← Back
BuildNYC
Parks / recreation facility
63 CENTRAL PARK
MANHATTAN · BIN 1809193
💬 Discuss this project
0Year Built
—Stories
Q1Building Class
PARKZoning
34,025 sfGross Floor Area
0Units
6 Active Violations 0 unresolved · 6 paperwork only ▸
Parks / recreation facility · Owner of record: NYC Department of Parks and Recreation · 36,590,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2The Public Theater195p · 4 filings · 18 docs
Floor 1The Public Theater309p · 16 filings · 17 docs
MezzanineThe Public Theater211p · 5 filings · 18 docs
Site & exteriorThe Public Theater317p · 18 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Parks and Recreation10507/08/2026
NYC Parks808/28/2026
City of New York Parks & Recreat203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning6603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yorke ConstructionGeneral Contractor3007/17/2026
Maccarone PlumbingFire Protection607/08/2026
Aspro PlumbingPlumbing307/08/2026
JCC ConstructionPlumbing207/08/2026
Par Plumbing CoPlumbing207/08/2026
Candela Systems Corp DbaElectrical103/22/2026
Queue Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec58422708/17/2026
Langan Engineering, Env, Surveyin1265111/03/2022
Building Lifecycle
All (169)Filed (38)Permit Issued (38)Signed Off (15)Inspection (20)Objection (28)Special Inspection (30)
10/08/2026
Signed off — Alteration
INSTALL A FUEL STOAGE ASSOCIATED WITH THE OUTDOOR GENERATOR.
M01418536-I1
10/06/2026
Signed off — Alteration
Application filed herewith to reconstruction and expansion of the existing pavers surrounding the structure to be renovated, and installation of permeable pavers, and trenching and paving for new utilities. No change to use, egress or occupancy.
M08031630-I1
09/25/2026
Signed off — Alteration
Structural Modifications to the public, Delacorte theatre. No change in use, egress, or occupancy.
M08031171-I1
09/01/2026
Signed off — Alteration
INSTALL A NEW SELF-CONTAINED OUTDOOR EMERGENCY GENERATOR.
M01418498-I1
09/01/2026
Signed off — Alteration
M08031168-I1
08/26/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR THE CONSTRUCTION OF A HYDRODYNAMIC SPEARATOR UNIT WITH ASSOCIATED PIPING TO CONNECT TO THE EXISTING DRAINAGE SYSTEM, AND THE INSTALLATION OF NEW COMBINED WATER SERVICE. NO CHANGE TO USE GROUP, EGRESS OR OCCUPANCY.
M08031619-I1
08/25/2026
Signed off — Alteration
M08031154-I1
08/24/2026
Permit issued — Boiler Equipment
M01418536-I1-BE
08/17/2026
Filed — Alteration
Application filed herewith to reconstruction and expansion of the existing pavers surrounding the structure to be renovated, and installation of permeable pavers, and trenching and paving for new utilities. No change to use, egress or occupancy.
M08031630-P3
08/11/2026
Filed — No Work
M01440552-I1
07/16/2026
Permit issued — Mechanical Systems
M01418498-I1-MS
07/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
CONNIE PISANI
07/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CONNIE PISANI
07/13/2026
Special inspection requirement — Subgrade Inspections
CONNIE PISANI
07/13/2026
Special inspection requirement — Final
CONNIE PISANI
07/06/2026
Filed — Alteration
INSTALL A FUEL STOAGE ASSOCIATED WITH THE OUTDOOR GENERATOR.
M01418536-I1
07/06/2026
Filed — Alteration
INSTALL A NEW SELF-CONTAINED OUTDOOR EMERGENCY GENERATOR.
M01418498-I1
06/17/2026
Special inspection requirement — Mechanical Systems
CONNIE PISANI
06/17/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
CONNIE PISANI
06/17/2026
Special inspection requirement — Final
CONNIE PISANI
06/08/2026
Signed off — Alteration
Demolition and replacement of mechanical systems within bowl area. New mechanical systems to include but no limited to: VRF heating & cooling systems, split systems to provide cooling to utility rooms, DOAS units to provide ventilation and exhaust.
