← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Ridgewood Condominium
63-34 FRESH POND ROAD · BIN 4084665
💬 Discuss this project
2013Year Built
5Stories
RMBuilding Class
R6BZoning
17,884 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 9,797 sf lot · 1.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof7p · 1 filing · 18 docs
Floor 57p · 1 filing · 18 docs
Floor 47p · 1 filing · 18 docs
Floor 37p · 1 filing · 18 docs
Floor 28p · 1 filing · 18 docs
Floor 18p · 1 filing · 18 docs
Cellar8p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MSDA INC203/22/2026
CEPRINE CONSTRUCTION203/22/2026
TAHOE DEVELOPMENT103/22/2026
MDSA203/22/2026
6334 FRESH POND3503/22/2026
CEPRINE SCAFFOLDING SERVICES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN D CALCAGNILE ARCHITECT507/24/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VICTOR RODRIGUEZElectrical503/21/2026
VICTORY PLBG & HTG INCPlumbing307/08/2026
VICTORY PLBG HTGGeneral Contractor203/22/2026
NEFCO ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803507/24/2024
Building Lifecycle
All (55)Filed (5)Permit Issued (2)Signed Off (1)Violation (22)Inspection (7)Objection (12)Special Inspection (6)
05/08/2026
Violation issued (HPD, closed)
A
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
08/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
08/09/2024
Objection resolved — Addressed
07/25/2024
Objection raised — Structural
07/24/2024
Filed — Alteration CO
Interior remodeling of existing first floor Professional Office to new Class"A" dwelling unit and obtain new amended C of O from a 28 Unit Multiple Dwelling to 29 Unit Multiple Dwelling Building.
Q00737435-P2
07/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
07/03/2024
Violation issued (ECB, closed)
Construction
04/26/2024
Signed off — Alteration
Cap & remove all existing plumbing fixtures in existing 1st floor Professional Office. Install new plumbing fixtures for (1) New Class "A" Dwelling Unit asperplans filed. This application is being filed inconjunctionwith Alt.-CO Application # Q00737435-I1
Q00737691-I1
02/26/2024
Violation issued (HPD, closed)
B
02/26/2024
Violation issued (HPD, closed)
B
11/03/2023
Violation issued (HPD, closed)
C
03/31/2023
Violation issued (HPD, closed)
A
02/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2023
Filed — Alteration CO
Interior remodeling of existing first floor Professional Office to new Class"A" dwelling unit and obtain new amended C of O from a 28 Unit Multiple Dwelling to 29 Unit Multiple Dwelling Building.
Q00737435-P1
01/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
01/02/2023
Filed — Alteration
Cap & remove all existing plumbing fixtures in existing 1st floor Professional Office. Install new plumbing fixtures for (1) New Class "A" Dwelling Unit asperplans filed. This application is being filed inconjunctionwith Alt.-CO Application # Q00737435-I1
Q00737691-P1
01/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
12/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2022
Permit issued — Plumbing
Q00737691-I1-PL
10/18/2022
Permit issued — General Construction
Q00737435-I1-GC
07/29/2022
Filed — Alteration
Cap & remove all existing plumbing fixtures in existing 1st floor Professional Office. Install new plumbing fixtures for (1) New Class "A" Dwelling Unit asperplans filed. This application is being filed inconjunctionwith Alt.-CO Application # Q00737435-I1
Q00737691-I1
07/28/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/25/2022
Objection raised — Structural
05/25/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Accessibility
05/25/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Zoning
05/25/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Fire_Protection
05/25/2022
Objection resolved — Addressed
05/25/2022
Objection raised — Zoning
05/25/2022
Objection resolved — Addressed
05/16/2022
Filed — Alteration CO
Interior remodeling of existing first floor Professional Office to new Class"A" dwelling unit and obtain new amended C of O from a 28 Unit Multiple Dwelling to 29 Unit Multiple Dwelling Building.
Q00737435-I1
04/20/2021
Violation issued (HPD, closed)
A
11/06/2019
Violation issued (HPD, closed)
I
08/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2016
Violation issued (HPD, closed)
C
06/18/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/23/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/06/2014
Violation issued (ECB, closed)
Elevators
05/28/2014
Violation issued (ECB, closed)
Construction
12/10/2013
Violation issued (ECB, closed)
Construction
12/10/2013
Violation issued (ECB, closed)
Construction
05/22/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2013
Violation issued (ECB, closed)
Construction
02/25/2013
Violation issued (ECB, closed)
Construction
02/13/2013
Violation issued (ECB, closed)
Construction
02/13/2013
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offVICTORY PLBG & HTG INC10/24/2022
DOB NOWGeneral ConstructionPermit IssuedNEFCO ENTERPRISES INC10/18/2022
BISPLISSUEDA&H EXPRESS PLBG&HTG CORP10/16/2014
BIS—ISSUEDTAHOE DEVELOPMENT CORP09/22/2014
BISEQISSUEDTAHOE DEVELOPMENT CORP09/22/2014
BISMHISSUEDTAHOE DEVELOPMENT CORP09/19/2014
BISEQISSUEDTAHOE DEVELOPMENT CORP03/25/2014
BIS—ISSUEDTAHOE DEVELOPMENT CORP03/25/2014
BIS—ISSUEDTAHOE DEVELOPMENT CORP03/25/2014
BISEQISSUEDTAHOE DEVELOPMENT CORP03/11/2014
BISMHISSUEDTAHOE DEVELOPMENT CORP03/11/2014
BISSPISSUEDDEPENDABLE MECHANICAL COR01/17/2014
BISEQISSUEDCEPRINE CONSTRUCTION INC11/20/2013
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP11/14/2013
BISMHISSUEDTAHOE DEVELOPMENT CORP11/06/2013
BISCCISSUEDTAHOE DEVELOPMENT CORP08/05/2013
BIS—ISSUEDTAHOE DEVELOPMENT CORP08/02/2013
BIS—ISSUEDTAHOE DEVELOPMENT CORP04/26/2013
BISEQISSUEDTAHOE DEVELOPMENT CORP04/26/2013
BISOTISSUEDTAHOE DEVELOPMENT CORP04/18/2013
BISEQISSUEDTAHOE DEVELOPMENT CORP04/17/2013
BISEQISSUEDMDSA INC12/24/2012
BIS—ISSUEDMDSA INC12/24/2012
1 project · most recent 10/23/2022
General Wiring
FiledStatusContractorScope
10/23/2022CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2022Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/20/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
