← Back
BuildNYC
Elevator apt, semi-fireproof with stores
The Austin
63-68 AUSTIN STREET · Rego Park · BIN 4072830
💬 Discuss this project
2022Year Built
9Stories
D7Building Class
—Zoning
79,081 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized0 Active Violations
Elevator apt, semi-fireproof with stores · Owner of record: Austin Plaza · 13,725 sf lot · 5.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects1 filing
RoofSupermarket interior mechanical renovationUnder Construction6p · 5 filings · 20 docs
Floor 7Unit 7C
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Storefront Canopy InstallationUnder Construction5p · 7 filings · 20 docs
Site & exteriorLush Garden Nail SpaUnder Construction7 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Austin Plaza1003/22/2026
DOB Services704/09/2026
Platinum303/22/2026
Asia Buildings203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2021$10.5M—— → —— not available
11/15/2018$6.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC Expediting1003/21/2026
Rigid Structural Design703/21/2026
Angelo NG + Anthony NG Architects4303/21/2026
Dal H Chun Engineer203/21/2026
Metro Vibe203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAA General ConstructionGeneral Contractor3107/08/2026
AAA General ConstructionScaffold707/08/2026
RRP PlumbingFire Protection607/08/2026
Tri Borough ScaffoldingScaffold507/08/2026
MC SuperstructureScaffold507/08/2026
FRSS GroupGeneral Contractor407/08/2026
NY Building AssociatesGeneral Contractor304/09/2026
AB Capstone BuildersScaffold303/21/2026
A1 SpecializedSign hanger207/08/2026
American Standard P&H CororpPlumbing207/08/2026
RRP PlumbingPlumbing207/08/2026
S & L PlumbingPlumbing203/22/2026
American Standard PlumbingPlumbing203/22/2026
Thomas F. Cash & SonsPlumbing107/08/2026
HI-Rite ElectricElectrical103/22/2026
Voltron ElectricElectrical103/21/2026
Zaq ConstructionGeneral Contractor104/09/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
American Standard PlumbingFire Protection107/08/2026
Expert Fire SprinklerFire Protection107/08/2026
Eric & NG ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Macia Inspection & Testin402110/06/2026
Zheng & Associates7330606/30/2026
World Design Architecture9323805/07/2026
AA Building & Inspection1519102/18/2026
Z & T Engineering5912112/18/2025
Shiguang Architecture9279309/02/2025
Qwa Studio9293309/02/2025
Building Lifecycle
All (300)Filed (49)Permit Issued (47)Signed Off (21)Violation (48)Inspection (26)Objection (79)Special Inspection (30)
10/06/2026
Filed — Alteration
Interior renovation of existing commercial space (supermarket) at 1st floor. Work includes mechanical, fire suppression, and refrigeration systems. This application supersedes previous DOB Job No. Q01278238-I1. No change in use, egress or occupancy.
Q01465346-I1
09/30/2026
Special inspection requirement — Energy Code Compliance Inspections
CHUNG CHING JEN
09/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHUNG CHING JEN
09/30/2026
Special inspection requirement — Lighting controls
CHUNG CHING JEN
09/30/2026
Special inspection requirement — Interior lighting power
CHUNG CHING JEN
09/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
CHUNG CHING JEN
09/24/2026
Special inspection requirement — Mechanical Systems
CHUNG CHING JEN
09/24/2026
Special inspection requirement — Final
CHUNG CHING JEN
07/01/2026
Signed off — Alteration
INTERIOR RENOVATION AND INSTALL MECHANICAL SYSTEM AS SHOWN ON PLAN ONLY @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273630-I1
07/01/2026
Special inspection requirement — Final
ADEL SAGEER
07/01/2026
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
07/01/2026
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
07/01/2026
Special inspection requirement — Mechanical Systems
Jinfar Liu