M08031175-I1
05/27/2026
Signed off — Alteration
APPLICATIONS FILED FOR INSTALLATION OF NEW SPRINKLER HEADS CONNECTING TO NEW DRY STANDPIPE. SPRINKLER BOOSTER PUMP WILL BE PROVIDED TO PROVIDE ADEQUATE SUPPLY FOR THE DRY SPRINKLERSYSTEMS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M08031176-I1
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/12/2026
Objection raised — Other
05/12/2026
Objection raised — Other
05/12/2026
Objection raised — Other
05/11/2026
Filed — No Work
M01399641-I1
04/23/2026
Special inspection requirement — Deep Foundation Elements
CONNIE PISANI
04/23/2026
Special inspection requirement — Subgrade Inspections
CONNIE PISANI
04/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
CONNIE PISANI
04/23/2026
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
04/23/2026
Special inspection requirement — Footing and Foundation
CONNIE PISANI
04/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Marc Gallagher
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
04/23/2026
Special inspection requirement — Final
CONNIE PISANI
03/26/2026
Objection resolved — Addressed
03/06/2026
Objection raised — Admin
02/09/2026
Objection resolved — Addressed
01/21/2026
Special inspection requirement — Lowest Floor Elevation
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Wood Frame
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
01/21/2026
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Steel - High Strength Bolting
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
01/21/2026
Special inspection requirement — Masonry
CONNIE PISANI
01/21/2026
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
01/21/2026
Special inspection requirement — Structural Cold-Formed Steel
CONNIE PISANI
01/21/2026
Special inspection requirement — Final
CONNIE PISANI
01/20/2026
Objection raised — Scope
12/30/2025
Filed — Alteration
Structural Modifications to the public, Delacorte theatre. No change in use, egress, or occupancy.
M08031171-P1
12/30/2025
Filed — Alteration
Foundation renovation of existing theater. No change to use, egress or occupancy.
M00831339-P2
12/23/2025
Signed off — Alteration
M01164742-I1
12/08/2025
Permit issued — Structural
M01164742-I1-ST
12/02/2025
Special inspection requirement — Deep Foundation Elements
CONNIE PISANI
12/02/2025
Special inspection requirement — Structural Wood Frame
CONNIE PISANI
12/02/2025
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
12/02/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Marc Gallagher
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating08/24/2026
DOB NOWMechanical SystemsSigned-offYorke Construction07/16/2026
DOB NOWStructuralSigned-offYorke Construction12/08/2025
DOB NOWEarth WorkSigned-offYorke Construction11/13/2025
DOB NOWEarth WorkSigned-offYorke Construction11/13/2025
DOB NOWFoundationSigned-offYorke Construction11/12/2025
DOB NOWStructuralSigned-offYorke Construction10/17/2025
DOB NOWPlumbingSigned-offAspro Plumbing09/29/2025
DOB NOWMechanical SystemsSigned-offYorke Construction09/08/2025
DOB NOWGeneral ConstructionSigned-offYorke Construction09/05/2025
DOB NOWPlumbingSigned-offJCC Construction05/30/2025
DOB NOWStandpipeSigned-offMaccarone Plumbing05/14/2025
DOB NOWSprinklersSigned-offMaccarone Plumbing05/14/2025
DOB NOWEarth WorkSigned-offYorke Construction11/15/2024
DOB NOWFoundationSigned-offYorke Construction11/15/2024
DOB NOWEarth WorkSigned-offYorke Construction11/15/2024
DOB NOWStructuralSigned-offYorke Construction10/23/2024
DOB NOWPlumbingSigned-offAspro Plumbing10/03/2024
DOB NOWMechanical SystemsSigned-offYorke Construction09/12/2024