08/20/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
07/14/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/14/2024Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
01/05/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/02/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
▾Documents — 216 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00737691-I1Request digital key ↗
08/26/2026Q00737691-P1Request digital key ↗
08/25/2026Q00737435-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION22
07/10/2015420804678Open ↗
05/27/2015420823568Open ↗
04/30/2015420865326Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION16
10/28/2014420865326Open ↗
10/01/2014420865326Open ↗
10/01/2014420804678Open ↗
Showing 3 of 16 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
07/15/2015420823568Open ↗
05/29/2015420865326Open ↗
03/11/2015420832282Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/16/2015420804678Open ↗
▸BISDOT Permit - House Connection1
07/13/2015420825557Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM1
04/26/2013420804678Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00737435-I1Open ↗
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
03/24/2015420804678Open ↗
03/21/2015420823559Open ↗
10/23/2014440116731Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00737691-P1Open ↗
08/26/2026Q00737691-I1Open ↗
08/13/2026Q00737435-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00737691-P1Open ↗
08/25/2026Q00737435-P2Open ↗
08/24/2026Q00737691-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/20/2013440116759Open ↗
11/19/2013440116731Open ↗
11/08/2013420916799Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/20/2013440116759Open ↗
11/19/2013440116731Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/20/2013440116759Open ↗
11/19/2013440116731Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q00737435-P2Open ↗
08/22/2026Q00737435-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/08/2013420916799Open ↗
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE4
02/21/2015420916799Open ↗
11/24/2014420916799Open ↗
07/11/2014420865326Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
02/21/2015420916799Open ↗
11/24/2014420916799Open ↗
▸BISEQUIPMENT USE PERMITS2
05/29/2015420865326Open ↗
05/29/2015420865326Open ↗
▸BISSCHEDULE B - PLUMBING2
11/08/2013420916799Open ↗
07/05/2013420865326Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
01/08/2015420916799Open ↗
12/26/2014420865326Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
02/04/2015420916799Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
02/04/2015420916799Open ↗
▸BISWATER METER PERMIT : DEP-METER1
02/04/2015420916799Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/29/2015420865326Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
02/02/2015420804678Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
01/12/2015420812552Open ↗
▸Safety & Tenant Protection10
▸BISDS1-Demolition Submittal Certification Form3
01/10/2013420630892Open ↗
01/10/2013420630892Open ↗
10/11/2012420630892Open ↗
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00737435-I1Open ↗
08/13/2026Q00737435-P1Open ↗
08/13/2026Q00737435-P2Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/28/2013420804678Open ↗
▸BISStreet Trees- Receipt of Street Trees Site Plan1
01/21/2015420804678Open ↗
▸BISSTREET TREES SITE PLAN1
03/27/2015420804678Open ↗
▸BISSTREET TREE CHECKLIST1
01/24/2013420804678Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
05/29/2015420865326Open ↗
03/24/2015420804678Open ↗
12/09/2013420812552Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
05/29/2015420865326Open ↗
03/24/2015420804678Open ↗
03/11/2015420812552Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/20/2013440116759Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/01/2013420804678Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/24/2015420804678Open ↗
05/01/2013420804678Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
05/01/2013420804678Open ↗
04/26/2013420804678Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/20/2013440116759Open ↗
11/19/2013440116731Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/01/2013420804678Open ↗
▸BISDEP Hydrant Flow Test Letter1
11/08/2013420916799Open ↗
▸Approvals, Objections & Sign-offs46
▸BISLETTERS - SUPPORTING DOCUMENTATION21
07/13/2015420825557Open ↗
07/13/2015420825557Open ↗
07/13/2015420825557Open ↗
Showing 3 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
07/15/2015420823568Open ↗
07/15/2015420804678Open ↗
06/29/2015420804678Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
03/31/2015421093738Open ↗
12/10/2013420812552Open ↗
11/08/2013420916799Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/09/2015420804678Open ↗
01/15/2015420804678Open ↗
08/07/2013420804678Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
02/04/2015420916799Open ↗
▸BISSUPERSEDING LETTER1
10/28/2014420865326Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT4
03/11/2015420812552Open ↗
03/07/2015420823559Open ↗
12/09/2013420812552Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/27/2014420804678Open ↗
05/01/2013420804678Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
03/31/2015421093738Open ↗
03/28/2015420804678Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
07/13/2015420825557Open ↗
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET12
03/31/2015421093738Open ↗
12/09/2013420812552Open ↗
11/08/2013420916799Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION8
06/20/2015420804678Open ↗
04/23/2015420916799Open ↗
03/30/2015420804678Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
11/20/2013440116759Open ↗
11/19/2013440116731Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/03/2015420825557Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification3
08/13/2026Q00737435-P2Open ↗
08/13/2026Q00737435-P1Open ↗
08/13/2026Q00737435-I1Open ↗
▸BISPLOT DIAGRAM1
01/24/2013420804678Open ↗
▸BISDRY PIPE VALVE TEST : FP-101
02/21/2015420916799Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00737435-I1Open ↗