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
07/01/2026
Special inspection requirement — Metering
Jinfar Liu
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/30/2026
Filed — Alteration
INTERIOR RENOVATION AND INSTALL MECHANICAL SYSTEM AS SHOWN ON PLAN ONLY @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273630-P2
06/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2026
Special inspection requirement — Final
ADEL SAGEER
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
06/15/2026
Special inspection requirement — Metering
Jinfar Liu
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
06/15/2026
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
06/15/2026
Special inspection requirement — Mechanical Systems
Jinfar Liu
06/15/2026
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/09/2026
Permit issued — General Construction
Q01348400-I1-GC-CX
06/05/2026
Signed off — Alteration
EXISTING SPRINKLER HEADS TO BE DROPPED DOWN 3' @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273657-I1
06/05/2026
Signed off — Alteration
EXISTING SPRINKLER HEADS TO BE DROPPED DOWN 3' @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273657-S1
05/14/2026
Special inspection requirement — Final
William Alicea
05/14/2026
Special inspection requirement — Mechanical Systems
William Alicea
05/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/11/2026
Violation issued (HPD, closed)
A
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/07/2026
Filed — Alteration
FILING FOR MECHANICAL WORK AS PER PLANS
Q01300869-P3
05/07/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
Q01278238-P3
05/07/2026
Special inspection requirement — Final
William Alicea
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/07/2026
Special inspection requirement — Mechanical Systems
William Alicea
04/14/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/06/2026
Signed off — Alteration
INSTALL SPLIT HEAT PUMP SYSTEM (1 OUTDOOR, 8 INDOOR) WITH DUCTWORK, PIPING, DIFFUSERS & CONTROLS; PROVIDE OUTSIDE AIR INTAKE FAN WITH DUCTWORK/CONTROL; CONNECT TOILET/LOCKER EXHAUST TO BASE BUILDING DUCTWORK.
Q01274132-I1
03/30/2026
Signed off — Alteration
INSTALL SPLIT HEAT PUMP SYSTEM (1 OUTDOOR, 8 INDOOR) WITH DUCTWORK, PIPING, DIFFUSERS & CONTROLS; PROVIDE OUTSIDE AIR INTAKE FAN WITH DUCTWORK/CONTROL; CONNECT TOILET/LOCKER EXHAUST TO BASE BUILDING DUCTWORK.
Q01274132-S4
03/27/2026
Filed — Alteration
FILING FOR PLUMBING WORK AS PER PLANS
Q01278238-P1
03/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Signed off — Alteration
INSTALL SPLIT HEAT PUMP SYSTEM (1 OUTDOOR, 8 INDOOR) WITH DUCTWORK, PIPING, DIFFUSERS & CONTROLS; PROVIDE OUTSIDE AIR INTAKE FAN WITH DUCTWORK/CONTROL; CONNECT TOILET/LOCKER EXHAUST TO BASE BUILDING DUCTWORK.
Q01274132-S3
02/18/2026
Filed — Alteration
Q01348400-I1
02/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/21/2026
Permit issued — Sprinklers
Q01273657-S1-EW-SP
01/15/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/08/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/31/2025
Permit issued — Sign
Q01320861-I1-SG
12/24/2025
Filed — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON WALL FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q01320861-I1
12/18/2025
Filed — Alteration
EXISTING SPRINKLER HEADS TO BE DROPPED DOWN 3' @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273657-P1
12/18/2025
Filed — Alteration
INTERIOR RENOVATION AND INSTALL MECHANICAL SYSTEM AS SHOWN ON PLAN ONLY @ PARTIAL 1ST FLOOR OF NAIL SALON #91-26. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
Q01273630-P1
12/18/2025
Filed — New Building
Proposed 9 story Affordable housing project. Developmental HUB consultation was held & accepted on November 4th, 2021, please assign to Affordable Housing Unit at Developmental HUB.