DOB NOWGeneral ConstructionSigned-offYorke Construction09/11/2024
DOB NOWPlumbingSigned-offJCC Construction07/30/2024
DOB NOWStandpipeSigned-offMaccarone Plumbing06/13/2024
DOB NOWSprinklersSigned-offMaccarone Plumbing06/13/2024
DOB NOWPlumbingSigned-offPar Plumbing Co05/21/2024
DOB NOWEarth WorkSigned-offYorke Construction11/14/2023
DOB NOWEarth WorkSigned-offYorke Construction11/14/2023
DOB NOWStructuralSigned-offYorke Construction10/23/2023
DOB NOWFoundationSigned-offYorke Construction10/23/2023
DOB NOWStandpipeSigned-offMaccarone Plumbing10/02/2023
DOB NOWSprinklersSigned-offMaccarone Plumbing09/19/2023
DOB NOWPlumbingSigned-offAspro Plumbing09/11/2023
DOB NOWMechanical SystemsSigned-offYorke Construction09/08/2023
DOB NOWGeneral ConstructionSigned-offYorke Construction09/08/2023
DOB NOWFoundationSigned-offYorke Construction07/21/2023
DOB NOWPlumbingSigned-offPar Plumbing Co10/06/2022
DOB NOWMechanical SystemsSigned-offYorke Construction10/05/2022
DOB NOWStructuralSigned-offYorke Construction10/05/2022
DOB NOWGeneral ConstructionSigned-offYorke Construction10/05/2022
BISPLISSUEDTaggart Associates10/08/1998
BISMHISSUEDPrinceton Restoration09/17/1998
+ 6 more permits on file
2 projects · most recent 07/06/2026
Generators Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/06/2026Signed-offYorke ConstructionGenerators
Generators
Cummins Model C100D6C 100 kW · Generator ×1
11/02/2022Signed-offYorke ConstructionAir Conditioning Systems, Ventilation Systems
Cooling
Lg ARUB060GSS4 51,900 BTU · Vrf Outdoor ×2
ARUM144BTE5 123,500 BTU · Vrf Outdoor ×1
ARUM192BTE5 164,100 BTU · Vrf Outdoor ×1
Liebert MCS028E1 65,100 BTU · Crac Unit ×1
PX018UA12 65,100 BTU · Split System ×1
Trane 4TTL6036A1 35,000 BTU · Heat Pump Outdoor ×1
4TTL6060A1 56,000 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck USF-08-B2 400 CFM · Exhaust Fan ×2
USF-33-B4 10,000 CFM · Exhaust Fan ×2
USF-04-B3 200 CFM · Exhaust Fan ×1
USF-12-B1 400 CFM · Exhaust Fan ×1
USF-15-F1 2,000 CFM · Exhaust Fan ×1
1 project · most recent 11/02/2022
FiledStatusContractorScope
11/02/2022Signed-offMaccarone Plumbing276 heads, 1 outlets
1 project · most recent 05/30/2024
Storm Water/Sanitary
FiledStatusContractorScope
05/30/2024Signed-offJCC ConstructionStorm, Water/Sanitary
6 projects · most recent 08/04/2026
General Wiring Lighting
FiledStatusContractorScope
08/04/2026CompleteCandela Systems Corp DbaGeneral Wiring, Lighting
05/15/2025CompleteTeam ElectricGeneral Wiring
06/27/2024CompleteTeam Electric—
10/19/2023CompleteCandela Systems Corp Dba—
04/10/2023Permit IssuedQueue Electrical ContractorsGeneral Wiring
10/18/2022CompleteQueue Electrical Contractors—
2 projects · most recent 12/30/2025
Steel Concrete
FiledStatusContractorScope
12/30/2025Signed-offYorke ConstructionSteel, Concrete
12/30/2025Signed-offYorke Construction2 scope_items
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/04/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/11/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/17/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/31/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/13/2026FinalCONNIE PISANIprogress
07/13/2026Subgrade InspectionsCONNIE PISANIspecial
07/13/2026Excavations - Sheeting, Shoring, and BracingCONNIE PISANIspecial
07/13/2026Subsurface Conditions – Fill Placement & In-Place DensityCONNIE PISANIspecial
06/17/2026FinalCONNIE PISANIprogress
06/17/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsCONNIE PISANIspecial
06/17/2026Mechanical SystemsCONNIE PISANIspecial
04/23/2026FinalCONNIE PISANIprogress
