← Back
BuildNYC
Two family brick
63 NICHOLS AVENUE
BROOKLYN · Cypress Hills · BIN 3091258
💬 Discuss this project
1899Year Built
2Stories
B1Building Class
R5Zoning
2,080 sfGross Floor Area
2Units
Rent Stabilized5 Active Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · 2,000 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Architectural Concept411/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Architectual Concept803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BVC Consultingspecialty_contractor303/21/2026
Kishan PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Architectural Concept3642411/16/2024
Building Lifecycle
06/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/14/2025
§ 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM…
HPD violation · open
06/14/2025
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st…
HPD violation · open
05/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/23/2025
Signed off — Alteration
Legalize three fixture bathroom at cellar level and remove illegal gas stove at cellar to remove violations as per drawings.
B01037065-S2
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offN and S Plumbing09/11/2024
DOB NOWMechanical SystemsSigned-offBVC Contracting08/19/2024
1 project · most recent 11/16/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/16/2024Signed-offKishan PlumbingGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
12/13/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
12/13/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
11/16/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
11/16/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
10/10/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
10/10/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
04/17/2024Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
04/17/2024HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
04/17/2024Air barrier — testing MUZAFFAR JAMALenergy_progress
04/17/2024Protection of exposed foundation insulationMUZAFFAR JAMALenergy_progress
04/17/2024Permanent certificateMUZAFFAR JAMALenergy_progress
04/17/2024HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
04/17/2024Mechanical SystemsMUZAFFAR JAMALspecial
04/17/2024HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
04/17/2024Fenestration air leakageMUZAFFAR JAMALenergy_progress
04/17/2024Shutoff dampersMUZAFFAR JAMALenergy_progress
04/17/2024Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
04/17/2024Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
04/17/2024Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
04/17/2024FinalTARIQ SIDDIQUIprogress
04/17/2024Interior lighting powerMUZAFFAR JAMALenergy_progress
04/17/2024Fenestration areasMUZAFFAR JAMALenergy_progress
04/17/2024FireplacesMUZAFFAR JAMALenergy_progress
04/17/2024Maintenance informationMUZAFFAR JAMALenergy_progress
40 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account