← Back
Three families
63-49 75 PLACE
QUEENS · BIN 4069037
💬 Discuss this project
1960Year Built
3Stories
C0Building Class
R4BZoning
3,250 sfGross Floor Area
3Units
12 Open Violations ▸
Three families · 2,700 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 3 docs
Cellar2p · 1 filing · 16 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2024$1.3M—Private party → Private party$409/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC506/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
S.A.L. ELECTRIC CO INC.Electrical103/22/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402306/18/2025
Building Lifecycle
All (48)Filed (5)Permit Issued (3)Signed Off (1)Violation (21)Inspection (6)Objection (6)Special Inspection (6)
11/05/2025
Objection resolved — Addressed
11/05/2025
Objection resolved — Addressed
11/05/2025
Objection resolved — Addressed
08/18/2025
Objection raised — Zoning
08/18/2025
Objection raised — Scope
07/18/2025
Objection raised — Cost
06/18/2025
Filed — Alteration
PERFORM INTERIOR RENOVATION AND RESTORE BACK THE LEGAL CONDITON OF PARTIAL 1ST FLOOR ONLY TO CURE ECB VIOLATIONS #35690592L; 35690593N. NO CHANGE IN USE, OCCUPANCY OR EGREE.
Q01243616-I1
06/06/2025
Violation issued (ECB, open)
Unknown
06/06/2025
Violation issued (ECB, open)
Construction
04/09/2025
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#
Q01113304-S1
03/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2025
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#
Q01113304-P3
02/17/2025
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#
Q01113304-P1
01/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
01/31/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
01/31/2025
Special inspection requirement — Maintenance information
BRIAN ILL
01/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
01/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
01/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
01/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/05/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/25/2024
Permit issued — General Construction
Q01113304-I1-GC
11/21/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/22/2024
Permit issued — Plumbing
Q01113304-S1-PL
10/21/2024
Permit issued — General Construction
Q01113304-I1-GC
10/14/2024
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#
Q01113304-S1
10/14/2024
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#
Q01113304-I1
09/13/2024
Violation issued (ECB, closed)
Construction
12/10/2023
Violation issued (HPD, open)
B
11/09/2023
Violation issued (HPD, open)
C
11/09/2023
Violation issued (HPD, open)
B
11/09/2023
Violation issued (HPD, open)
B
11/09/2023
Violation issued (HPD, open)
B
11/09/2023
Violation issued (HPD, open)
B
11/09/2023
Violation issued (HPD, open)
C
11/09/2023
Violation issued (HPD, open)
C
11/09/2023
Violation issued (HPD, open)
B
11/09/2023
Violation issued (HPD, open)
A
11/09/2023
Violation issued (HPD, closed)
C
08/08/2009
Violation issued (ECB, closed)
Unknown
10/02/2007
Violation issued (ECB, closed)
Quality of Life
10/02/2007
Violation issued (ECB, closed)
Plumbing
06/20/2007
Violation issued (ECB, closed)
Quality of Life
06/06/2007
Violation issued (ECB, closed)
Quality of Life
06/05/2007
Violation issued (ECB, closed)
Quality of Life
11/19/2005
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/25/2024
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG10/22/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC10/21/2024
1 project · most recent 02/25/2025
Gas
FiledStatusContractorScope
02/25/2025Signed-offWATSON'S PLBG, HTG, & BDGGas
1 project · most recent 07/11/2018
FiledStatusContractorScope
07/11/2018CompleteS.A.L. ELECTRIC CO INC.—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/05/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/21/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/31/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
01/31/2025Energy Code Compliance InspectionsBRIAN ILLprogress
01/31/2025Maintenance informationBRIAN ILLenergy_progress
01/31/2025HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
01/31/2025HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
01/31/2025HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01113304-S1Request digital key ↗
08/21/2026Q01113304-I1Request digital key ↗
08/21/2026Q01113304-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01113304-I1Open ↗
08/21/2026Q01113304-P3Open ↗
08/21/2026Q01113304-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/23/2026Q01113304-P1Open ↗
08/23/2026Q01113304-P1Open ↗
08/23/2026Q01113304-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01113304-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q01113304-I1Open ↗
08/21/2026Q01113304-P3Open ↗
08/19/2026Q01243616-I1Open ↗