Q00627197-B5
12/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFRSS Group06/09/2026
DOB NOWSprinklersSigned-offExpert Fire Sprinkler01/21/2026
DOB NOWSignPermit IssuedMad Signs12/31/2025
DOB NOWSignSigned-offMad Signs11/17/2025
DOB NOWMechanical SystemsPermit IssuedFRSS Group10/31/2025
DOB NOWSprinklersSigned-offAmerican Standard Plumbing10/29/2025
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/29/2025
DOB NOWGeneral ConstructionSigned-offNY Building Associates10/09/2025
DOB NOWMechanical SystemsSigned-offNY Building Associates10/09/2025
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating09/12/2025
DOB NOWGeneral ConstructionPermit IssuedFRSS Group09/10/2025
DOB NOWPlumbingSigned-offThomas F. Cash & Sons08/29/2025
DOB NOWGeneral ConstructionSigned-offZaq Construction08/29/2025
DOB NOWConstruction FenceSigned-offAAA General Construction06/21/2024
DOB NOWSupport of ExcavationSigned-offAAA General Construction06/20/2024
DOB NOWGeneral ConstructionPermit IssuedAAA General Construction05/01/2024
DOB NOWMechanical SystemsSigned-offAAA General Construction02/20/2024
DOB NOWCurb CutSigned-offAAA General Construction02/14/2024
DOB NOWGeneral ConstructionPermit IssuedAAA General Construction02/07/2024
DOB NOWStandpipeSigned-offRalph W. Landolfi JR02/06/2024
DOB NOWPlumbingSigned-offRRP Plumbing02/06/2024
DOB NOWSprinklersSigned-offRalph W. Landolfi JR02/06/2024
DOB NOWStructuralSigned-offAAA General Construction02/05/2024
DOB NOWStandpipeSigned-offRalph W. Landolfi JR09/01/2023
DOB NOWSupported ScaffoldSigned-offMC Superstructure07/12/2023
DOB NOWSupported ScaffoldSigned-offMC Superstructure07/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC Superstructure07/12/2023
DOB NOWConstruction FenceSigned-offAAA General Construction06/22/2023
DOB NOWSupport of ExcavationSigned-offAAA General Construction06/21/2023
DOB NOWEarth WorkSigned-offAAA General Construction06/21/2023
DOB NOWGeneral ConstructionPermit IssuedAAA General Construction01/06/2023
DOB NOWStandpipeSigned-offRalph W. Landolfi JR01/05/2023
DOB NOWPlumbingSigned-offRRP Plumbing01/05/2023
DOB NOWSprinklersSigned-offRalph W. Landolfi JR01/05/2023
DOB NOWStructuralSigned-offAAA General Construction10/18/2022
DOB NOWProtection and Mechanical MethodsSigned-offTri Borough Scaffolding10/05/2022
DOB NOWGeneral ConstructionPermit IssuedAAA General Construction10/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offAAA General Construction09/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offAAA General Construction09/19/2022
DOB NOWStandpipeSigned-offRalph W. Landolfi JR09/15/2022
+ 11 more permits on file
3 projects · most recent 10/06/2026
Ventilation Systems Refrigeration Systems Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/06/2026——Refrigeration Systems, Ventilation Systems
Ventilation
Captiveaire Systems, Inc. ND-2-PSP-14 4,000 CFM · Kitchen Exhaust ×1
Refrigeration
Heatcraft BCH0035MCACZA0000 34,000 BTU · Condensing Unit ×8
BCH0025MCACZA0000 24,500 BTU · Condensing Unit ×4
BCH0030LCBCZA0200 13,800 BTU · Condensing Unit ×4
BCH0015MCACZA0000 14,200 BTU · Condensing Unit ×3
BCH0010MCACZA0000 10,200 BTU · Condensing Unit ×2
BCH0035LCBCZA0200 16,500 BTU · Condensing Unit ×1
06/30/2026Signed-offZaq ConstructionHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin DAIKIN-DFG1203DH00001S Furnace ×1
Ventilation
Greenheck GREENHECK-CUBE-140-4122GQD-DR2 1,666 CFM · Exhaust Fan ×1
12/18/2025Signed-offAAA General ConstructionAir Conditioning Systems, Ventilation Systems
Cooling
Islandaire EZLT09B2C1S45AB 9,300 BTU · Ptac ×108
EZLT12B2C1S45AB 11,800 BTU · Ptac ×1
Mitsubishi Electric MXZ-3C30NAHZ4-U1 30,000 BTU · Vrf Outdoor ×2
MXZ-3C24NAHZ2-U1 22,000 BTU · Vrf Outdoor ×1
MXZ-SM36NAMHZ 36,000 BTU · Vrf Outdoor ×1
Carrier 48FCFM12A2A5A0A0A0 10 tons · Rooftop Unit ×2
48TCED12A2A5A0A0G0 10 tons · Rooftop Unit ×1
Gree GMV-12WP/A-T(U) 1 tons · Vrf Outdoor ×1
Ventilation
Greenheck SP-LP0511 50 CFM · Exhaust Fan ×101
CUE-080-VG 200 CFM · Exhaust Fan ×4
CUE-099-VG 800 CFM · Exhaust Fan ×3
CUE-100-VG 1,000 CFM · Exhaust Fan ×3
CUE-100HP-VG 400 CFM · Exhaust Fan ×3
CUE-120-VG 1,400 CFM · Exhaust Fan ×3
CUE-095-VG 450 CFM · Exhaust Fan ×2
USF-24-B7 7,125 CFM · Exhaust Fan ×2
CUE-070-VG 150 CFM · Exhaust Fan ×1
