63-18 FRESH POND ROAD
QUEENS · BIN 4084604
💬 Discuss this project
1925Year Built
2Stories
K4Building Class
R5BZoning
2,910 sfGross Floor Area
1Units
0 Open Violations
Predominantly retail with other uses · Owner of record: 6318 FRESH POND REALTY LLC · 2,488 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 13p · 3 filings · 20 docs
Cellar8p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KOBY ENTERPRISES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2021$1000K—KOBY ENTERPRISES LLC → 6318 FRESH POND REALTY LLC$344/sf building
03/21/2017$388K—— → —$133/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO2203/21/2026
HIGH QUALITY 3381003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor707/08/2026
CATMAN PLUMBING INCPlumbing207/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
HAPPY HOUSE CONSTRUCTIONGeneral Contractor107/08/2026
JCM PRO BUILDERS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778207/12/2023
BILLAH ENGINEERING5838210/15/2021
J&R DESIGN AND INSPECTION6637409/17/2021
Building Lifecycle
All (80)Filed (16)Permit Issued (15)Signed Off (8)Violation (10)Inspection (1)Special Inspection (30)
08/03/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485749-I1
07/14/2023
Signed off — Alteration
INSTALL (2) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q08022808-I1
07/14/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485751-I1
07/14/2023
Special inspection requirement — Final
XIONGCAI GU
07/14/2023
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
07/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
07/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
07/12/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485749-P3
07/12/2023
Special inspection requirement — Final
XIONGCAI GU
07/12/2023
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
07/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2022
Filed — Alteration
INSTALL (2) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q08022808-P3
11/23/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/22/2022
Filed — Alteration
INSTALL (2) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q08022808-P2
10/27/2022
Signed off — Alteration
Q00477859-I1
10/20/2022
Permit issued — Boiler Equipment
Q08022808-I1-BE
10/19/2022
Filed — Alteration
INSTALL (2) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q08022808-P1
10/18/2022
Filed — Alteration
INSTALL (2) NEW BOILERS FOR EXISTING BUILDING ON CELLAR AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q08022808-I1
10/11/2022
Signed off — Alteration
RENOVATION OF PROPOSED LAUNDROMAT WITH INSTALL NEW DUCTLESS A/C, EXHAUST DUCT AS PER PLAN. THIS APPLICATION CONJUNCTION WITH JOB#Q00477859. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00478305-I1
09/23/2022
Signed off — Alteration
RENOVATION OF PROPOSED LAUNDROMAT WITH, NEW DRYER, WASHER AND SPRINKLER HEAD, HOT WATER HEATER AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00477814-I1
09/12/2022
Permit issued — Sprinklers
Q00477814-I1-EW-SP
08/18/2022
Signed off — Alteration
Q00477785-I1
06/13/2022
Permit issued — Plumbing
Q00477814-I1-EW-SP
12/03/2021
Signed off — Alteration
Q00549134-I1
10/15/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485751-P1
10/15/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485749-P2
10/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
10/15/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BILLAH
10/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BILLAH
09/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
09/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
09/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
09/22/2021
Special inspection requirement — Sprinkler Systems
Robert Truskosky
09/22/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
09/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
09/18/2021
Violation issued (ECB, closed)
Construction
09/17/2021
Filed — Alteration
RENOVATION OF PROPOSED LAUNDROMAT WITH, NEW DRYER, WASHER AND SPRINKLER HEAD, HOT WATER HEATER AND PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00477814-P1
09/17/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
09/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
09/17/2021
Special inspection requirement — Sprinkler Systems
Robert Truskosky
09/17/2021
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
09/17/2021
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
09/17/2021
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
08/10/2021
Permit issued — Construction Fence
Q00549134-I1-FN
06/29/2021
Filed — Alteration
Q00549134-I1
06/17/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485749-P1
06/16/2021
Permit issued — Sprinklers
Q00477814-I1-PL
05/06/2021
Permit issued — Construction Fence
Q00477785-I1-FN
05/04/2021
Permit issued — Mechanical Systems
Q00478305-I1-MS
05/04/2021
Permit issued — General Construction
Q00477859-I1-GC
03/29/2021
Permit issued — General Construction
Q00485749-I1-GC
03/25/2021
Permit issued — Sprinklers
Q00477814-I1-EW-SP
03/24/2021
Permit issued — Plumbing
Q00485751-I1-PL
03/17/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485749-I1
03/17/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00485751-I1
03/17/2021
Permit issued — Sprinklers
Q00477814-I1-PL
03/09/2021
Permit issued — Mechanical Systems
Q00478305-I1-MS
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCATMAN PLUMBING INC10/20/2022
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN09/12/2022
DOB NOWPlumbingSigned-offRALPH W. LANDOLFI JR.06/13/2022
DOB NOWConstruction FenceSigned-offJCM PRO BUILDERS LLC08/10/2021
DOB NOWSprinklersSigned-offAMERICAN STANDARD P&H CORORP.06/16/2021
DOB NOWConstruction FenceSigned-offHIGH QUALITY CONSTRUCTION05/06/2021
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION05/04/2021
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION05/04/2021
DOB NOWGeneral ConstructionSigned-offHAPPY HOUSE CONSTRUCTION03/29/2021
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.03/25/2021
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC03/24/2021
DOB NOWSprinklersSigned-offNICHOLAS SUIDA03/17/2021
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION03/09/2021
DOB NOWConstruction FenceSigned-offHIGH QUALITY CONSTRUCTION03/03/2021
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION03/03/2021
3 projects · most recent 10/27/2021
General Wiring
FiledStatusContractorScope
10/27/2021CompleteKJK ELECTRIC INCGeneral Wiring
09/29/2021CompleteGOODALL ELECTRIC CORP4 meters, 4 new_meters
03/16/2021CompleteGOODALL ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/23/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
07/14/2023FinalXIONGCAI GUprogress
07/14/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
07/14/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
07/14/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
07/12/2023FinalXIONGCAI GUprogress
07/12/2023Energy Code Compliance InspectionsXIONGCAI GUprogress
07/12/2023Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
07/12/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
10/15/2021Fire-Resistant Penetrations and JointsMOHAMMAD BILLAHspecial
10/15/2021Energy Code Compliance InspectionsMOHAMMAD BILLAHprogress
10/15/2021Fire-Resistance Rated ConstructionMOHAMMAD BILLAHprogress
09/22/2021HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
09/22/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
09/22/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
09/22/2021Sprinkler SystemsRobert Truskoskyspecial
09/22/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
09/22/2021HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
09/17/2021HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
09/17/2021Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
09/17/2021Sprinkler SystemsRobert Truskoskyspecial
09/17/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
09/17/2021HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
09/17/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
03/01/2021HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
03/01/2021Energy Code Compliance InspectionsRobert Truskoskyprogress
Latest 25 of 40.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/27/2026Q00477785-I1Request digital key ↗
08/27/2026Q00477859-I1Request digital key ↗
08/27/2026Q00478305-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature18
08/31/2026Q00477859-I1Open ↗
08/31/2026Q00477859-I1Open ↗
08/26/2026Q00485749-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/27/2026Q00477785-I1Open ↗
08/27/2026Q00477859-I1Open ↗
08/27/2026Q00549134-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026Q00477859-I1Open ↗
08/26/2026Q00485749-I1Open ↗
08/25/2026Q00478305-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00477859-I1Open ↗
08/27/2026Q00477814-I1Open ↗
08/27/2026Q00477814-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00478305-I1Open ↗
08/13/2026Q00477859-I1Open ↗
08/13/2026Q00477814-I1Open ↗