← Back
Two family brick
63 NICHOLS AVENUE
BROOKLYN · Cypress Hills · BIN 3091258
💬 Discuss this project
1899Year Built
2Stories
B1Building Class
R5Zoning
2,080 sfGross Floor Area
2Units
Rent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT411/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BVC CONSULTING INCGeneral Contractor303/21/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642411/16/2024
Building Lifecycle
All (50)Filed (4)Permit Issued (2)Signed Off (1)Violation (8)Inspection (5)Objection (6)Special Inspection (24)
06/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/14/2025
Violation issued (HPD, open)
B
06/14/2025
Violation issued (HPD, open)
B
05/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/23/2025
Signed off — Alteration
Legalize three fixture bathroom at cellar level and remove illegal gas stove at cellar to remove violations as per drawings.
B01037065-S2
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
12/13/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
12/10/2024
Objection resolved — Addressed
11/26/2024
Objection raised — Other
11/25/2024
Objection resolved — Addressed
11/20/2024
Violation issued (ECB, closed)
Construction
11/20/2024
Violation issued (ECB, open)
Construction
11/19/2024
Objection raised — Other
11/16/2024
Filed — Alteration
Legalize three fixture bathroom at cellar level and remove illegal gas stove at cellar to remove violations as per drawings.
B01037065-P2
11/16/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
11/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
11/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/25/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2024
Objection resolved — Addressed
10/15/2024
Objection raised — Other
10/14/2024
Violation issued (HPD, open)
C
10/14/2024
Violation issued (HPD, open)
C
10/11/2024
Filed — Alteration
Legalize three fixture bathroom at cellar level and remove illegal gas stove at cellar to remove violations as per drawings.
B01037065-P1
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
09/11/2024
Permit issued — Plumbing
B01037065-S2-PL
08/19/2024
Permit issued — Mechanical Systems
B01037065-I1-GC
07/08/2024
Filed — Alteration
Legalize three fixture bathroom at cellar level and remove illegal gas stove at cellar to remove violations as per drawings.
B01037065-S2
04/24/2024
Filed — Alteration
Legalize three fixture bathroom at cellar level and remove illegal gas stove at cellar to remove violations as per drawings.
B01037065-I1
04/17/2024
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Air barrier — testing
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Protection of exposed foundation insulation
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Shutoff dampers
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Duct leakage testing, insulation and design
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Final
TARIQ SIDDIQUI
04/17/2024
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
04/17/2024
Special inspection requirement — Fireplaces
MUZAFFAR JAMAL
03/04/2006
Violation issued (HPD, closed)
B
03/04/2006
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offN AND S PLUMBING INC09/11/2024
DOB NOWMechanical SystemsSigned-offBVC CONTRACTING LLC08/19/2024
1 project · most recent 11/16/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/16/2024Signed-offKISHAN PLUMBING INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
12/13/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
12/13/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
11/16/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
11/16/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
10/10/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/10/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
04/17/2024Maintenance informationMUZAFFAR JAMALenergy_progress
04/17/2024Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
04/17/2024HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
04/17/2024Air barrier — testing MUZAFFAR JAMALenergy_progress
04/17/2024Protection of exposed foundation insulationMUZAFFAR JAMALenergy_progress
04/17/2024Permanent certificateMUZAFFAR JAMALenergy_progress
04/17/2024HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
04/17/2024Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
04/17/2024HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
04/17/2024Fenestration air leakageMUZAFFAR JAMALenergy_progress
04/17/2024Shutoff dampersMUZAFFAR JAMALenergy_progress
04/17/2024Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
04/17/2024Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
04/17/2024Mechanical SystemsMUZAFFAR JAMALspecial
04/17/2024FinalTARIQ SIDDIQUIprogress
04/17/2024Interior lighting powerMUZAFFAR JAMALenergy_progress
04/17/2024Fenestration areasMUZAFFAR JAMALenergy_progress
04/17/2024FireplacesMUZAFFAR JAMALenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01037065-S2Request digital key ↗
08/24/2026B01037065-I1Request digital key ↗
08/15/2026B01037065-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B01037065-I1Open ↗
08/13/2026B01037065-S2Open ↗
08/13/2026B01037065-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature20
09/30/2026B01037065-I1Open ↗
09/30/2026B01037065-I1Open ↗
09/30/2026B01037065-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01037065-S2Open ↗
08/24/2026B01037065-P2Open ↗
08/24/2026B01037065-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/30/2026B01037065-I1Open ↗
09/27/2026B01037065-S2Open ↗
08/27/2026B01037065-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01037065-S2Open ↗
08/24/2026B01037065-I1Open ↗
08/15/2026B01037065-P2Open ↗
Showing 3 of 4 on file for this type