CUE-090-VG 300 CFM · Exhaust Fan ×1
CUE-140-VG 1,800 CFM · Exhaust Fan ×1
SQ-90-VG 450 CFM · Exhaust Fan ×1
1 project · most recent 12/18/2025
Sprinkler System
FiledStatusContractorScope
12/18/2025Signed-offRRP PlumbingSprinkler System
2 projects · most recent 05/07/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
05/07/2026Permit IssuedAll Pro Plumbing & HeatingGas, Water/Sanitary
12/18/2025Signed-offRRP PlumbingGas, Storm, Water/Sanitary
13 projects · most recent 10/18/2026
General Wiring Lighting
FiledStatusContractorScope
10/18/2026Permit IssuedNas ElectricGeneral Wiring
08/19/2026Permit IssuedSega ElectricGeneral Wiring
12/23/2025CompleteVoltron Electric—
10/23/2025CompleteA.C. Morgan ElectricGeneral Wiring
09/26/2025CompleteVoltron Electric—
09/26/2025CompleteVoltron Electric—
10/18/2024CompleteEric & NG Electrical1 meters, 1 new_meters
09/24/2024CompleteHI-Rite ElectricGeneral Wiring, Lighting
07/17/2024CompleteR.C.M. Electric—
09/13/2023CompletePower Surge Electric—
09/02/2022CompleteNash Electric Services—
08/25/2022CompleteNash Electric Services—
02/22/2022CancelledEric & NG ElectricalGeneral Wiring
1 project · most recent 12/18/2025
FiledStatusContractorScope
12/18/2025Signed-offAAA General Construction2 scope_items
1 project · most recent 12/18/2025
Earthwork
FiledStatusContractorScope
12/18/2025Signed-offAAA General ConstructionEarthwork
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
06/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/15/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/08/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Pass-Final SD - Fire PumpPassView ↗
12/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/27/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/24/2024Pass-Final SD - Fire PumpPassView ↗
10/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/07/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/30/2026Interior lighting powerCHUNG CHING JENenergy_progress
09/30/2026Energy Code Compliance InspectionsCHUNG CHING JENprogress
09/30/2026Lighting controlsCHUNG CHING JENenergy_progress
09/30/2026Tenant Protection Plan ComplianceCHUNG CHING JENspecial
09/30/2026Fire-Resistant Penetrations and JointsCHUNG CHING JENspecial
09/24/2026FinalCHUNG CHING JENprogress
09/24/2026Mechanical SystemsCHUNG CHING JENspecial
07/01/2026Energy Code Compliance InspectionsJinfar Liuprogress
07/01/2026Fire-Resistant Penetrations and JointsJinfar Liuspecial
07/01/2026Mechanical SystemsJinfar Liuspecial
07/01/2026Tenant Protection Plan ComplianceJinfar Liuspecial
07/01/2026Lighting in dwelling unitsJinfar Liuenergy_progress
07/01/2026MeteringJinfar Liuenergy_progress
07/01/2026Electrical motors and elevatorsJinfar Liuenergy_progress
07/01/2026FinalADEL SAGEERprogress
06/15/2026Tenant Protection Plan ComplianceJinfar Liuspecial
06/15/2026Mechanical SystemsJinfar Liuspecial
06/15/2026Fire-Resistant Penetrations and JointsJinfar Liuspecial
06/15/2026Lighting in dwelling unitsJinfar Liuenergy_progress
06/15/2026MeteringJinfar Liuenergy_progress
06/15/2026FinalADEL SAGEERprogress
06/15/2026Energy Code Compliance InspectionsJinfar Liuprogress
06/15/2026Electrical motors and elevatorsJinfar Liuenergy_progress
05/14/2026Mechanical SystemsWilliam Aliceaspecial
05/14/2026FinalWilliam Aliceaprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lush Garden Nail SpaPersonal services—
Project Q01290408 Alteration · LOC Issued · 09/22/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 506 on file (BIS + DOB NOW)
▸Plans & Drawings55
▸DOB NOWPlans/Sketch54
10/07/2026Q01465346-I1Request digital key ↗
08/26/2026Q00786935-I1Request digital key ↗
08/25/2026Q00799270-I1Request digital key ↗
Showing 3 of 54 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00143604-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION8
05/13/2025421842368Open ↗
10/04/2024440731594Open ↗
08/23/2024440799085Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD - Permit Notice4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening2
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
10/27/2023440731594Open ↗
06/18/2022440731594Open ↗
▸BISWORK PERMIT APPLICATION2
09/05/2023440799085Open ↗
06/25/2019421890804Open ↗
▸BISDOT 410 PERMITS FOR ADA RAMPS AT CORNERS1
