← Back
Walk-up apt, over six families with stores
629 LENOX AVENUE
MANHATTAN · BIN 1060092
💬 Discuss this project
1910Year Built
6Stories
C7Building Class
R7-2Zoning
14,819 sfGross Floor Area
16Units
Rent Stabilized2 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 4,000 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 2 filings · 20 docs
Floor 61p · 1 filing · 13 docs
Floor 51p · 1 filing · 13 docs
Floor 41p · 1 filing · 13 docs
Floor 31p · 1 filing · 13 docs
Floor 21p · 1 filing · 13 docs
Floor 1
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE2804/09/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
HPD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC801/28/2026
ASHRAF CORP104/30/2025
SYNERGIC DESIGN ARCHITECTS101/13/2025
ARQUITECTURA VARELA110/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA SCAFFOLDING INCGeneral Contractor404/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
HORIZON CONSTRUCTION INCGeneral Contractor304/09/2026
ACCORD POWER INCGeneral Contractor203/21/2026
CESPEDES, FAUSTOElectrical103/21/2026
SPEZIALE, JOSEPHElectrical103/21/2026
PEREZ, RICARDOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983701/28/2026
SYNERGIC DESIGN LLC8561101/13/2025
Building Lifecycle
All (116)Filed (11)Permit Issued (8)Signed Off (5)Violation (60)Inspection (6)Objection (4)Special Inspection (22)
05/14/2026
Violation issued (HPD, closed)
C
05/14/2026
Violation issued (HPD, open)
B
05/14/2026
Violation issued (HPD, open)
C
05/14/2026
Violation issued (HPD, closed)
C
05/14/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
A
04/08/2026
Inspection — Pass Boiler Equipment Inspection
Pass
View inspection ↗
04/08/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/25/2026
Permit issued — Boiler Equipment
M01328939-I1-BE
03/25/2026
Permit issued — Boiler Equipment
M01328939-S1-BE
03/19/2026
Signed off — Alteration
INSTALLATION OF INDIRECT HWH TO REPLACE EXISTING HOT WATER HEATER GAS PIPING FOR BOILER. AS PER PLAN IN CONJUNCTION TO M00826945-I1., M01328939-I1 , M01328939-S1 FOR BOILER INSTALL NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS FILING
M01055178-I1
02/12/2026
Signed off — Alteration
Interior work at common space of building and roof. All Exterior work is as per plan. No change to use, egress, or occupancy under this filing.
M00826945-I1
01/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2026
Filed — Alteration
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
M01328939-S1
01/28/2026
Filed — Alteration
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
M01328939-I1
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/19/2025
Filed — Alteration
INSTALLATION OF INDIRECT HWH TO REPLACE EXISTING HOT WATER HEATER GAS PIPING FOR BOILER. AS PER PLAN IN CONJUNCTION TO M00826945-I1., M01328939-I1 , M01328939-S1 FOR BOILER INSTALL NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS FILING
M01055178-P2
11/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2025
Permit issued — General Construction
M00826945-I1-GC
10/11/2025
Signed off — Alteration
M01120920-I1
10/11/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01215628-I1
09/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2025
Violation issued (HPD, closed)
C
07/25/2025
Filed — Alteration
INSTALLATION OF INDIRECT HWH TO REPLACE EXISTING HOT WATER HEATER GAS PIPING FOR BOILER. AS PER PLAN IN CONJUNCTION TO M00826945-I1., M01328939-I1 , M01328939-S1 FOR BOILER INSTALL NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS FILING
M01055178-P1
05/08/2025
Signed off — Alteration
Installation of 8 kw solar energy system on roof. No change of occupancy, use or egress.
M01128011-I1
05/01/2025
Permit issued — Supported Scaffold
M01215628-I1-SF
04/30/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01215628-I1
03/21/2025
Permit issued — Plumbing
M01055178-I1-PL
02/13/2025
Permit issued — Solar
M01128011-I1-SL
01/13/2025
Filed — Alteration
Installation of 8 kw solar energy system on roof. No change of occupancy, use or egress.
