← Back
BuildNYC
Elevator apt, fireproof without stores
630 EAST NEW YORK AVENUE
BROOKLYN · BIN 3106594
💬 Discuss this project
2019Year Built
7Stories
D3Building Class
R6Zoning
30,073 sfGross Floor Area
12Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 632-634 Realty · 6,000 sf lot · 5.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCzbm LLC13p · 4 filings · 20 docs
Floor 7Czbm LLC8p · 2 filings · 12 docs
Floor 6Czbm LLC8p · 2 filings · 12 docs
Floor 5Czbm LLC11p · 3 filings · 16 docs
Floor 4Czbm LLC11p · 3 filings · 16 docs
Floor 3Czbm LLC11p · 3 filings · 16 docs
Floor 2Czbm LLC11p · 3 filings · 16 docs
Floor 1Czbm LLC27p · 5 filings · 20 docs
CellarCzbm LLC7p · 2 filings · 12 docs
Site & exteriorCzbm LLC7p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
630 Eny Realty1803/21/2026
632-634 Realty1603/22/2026
1025-45 Associates707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/16/2015$500K—Private party → 630 ENY REALTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Walter Hollien Architect211/09/2023
Shahrish Shuvo Engineering406/07/2021
Syed Engineering408/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Builders Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G Construction ServicesScaffold407/08/2026
Blustone ContractingGeneral Contractor407/08/2026
P.H. WorksPlumbing207/08/2026
Dynamic Electrical ContractorsElectrical203/21/2026
MR DemolitionGeneral Contractor203/21/2026
Silver InteriorGeneral Contractor203/21/2026
CDF Custom BuildersGeneral Contractor203/21/2026
S J IndustrialFire Protection103/21/2026
Walter HollienElectrical103/21/2026
NKM EngineeringElectrical103/21/2026
Global Home ImprovementsGeneral Contractor206/13/2019
Xolle DemoGeneral Contractor106/13/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524111/09/2023
Engineering Consulting SE2050406/07/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
07/08/2026
Elevator Category 1 inspection report filed
05/08/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
08/18/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00708740-I1-GC
85 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBlustone Contracting01/02/2024
DOB NOWGeneral ConstructionPermit IssuedBlustone Contracting08/31/2023
DOB NOWBoiler EquipmentSigned-offP.H. Works12/04/2020
DOB NOWPlumbingSigned-offP.H. Works12/04/2020
DOB NOWSidewalk ShedSigned-offJ & G Construction Services04/23/2019
DOB NOWSupported ScaffoldSigned-offJ & G Construction Services04/02/2019
BIS—ISSUEDSilver Interior02/12/2021
BISSPISSUEDS & J Industrial02/01/2021
BISEQISSUEDSilver Interior01/25/2021
BISPLISSUEDP.H. Works12/01/2020
BISSPISSUEDS & J Industrial08/01/2019
BIS—ISSUEDSilver Interior06/26/2019
BISOTISSUEDGlobal Home Improvements06/13/2019
BISEQISSUEDGlobal Home Improvements06/13/2019
BIS—RE-ISSUEDXolle Demo06/13/2019
BISBLISSUEDP.H. Works05/22/2019
BISPLISSUEDP.H. Works05/22/2019
BIS—ISSUEDCDF Custom Builders04/01/2019
BISOTISSUEDCDF Custom Builders03/15/2019
BIS—RE-ISSUEDCDF Custom Builders10/17/2018
BISEQISSUEDCDF Custom Builders10/17/2018
BISMHISSUEDCDF Custom Builders10/17/2018
BIS—ISSUEDMR Demolition07/17/2018
BISEQISSUEDMR Demolition07/17/2018
BISMHISSUEDMR Demolition07/11/2018
BIS—ISSUEDMR Demolition02/07/2018
BIS—ISSUEDMR Demolition01/29/2018
BISEQISSUEDMR Demolition12/26/2017
BISEQISSUEDMR Demolition12/26/2017
BISEQISSUEDMR Demolition12/28/2016
BIS—ISSUEDMR Demolition11/09/2016
BISEQISSUEDMR Demolition12/29/2015
BIS—ISSUEDMR Demolition12/29/2015
6 projects · most recent 06/22/2021
General Wiring
FiledStatusContractorScope
06/22/2021CompleteDynamic Electrical ContractorsGeneral Wiring
11/05/2019CompleteDynamic Electrical ContractorsGeneral Wiring
08/03/2019CompleteContact Plus Electrical—
07/03/2019CompleteEnterprise Electrical Systems—
04/19/2019CompleteRichard Neu—
12/11/2018CompleteFried Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/07/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
11/07/2023FinalShahrish Shuvoprogress
06/10/2021HVAC and service water heating system controls PAUL MARINOenergy_progress
06/10/2021Heating SystemsPAUL MARINOspecial
06/10/2021Maintenance informationPAUL MARINOenergy_progress
06/10/2021HVAC and service water heating equipment PAUL MARINOenergy_progress
06/10/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
05/24/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
05/24/2021Heating SystemsPAUL MARINOspecial
05/24/2021HVAC and service water heating equipment PAUL MARINOenergy_progress
05/24/2021HVAC and service water heating system controls PAUL MARINOenergy_progress
05/24/2021Maintenance informationPAUL MARINOenergy_progress
12/06/2019FinalRAFI HAMIDprogress
369 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account