07/28/2025440731594Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications257
▸DOB NOWProgress Inspector Seal & Signature123
10/15/2026Q00627197-I1Open ↗
10/15/2026Q00627197-I1Open ↗
10/15/2026Q00627197-I1Open ↗
Showing 3 of 123 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature74
10/15/2026Q00627197-I1Open ↗
10/15/2026Q00627197-I1Open ↗
10/15/2026Q00627197-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature56
10/07/2026Q01465346-I1Open ↗
08/25/2026Q00627197-A3Open ↗
08/25/2026Q00627197-B5Open ↗
Showing 3 of 56 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISELECTRIC CUT-OFF1
06/25/2019421890804Open ↗
▸BISSEWER CUT-OFF1
06/25/2019421890804Open ↗
▸BISGAS CUT-OFF1
06/25/2019421890804Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection20
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/25/2019421890804Open ↗
06/25/2019421890804Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT2
08/04/2025440731594Open ↗
07/28/2025440731594Open ↗
▸BISSTREET TREE SIGNOFF1
01/30/2025440731594Open ↗
▸BISSTREET TREE CHECKLIST1
06/18/2022440731594Open ↗
▸BISSTREET TREES SITE PLAN1
03/27/2025440731594Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
09/05/2023440799085Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/25/2019421890804Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/25/2019421890804Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos33
▸DOB NOWOER: Notice to Proceed19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/25/2019421890804Open ↗
▸BISRODENT CONTROL1
06/25/2019421890804Open ↗
▸Energy Compliance9
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/24/2024440799085Open ↗
08/23/2023440799085Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/24/2024440799085Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
09/25/2024440799085Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/23/2023440799085Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/23/2023440799085Open ↗
▸Inspections & Test Reports17
▸DOB NOWSOIL REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/24/2024440799085Open ↗
08/23/2023440799085Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: SIDEWALK CONCRETE STRENGTH REPORT1
07/28/2025440731594Open ↗
▸BISBPP: FIELD INSPECTION1
07/28/2025440731594Open ↗
▸Approvals, Objections & Sign-offs8
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
08/04/2025440731594Open ↗
07/28/2025440731594Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/27/2023440731594Open ↗
06/25/2019421890804Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM2
06/25/2019421890804Open ↗
06/25/2019421890804Open ↗
▸BISLANDMARKS APPROVAL1
06/25/2019421890804Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/25/2024440799085Open ↗
▸Cost, Insurance & Ownership6
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction3
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
01/30/2025440731594Open ↗
▸BISCOST AFFIDAVIT2
09/24/2024440799085Open ↗
08/23/2023440799085Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/25/2019421890804Open ↗
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET2
08/23/2023440799085Open ↗
06/18/2022440731594Open ↗
▸BISADDITIONAL INFORMATION2
09/06/2024440799085Open ↗
08/23/2023440799085Open ↗
▸BISEFILING COVER SHEET2
12/10/2025421842368Open ↗
03/20/2019421890804Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/18/2022440731594Open ↗
▸Other Documents47
▸DOB NOWProperty Ownership Certification11
08/25/2026Q00627197-A4Open ↗
08/25/2026Q00627197-B1Open ↗
08/25/2026Q00627197-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSite Survey: Initial7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION6
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
03/27/2025440731594Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
07/28/2025440731594Open ↗
07/28/2025440731594Open ↗
04/07/2025421842368Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
07/28/2025440731594Open ↗
03/27/2025440731594Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
01/30/2025440731594Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/07/2025421842368Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD - Completion Notice1
08/25/2026Q00627197-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type