04/23/2026Footing and FoundationCONNIE PISANIprogress
04/23/2026Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
04/23/2026Subsurface Conditions – Fill Placement & In-Place DensityCONNIE PISANIspecial
04/23/2026Concrete - Cast-In-PlaceCONNIE PISANIspecial
04/23/2026Subsurface Investigations (Borings/Test Pits)Marc Gallagherspecial
04/23/2026Deep Foundation ElementsCONNIE PISANIspecial
04/23/2026Subgrade InspectionsCONNIE PISANIspecial
01/21/2026FinalCONNIE PISANIprogress
01/21/2026MasonryCONNIE PISANIspecial
01/21/2026Structural Steel - DetailsCONNIE PISANIspecial
01/21/2026Structural Steel - WeldingCONNIE PISANIspecial
01/21/2026Structural Steel - High Strength BoltingCONNIE PISANIspecial
01/21/2026Post-installed AnchorsCONNIE PISANIspecial
01/21/2026Structural Cold-Formed SteelCONNIE PISANIspecial
01/21/2026Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
01/21/2026Structural Wood FrameCONNIE PISANIprogress
01/21/2026Concrete - Cast-In-PlaceCONNIE PISANIspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Public TheaterArts / Culture / EntertainmentFloors 1, 2, Mezzanine
Project M01418498 Alteration · LOC Issued · 07/06/2026
Project M01418536 Alteration · LOC Issued · 07/06/2026
Project M00831339 Alteration · Permit Entire · 09/27/2023
Project M08031168 Alteration · LOC Issued · 11/03/2022
Project M08031151 Alteration · Permit Entire · 11/02/2022
Project M08031171 Alteration · LOC Issued · 11/02/2022
Project M08031176 Alteration · LOC Issued · 11/02/2022
Project M00744575 Alteration · LOC Issued · 06/27/2022
Project M00744629 Alteration · LOC Issued · 06/23/2022
Project M00744702 Alteration · LOC Issued · 06/23/2022
Project M00744710 Alteration · LOC Issued · 06/23/2022
Project M01164742 Alteration · LOC Issued · 02/10/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch33
09/02/2026M00744702-I1Request digital key ↗
09/02/2026M00744702-P1Request digital key ↗
09/02/2026M00744710-P3Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/22/2026M01236845-P1Request digital key ↗
08/22/2026M01236845-I1Request digital key ↗
08/14/2026M01399641-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/24/2026M01164599-I1Request digital key ↗
▸Applications & Permits33
▸DOB NOWLPC Approval/Permit33
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
08/19/2026M08031630-P3Open ↗
Showing 3 of 33 on file for this type
▸Seals & Professional Certifications106
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
09/01/2026M08031176-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/25/2026M00744629-P6Open ↗
09/23/2026M08031630-P3Open ↗
09/10/2026M01164742-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/25/2026M00744629-P6Open ↗
09/23/2026M08031630-P3Open ↗
09/10/2026M01164742-I1Open ↗
Showing 3 of 33 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
09/01/2026M08031154-I1Open ↗
Showing 3 of 30 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026M00831339-P2Open ↗
08/13/2026M00831339-P1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs71
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
09/01/2026M08031154-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
09/02/2026M00744702-I1Open ↗
09/02/2026M00744710-I1Open ↗
08/19/2026M08031630-P3Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
09/01/2026M08031154-I1Open ↗
09/01/2026M08031168-I1Open ↗
09/01/2026M08031619-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents8
▸DOB NOWProof of Historic Building8
08/13/2026M08031151-P1Open ↗
08/13/2026M08031151-P2Open ↗
08/13/2026M08031151-P3Open ↗
Showing 3 of 8 on file for this type