← Back
Three families
629 EAST 28 STREET
BROOKLYN · Flatbush · BIN 3121679
💬 Discuss this project
1901Year Built
2.5Stories
C0Building Class
R5BZoning
2,610 sfGross Floor Area
3Units
Rent Stabilized36 Open Violations 35 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: 629 E 28 ST LLC · 3,500 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PREMIER CONTRACTING USA704/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/17/2025$876K—Private party → 629 E 28 123 LLC$336/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHANDA ENGINEERING CONSULTANT PC201/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PREMIER CONTRACTING USA IGeneral Contractor104/09/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842201/18/2026
Building Lifecycle
All (60)Filed (2)Permit Issued (2)Signed Off (2)Violation (47)Inspection (4)Special Inspection (3)
08/12/2026
Signed off — Alteration
IN CELLAR REMOVE 1 EXISTING BOILER & HWH, REPLACE WIITH 3 BOILERS AND 3 HWH USING APPROX.100FT.OF 1''& 30 FT.OF 3/4''BLACK PIPE.WILL UPGRADE 3 EXISTING GAS METER BARS,ALL EQUIPMENT VENTS THRU EXISTING CHIMNEY WHICH IS IN GOOD WORKING CONDITION.
B01319701-S1
05/04/2026
Violation issued (HPD, open)
A
04/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2026
Signed off — Alteration
IN CELLAR REMOVE 1 EXISTING BOILER & HWH, REPLACE WIITH 3 BOILERS AND 3 HWH USING APPROX.100FT.OF 1''& 30 FT.OF 3/4''BLACK PIPE.WILL UPGRADE 3 EXISTING GAS METER BARS,ALL EQUIPMENT VENTS THRU EXISTING CHIMNEY WHICH IS IN GOOD WORKING CONDITION.
B01319701-I1
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/22/2026
Permit issued — Plumbing
B01319701-S1-PL
01/18/2026
Filed — Alteration
IN CELLAR REMOVE 1 EXISTING BOILER & HWH, REPLACE WIITH 3 BOILERS AND 3 HWH USING APPROX.100FT.OF 1''& 30 FT.OF 3/4''BLACK PIPE.WILL UPGRADE 3 EXISTING GAS METER BARS,ALL EQUIPMENT VENTS THRU EXISTING CHIMNEY WHICH IS IN GOOD WORKING CONDITION.
B01319701-S1
12/04/2025
Permit issued — General Construction
B01319701-I1-GC
11/26/2025
Filed — Alteration
IN CELLAR REMOVE 1 EXISTING BOILER & HWH, REPLACE WIITH 3 BOILERS AND 3 HWH USING APPROX.100FT.OF 1''& 30 FT.OF 3/4''BLACK PIPE.WILL UPGRADE 3 EXISTING GAS METER BARS,ALL EQUIPMENT VENTS THRU EXISTING CHIMNEY WHICH IS IN GOOD WORKING CONDITION.
B01319701-I1
11/18/2025
Violation issued (HPD, open)
I
11/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
11/15/2025
Special inspection requirement — Final
KARTIK CHANDA
11/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
KARTIK CHANDA
06/09/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/09/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
03/22/2023
Violation issued (HPD, open)
A
11/07/2022
Violation issued (HPD, open)
I
02/24/2022
Violation issued (HPD, open)
A
02/24/2022
Violation issued (HPD, open)
I
04/08/2021
Violation issued (HPD, open)
I
04/08/2021
Violation issued (HPD, open)
A
10/30/2019
Violation issued (HPD, open)
I
11/10/2018
Violation issued (ECB, closed)
Construction
11/10/2018
Violation issued (ECB, closed)
Construction
10/17/2018
Violation issued (HPD, open)
I
09/13/2018
Violation issued (ECB, closed)
Construction
09/13/2018
Violation issued (ECB, closed)
Construction
07/20/2018
Violation issued (ECB, closed)
Construction
07/20/2018
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (ECB, open)
Construction
05/16/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/30/2018
Violation issued (ECB, closed)
Construction
03/30/2018
Violation issued (ECB, closed)
Construction
02/27/2018
Violation issued (HPD, open)
B
02/16/2018
Violation issued (HPD, open)
B
02/16/2018
Violation issued (HPD, open)
B
02/13/2018
Violation issued (HPD, open)
B
02/13/2018
Violation issued (ECB, open)
Construction
02/13/2018
Violation issued (ECB, open)
Construction
02/13/2018
Violation issued (HPD, open)
C
02/13/2018
Violation issued (HPD, open)
B
02/13/2018
Violation issued (HPD, open)
C
02/13/2018
Violation issued (HPD, open)
C
02/13/2018
Violation issued (HPD, open)
C
02/11/2018
Violation issued (HPD, open)
B
11/21/2017
Violation issued (HPD, open)
I
11/07/2016
Violation issued (HPD, open)
I
10/08/2015
Violation issued (HPD, open)
I
02/18/2015
Violation issued (HPD, open)
I
06/01/1984
Violation issued (HPD, open)
B
06/01/1984
Violation issued (HPD, open)
A
06/01/1984
Violation issued (HPD, open)
A
06/01/1984
Violation issued (HPD, open)
A
06/01/1984
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C01/22/2026
DOB NOWGeneral ConstructionSigned-offPREMIER CONTRACTING USA I12/04/2025
1 project · most recent 01/18/2026
Gas
FiledStatusContractorScope
01/18/2026Signed-off5 BORO'S PLUMBING INCGas
2 projects · most recent 10/08/2025
FiledStatusContractorScope
10/08/2025CompleteGREEN POWER ELECTRIC CORP4 meters, 4 new_meters
12/28/2023Permit IssuedWATTS ELECTRICAL CORP3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/15/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
11/15/2025FinalKARTIK CHANDAprogress
11/15/2025Fire-Resistance Rated ConstructionKARTIK CHANDAprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026B01319701-I1Request digital key ↗
08/19/2026B01319701-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026B01319701-I1Open ↗
08/19/2026B01319701-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01319701-I1Open ↗
08/28/2026B01319701-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01319701-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01319701-I1Open ↗
08/19/2026B01319701-S1Open ↗