← Back
Two family converted from one family
63 RALPH AVENUE
BROOKLYN · BIN 3039645
💬 Discuss this project
1910Year Built
2Stories
B3Building Class
R6AZoning
2,400 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: MM REALTY & DEVELOPMENT CORP. · 1,600 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MM REALTY DEVELOPMENT1004/09/2026
KALE CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2025$1000K—Private party → MM REALTY & DEVELOPMENT CORP.$417/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC310/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402210/30/2025
Building Lifecycle
All (25)Filed (3)Permit Issued (2)Signed Off (2)Violation (2)Inspection (7)Special Inspection (9)
02/04/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING THREE STORIES HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01212511-I1
02/04/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING THREE STORIES HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01212511-S1
11/20/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/05/2025
Special inspection requirement — Heating Systems
BRIAN ILL
11/05/2025
Special inspection requirement — Mechanical Systems
BRIAN ILL
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
11/05/2025
Special inspection requirement — Final
BRIAN ILL
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
11/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
11/05/2025
Special inspection requirement — Maintenance information
BRIAN ILL
11/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
11/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
11/03/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/30/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING THREE STORIES HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01212511-P1
06/12/2025
Violation issued (ECB, closed)
Construction
06/12/2025
Violation issued (ECB, closed)
Construction
05/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/21/2025
Permit issued — General Construction
B01212511-I1-GC-CX
04/21/2025
Permit issued — Plumbing
B01212511-S1-PL
04/18/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING THREE STORIES HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01212511-S1
04/17/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING THREE STORIES HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01212511-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC04/21/2025
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C04/21/2025
2 projects · most recent 11/26/2025
General Wiring
FiledStatusContractorScope
11/26/2025CompleteCITY GRID ELECTRIC CORPGeneral Wiring
08/01/2025CompleteCITY GRID ELECTRIC CORP3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/20/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/03/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/05/2025Heating SystemsBRIAN ILLspecial
11/05/2025Mechanical SystemsBRIAN ILLspecial
11/05/2025Fire-Resistant Penetrations and JointsBRIAN ILLspecial
11/05/2025FinalBRIAN ILLprogress
11/05/2025Energy Code Compliance InspectionsBRIAN ILLprogress
11/05/2025HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
11/05/2025Maintenance informationBRIAN ILLenergy_progress
11/05/2025HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
11/05/2025HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01212511-P1Request digital key ↗
08/21/2026B01212511-S1Request digital key ↗
08/21/2026B01212511-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026B01212511-I1Open ↗
08/24/2026B01212511-I1Open ↗
08/24/2026B01212511-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01212511-P1Open ↗
08/21/2026B01212511-S1Open ↗
08/21/2026B01212511-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B01212511-I1Open ↗
08/24/2026B01212511-I1Open ↗
08/24/2026B01212511-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01212511-I1Open ↗
08/21/2026B01212511-P1Open ↗