M01128011-I1
10/24/2024
Permit issued — General Construction
M00826945-I1-GC
10/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
10/16/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
10/16/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
10/04/2024
Filed — Alteration
M01120920-I1
10/04/2024
Permit issued — Sidewalk Shed
M01120920-I1-SH
06/13/2024
Filed — Alteration
INSTALLATION OF INDIRECT HWH TO REPLACE EXISTING HOT WATER HEATER GAS PIPING FOR BOILER. AS PER PLAN IN CONJUNCTION TO M00826945-I1., M01328939-I1 , M01328939-S1 FOR BOILER INSTALL NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS FILING
M01055178-I1
06/13/2024
Filed — Alteration
Interior work at common space of building and roof. All Exterior work is as per plan. No change to use, egress, or occupancy under this filing.
M00826945-P1
06/13/2024
Filed — Alteration
Solar Panel Installation at Roof. No change to use, egress, or occupancy under this filing.
M01055887-I1
05/31/2024
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
05/31/2024
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
05/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/23/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
05/23/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/23/2024
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
05/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/10/2024
Violation issued (HPD, closed)
C
05/10/2024
Violation issued (HPD, closed)
C
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.03/25/2026
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.03/25/2026
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWSupported ScaffoldSigned-offALPHA SCAFFOLDING INC05/01/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/21/2025
DOB NOWSolarSigned-offACCORD POWER INC02/13/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/24/2024
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC10/04/2024
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTIN CO04/26/2005
BISEQISSUEDPYTHAZORAS GENERAL CONTRACTIN CO04/22/2005
BISPLISSUEDPVTHAGORAS GENERAL CONTRACITNG01/31/2005
BISEQISSUEDPYTHAZORAS GENERAL CONTRACTIN CO12/28/2004
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTIN CO07/08/2004
BISEQISSUEDPYTHAZORAS GENERAL CONTRACTIN CO06/30/2004
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTIN CO06/23/2003
BISOTISSUEDNATIONAL GEN. CONT.02/01/2000
BISOTISSUEDBARNETT IRON ASSOCIATES07/07/1997
BISBLISSUEDBONAFIDE F.O.CO.,INC..06/16/1994
BISFPISSUEDFIRE FOE CORP07/06/1992
2 projects · most recent 01/13/2025
FiledStatusContractorScope
01/13/2025CompleteACCORD POWER ELECTRIC LLC—
10/04/2024CompleteRICHARD NEU—
1 project · most recent 06/13/2024
FiledStatusContractorScope
06/13/2024——18 panels, 7.2 kw, 2,798 roof_area_sqft
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/08/2026Pass Boiler Equipment InspectionPassView ↗
04/08/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/13/2025Tenant Protection Plan Compliance—special
10/16/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
10/16/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
10/16/2024FinalMalathi Ananthakrishnanprogress
10/16/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
10/16/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
05/31/2024Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/31/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/31/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
05/31/2024FinalALEXIS SCHLESSINGERMANprogress
05/31/2024Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
05/23/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/23/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
05/23/2024FinalALEXIS SCHLESSINGERMANprogress
05/23/2024Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
05/23/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026M00826945-I1Request digital key ↗
08/28/2026M00826945-P1Request digital key ↗
08/27/2026M01055887-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026M00826945-I1Open ↗
08/28/2026M00826945-P1Open ↗
08/27/2026M01055887-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026M00826945-P1Open ↗
08/28/2026M01128011-I1Open ↗
08/28/2026M01128011-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026M01128011-I1Open ↗
08/28/2026M01128011-I1Open ↗
08/28/2026M00826945-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026M00826945-I1Open ↗
08/28/2026M00826945-P1Open ↗
08/27/2026M01055887-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/19/2026M01328939-I1Open ↗
08/19/2026M01328939-S1Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/22/2026M01055178-P2Open ↗
08/22/2026M01055178-P1Open ↗
08/22/2026M01055178-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01128011-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00826945-I1Open ↗
08/13/2026M00826945-P1Open ↗