2Open ↗
▸DOB NOWManufacturer's Specifications3
08/20/2026X01050581-I1Open ↗
08/13/2026X01050581-P2Open ↗
08/13/2026X01050581-P1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/22/2014220343689Open ↗
▸BISPLOT DIAGRAM1
03/27/2014220362024Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00825579-I1Open ↗