One story retail building
63 HINSDALE STREET
BROOKLYN · BIN 3427476
💬 Discuss this project
2005Year Built
1Stories
K1Building Class
M1-4Zoning
5,873 sfGross Floor Area
1Units
One story retail building · Owner of record: Blue Aster Landco · 17,725 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire ProtectionCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Proposed curb cut and new concrete sidewalk1 filing · 2 docs
Site & exterior4.916 MW energy storage system9p · 1 filing · 3 docs
Filed — no permit issuedNinedot Energy34p · 2 filings · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2024$6.0M—BERGEN REALTY, INC. → BLUE ASTER LANDCO LLC$1,022/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering Consultants, G407/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Titanium Construction ServicesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803301/06/2026
Building Lifecycle
All (33)Filed (4)Objection (8)Special Inspection (21)
09/17/2026
Objection resolved — Resolved
09/17/2026
Objection resolved — Resolved
09/14/2026
Objection resolved — Resolved
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/21/2026
Filed — Alteration
Proposed curb cut on 63 Hinsdale St as per plans filed herewith. No change to use, egress, or occupancy. Proposed curb cut length is 13ft. Related Altco #B01266031
B01266043-I1
01/06/2026
Filed — Alteration
General construction and structural modifications as per plans filed herewith. No change to use, occupancy, or egress. Scope limited to below ground only
B01341966-I1
01/06/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
01/05/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
09/29/2025
Objection raised — Scope
09/29/2025
Objection raised — Zoning
09/17/2025
Objection raised — Other
09/16/2025
Filed — Alteration CO
General construction and structural modifications as per plans filed herewith. No change to use, occupancy, or egress.
B01266031-I1
09/16/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Seismic Isolation Systems
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/16/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
09/05/2025
Filed — Alteration
Solar installation as per plans filed herewith. No change in use, egress, or occupancy.
B01266039-I1
08/04/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
Nothing on file for this building.
2 projects · most recent 01/06/2026
Concrete Masonry Steel
FiledStatusContractorScope
01/06/2026Permit IssuedTitanium Construction ServicesConcrete, Masonry
09/16/2025——Steel, Concrete
1 project · most recent 09/05/2025
FiledStatusContractorScope
09/05/2025——16 panels, 4,916 kw
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/06/2026Post-installed AnchorsSAMI HAJJAR P.Especial
01/05/2026Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
01/05/2026FinalSAMI HAJJAR P.Eprogress
01/05/2026Subsurface Conditions – Fill Placement & In-Place DensitySAMI HAJJAR P.Especial
01/05/2026Subgrade InspectionsSAMI HAJJAR P.Especial
01/05/2026MasonrySAMI HAJJAR P.Especial
09/16/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
09/16/2025Post-installed AnchorsSAMI HAJJAR P.Especial
09/16/2025Seismic Isolation SystemsSAMI HAJJAR P.Especial
09/16/2025Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
09/16/2025Subgrade InspectionsSAMI HAJJAR P.Especial
09/16/2025Subsurface Conditions – Fill Placement & In-Place DensitySAMI HAJJAR P.Especial
09/16/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
09/16/2025Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/16/2025MasonrySAMI HAJJAR P.Especial
08/04/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
08/04/2025FinalSAMI HAJJAR P.Eprogress
08/04/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/04/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/04/2025FinalSAMI HAJJAR P.Eprogress
08/04/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ninedot EnergyIndustrial / Warehouse—
Project B01266031 Alteration CO · Objections · 09/16/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01266035-I1Request digital key ↗
08/14/2026B01266039-I1Request digital key ↗
08/14/2026B01266031-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01266031-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01266031-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B01341966-I1Open ↗
08/27/2026B01266035-I1Open ↗
08/25/2026B01266039-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026B01266031-I1Open ↗
08/16/2026B01266043-I1Open ↗
08/13/2026B01266039-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01341966-I1Open ↗
08/27/2026B01266035-I1Open ↗
08/25/2026B01266039-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026B01266031-I1Open ↗