BROOKLYN
63 STANHOPE STREET
BROOKLYN · BIN 3429222
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof23p · 2 filings · 20 docs
Floor 421p · 1 filing · 20 docs
Floor 322p · 1 filing · 20 docs
Floor 221p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar23p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AB+R CONSTRUCTION4007/08/2026
CLASSIC CONSULTING GROUP707/08/2026
65 STANHOPE STREET LLC203/22/2026
AB PLUS R CONSTRUCTION IN203/22/2026
THE OWNER OF 63 STANHOPE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO607/26/2024
ARQUITECTURA VARELA410/20/2022
ELEVATED ENGINEERING NYC407/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STONECORE LLC503/21/2026
ARC ARCHITECTURE + DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB PLUS R CONSTRUCTION INGeneral Contractor1207/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor307/08/2026
HIGHLAND PLUMBING LLCPlumbing207/08/2026
PLBG P & H INCPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252103/28/2022
AA BUILDING & INSPECTION1519303/11/2022
Building Lifecycle
All (96)Filed (14)Permit Issued (13)Signed Off (7)Violation (5)Inspection (11)Objection (16)Special Inspection (30)
06/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/16/2025
Violation issued (HPD, closed)
A
11/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/26/2024
Filed — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-P5
07/24/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/24/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
07/24/2024
Special inspection requirement — Metering
Younes Abouyaala
07/24/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/24/2024
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
07/24/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
07/24/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/24/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
07/24/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/24/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/24/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/18/2024
Signed off — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-S5
05/29/2024
Permit issued — Plumbing
B00630951-S5-PL
05/16/2024
Permit issued — General Construction
B00630951-I1-GC
03/13/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND ROOF PROTECTION FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014
B07993885-I1
03/13/2024
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B08014853-I1
03/05/2024
Filed — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-P4
02/29/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
02/29/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
02/29/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
02/29/2024
Special inspection requirement — Metering
Younes Abouyaala
02/29/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
02/29/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
02/29/2024
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
02/29/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
02/29/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
02/29/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
02/29/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
02/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/21/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
02/06/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/26/2024
Signed off — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-S4
01/05/2024
Filed — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-P3
01/05/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
01/05/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
01/05/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
01/05/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
01/05/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
01/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
01/05/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
01/05/2024
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
11/13/2023
Signed off — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-S1
11/13/2023
Signed off — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-S2
10/26/2023
Permit issued — General Construction
B00630951-I1-GC
10/25/2023
Signed off — New Building
INSTALLATION OF COMPLETE HVAC SYSTEMS PER PLAN.
B00630951-S3
07/14/2023
Permit issued — Structural
B00630951-S3-ST
06/29/2023
Permit issued — Plumbing
B00630951-S5-EW-SP
05/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2023
Permit issued — Sprinklers
B00630951-S5-PL
11/15/2022
Inspection — Pass-Final House Connection
Pass
View inspection ↗
10/20/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND ROOF PROTECTION FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014
B07993885-P1
10/20/2022
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B08014853-P1
10/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC05/29/2024
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN05/16/2024
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN10/26/2023
DOB NOWStructuralSigned-offAB PLUS R CONSTRUCTION IN07/14/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC06/29/2023
DOB NOWSprinklersSigned-offHIGHLAND PLUMBING LLC03/28/2023
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP10/04/2022
DOB NOWPlumbingSigned-offPLBG P & H INC09/15/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/03/2022
DOB NOWMechanical SystemsSigned-offAB PLUS R CONSTRUCTION IN06/27/2022
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN05/23/2022
DOB NOWSupport of ExcavationSigned-offAB PLUS R CONSTRUCTION IN05/20/2022
DOB NOWFoundationSigned-offAB PLUS R CONSTRUCTION IN05/20/2022
1 project · most recent 07/26/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/26/2024Permit IssuedAB PLUS R CONSTRUCTION INAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PUMY-HP36NKMU1 3,885 CFM · Vrf Outdoor ×6
PUMY-P60NKMU3 4,879 CFM · Vrf Outdoor ×1
SUZ-KA18NAHZ 2,020 CFM · Condensing Unit ×1
Lg ARUN024GSS4 2,119 CFM · Vrf Outdoor ×1
Heating
Mitsubishi Electric SUZ-KA18NAHZ 208 kW · Condensing Unit ×2
PUMY-HP36NKMU1 3,885 CFM · Vrf Outdoor ×1
PUMY-P60NKMU3 4,879 CFM · Vrf Outdoor ×1
Lg ARUN024GSS4 24,000 BTU · Vrf Outdoor ×1
2 projects · most recent 03/25/2024
General Wiring
FiledStatusContractorScope
03/25/2024CompleteRONEY ELECTRIC INCGeneral Wiring
08/25/2022CompleteRICHARD NEU—
1 project · most recent 07/26/2024
Concrete
FiledStatusContractorScope
07/26/2024Signed-offHIGHLAND PLUMBING LLCConcrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2022Pass-Final House ConnectionPassView ↗
10/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
07/24/2024Fenestration areasYounes Abouyaalaenergy_progress
07/24/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
07/24/2024MeteringYounes Abouyaalaenergy_progress
07/24/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/24/2024Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
07/24/2024Exterior lighting powerYounes Abouyaalaenergy_progress
07/24/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/24/2024Lighting controlsYounes Abouyaalaenergy_progress
07/24/2024Interior lighting powerYounes Abouyaalaenergy_progress
07/24/2024Fenestration air leakageYounes Abouyaalaenergy_progress
07/24/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
02/29/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
02/29/2024Interior lighting powerYounes Abouyaalaenergy_progress
02/29/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
02/29/2024MeteringYounes Abouyaalaenergy_progress
02/29/2024Fenestration areasYounes Abouyaalaenergy_progress
02/29/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
02/29/2024Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
02/29/2024Exterior lighting powerYounes Abouyaalaenergy_progress
02/29/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
02/29/2024Fenestration air leakageYounes Abouyaalaenergy_progress
02/29/2024Lighting controlsYounes Abouyaalaenergy_progress
01/05/2024Exterior lighting powerYounes Abouyaalaenergy_progress
01/05/2024Lighting controlsYounes Abouyaalaenergy_progress
01/05/2024Fenestration air leakageYounes Abouyaalaenergy_progress
Latest 25 of 45.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/30/2026B00630951-S2Request digital key ↗
08/30/2026B00630951-S4Request digital key ↗
08/30/2026B00630951-S5Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B00630951-I1Open ↗
08/13/2026B00630951-P3Open ↗
08/13/2026B00630951-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B00630951-P5Open ↗
08/13/2026B00630951-P4Open ↗
08/13/2026B00630951-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00630951-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/30/2026B00630951-S2Open ↗
08/30/2026B00630951-S3Open ↗
08/30/2026B00630951-S4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00630951-S5Open ↗
09/01/2026B00630951-S5Open ↗
08/30/2026B00630951-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00630951-S5Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026B00630951-I1Open ↗
08/13/2026B00630951-P3Open ↗
08/13/2026B00630951-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/30/2026B00630951-P3Open ↗
08/30/2026B00630951-P5Open ↗
08/30/2026B00630951-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00630951-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00630951-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00630951-I1Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00630951-S5Open ↗
08/13/2026B00630951-S4Open ↗
08/13/2026B00630951-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00630951-I1Open ↗
▸Other Documents16
▸DOB NOWProperty Ownership Certification5
08/30/2026B00630951-P1Open ↗
08/30/2026B00630951-P3Open ↗
08/30/2026B00630951-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B00630951-P4Open ↗
08/13/2026B00630951-P5Open ↗
08/13/2026B00630951-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026B00630951-P3Open ↗
08/13/2026B00630951-P4Open ↗
08/13/2026B00630951-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00630951-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00630951-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00630951-S1Open ↗