630 FLUSHING AVENUE
BROOKLYN · BIN 3329628
💬 Discuss this project
1930Year Built
8Stories
F5Building Class
M1-3Zoning
574,055 sfGross Floor Area
0Units
LL97 Covered2 Active Violations 1 unresolved · 1 paperwork only 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Factory, light manufacturing · Owner of record: Waste Management · 145,000 sf lot · 3.96 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCookUnityUnder Construction13p · 13 filings · 20 docs
BulkheadAcp BK1 LLC2p · 1 filing · 6 docs
Floor 8Acumen Capital Partners5p · 3 filings · 15 docs
Floor 7Acp BK1 LLC10p · 3 filings · 20 docs
Floor 6Last Crumbs29p · 4 filings · 20 docs
Floor 5Acp BK1 LLC22p · 4 filings · 20 docs
Floor 4CookUnityUnder Construction83p · 10 filings · 20 docs
Floor 3Acumen Capital PartnersUnder Construction45p · 10 filings · 20 docs
Floor 2FreshDirect47p · 10 filings · 20 docs
Floor 1Acumen Capital Partners, CookUnity28p · 8 filings · 20 docs
Sub-BasementAcumen Capital Partners LLC1 filing · 11 docs
Site & exteriorAcp BK1 LLC43p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Acp BK118207/08/2026
Pfizer18203/21/2026
Acumen Capitial Partners13303/21/2026
Cookunity407/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Paul Fusco Consulting1403/21/2026
Acp BK1203/21/2026
Perotto Consulting Management203/21/2026
Design 21472803/21/2026
Robert R Bisaccia403/21/2026
New York & Company203/21/2026
Bertolini Architectural Works403/21/2026
AE Design Solution803/21/2026
Rigid Structural Design203/21/2026
Britz Enterprises203/21/2026
J.A.M. Associates803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cook & KrupaGeneral Contractor1507/08/2026
CN PlumbingPlumbing1307/08/2026
Everest ScaffoldingScaffold907/08/2026
Cooltech Mechanicalspecialty_contractor603/21/2026
Path Mechanicalspecialty_contractor507/08/2026
Mauceri ElectricElectrical503/21/2026
CN PlumbingFire Protection407/08/2026
Andamio ScaffoldingScaffold404/09/2026
Structurecraft ContractingGeneral Contractor303/21/2026
Rakshan Malek AssociatesGeneral Contractor303/21/2026
Flue TechGeneral Contractor303/21/2026
Johannisburg CNSTNGeneral Contractor307/04/2026
Mauceri NicholasElectrical303/21/2026
Mauceri StevenElectrical203/21/2026
RL Mechanical Servicesspecialty_contractor204/09/2026
Active ElectricElectrical203/21/2026
V & M Drain CleaningPlumbing107/08/2026
BDS ElectricElectrical103/22/2026
Vertex ElectricElectrical103/21/2026
Cogen Electrical ServicesElectrical103/21/2026
Atlas Electric ContractorsElectrical103/21/2026
Affinity Building SolutioGeneral Contractor104/09/2026
Pristine Air Conditioningspecialty_contractor106/27/2026
Rike AssociatesGeneral Contractor107/08/2026
Active ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544710/06/2026
Hardie & Associates, Cons3760108/04/2026
Atlas ATC Engineering8011202/18/2026
Special Testing & Consulting1688311/12/2024
Startech Engineering1041211/04/2024
Raad7727107/24/2024
NY Building Systems Consulting7390211/16/2023
Rike Tech Associates2965105/31/2023
EP Inspections and Commis7079612/09/2022
Steel Core Engineering PL1098307/25/2022
HRF Services5616104/15/2022
MT Group798501/24/2022
Rakshan Malek Associates3352309/29/2020
New York Engineering Associates851112/06/2019
Building Lifecycle
All (275)Filed (67)Permit Issued (52)Signed Off (20)Facade (FISP) (15)Violation (60)Inspection (19)Objection (12)Special Inspection (30)
10/06/2026
Filed — Alteration
INSTALL NEW WALK-IN COOLER AND RELATED MECHANICAL SCOPE.
B01451435-I1
09/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
08/26/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
08/26/2026
Special inspection requirement — Final
EUGENE BIFULCO
08/26/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/04/2026
Filed — Alteration
MECHANICAL WORK FOR COMMERCIAL COKING AND EXHAUST SYSTEMS AT 8TH FLOOR
B01433624-I1
06/26/2026
Permit issued — Plumbing
B01384836-S1-PL
06/24/2026
Permit issued — Mechanical Systems
B01384836-I1-MS
05/27/2026
Filed — Alteration
MECHANICAL APPLICATION FOR 2 HVAC UNITS, POT WASH AND RELATED MECHANICAL SCOPE.
B01384836-I1
05/27/2026
Signed off — Alteration
Plumbing application for new HWH, drains, grease trap and water connection.
B01323003-I1
05/27/2026
Signed off — Alteration
Plumbing application for new HWH, drains, grease trap and water connection.
B01323003-S1
05/27/2026
Filed — Alteration
MECHANICAL APPLICATION FOR 2 HVAC UNITS, POT WASH AND RELATED MECHANICAL SCOPE.
B01384836-S1
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/28/2026
Signed off — Alteration
HVAC WORK TO INSTALL 2 HOODS.
B01275989-I1
04/27/2026
Cycle 9 facade report signed — SWARMP
04/20/2026
Violation issued (ECB, open)
Local Law
04/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Final
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
03/03/2026
Objection raised — Structural
03/03/2026
Objection raised — Cost
02/26/2026
Cycle 9 facade inspection completed
02/18/2026
Filed — Alteration
B00897705-P1
02/10/2026
Violation issued (FDNY_NOV, closed)
02/02/2026
Violation issued (FDNY_ORDER, closed)
02/02/2026
Violation issued (FDNY_ORDER, closed)
01/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2025
Permit issued — Plumbing
B01323003-S1-PL
12/15/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01261947-I1
12/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00820387-I1
12/15/2025
Cycle 9 facade report submitted
12/12/2025
Permit issued — Mechanical Systems
B01323003-I1-MS
12/04/2025
Filed — Alteration
Plumbing application for new HWH, drains, grease trap and water connection.
B01323003-I1
12/04/2025
Filed — Alteration
Plumbing application for new HWH, drains, grease trap and water connection.
B01323003-S1
12/03/2025
Violation issued (FDNY_ORDER, closed)
12/03/2025
Violation issued (FDNY_ORDER, closed)
11/21/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
11/21/2025
Special inspection requirement — Final
EUGENE BIFULCO
11/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
11/21/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
11/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
11/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
11/21/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
11/18/2025
Permit issued — Mechanical Systems
B01293324-I1-MS
10/29/2025
Filed — Alteration
MECHANICAL
B01293324-I1
10/27/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
Latest 60 of 275 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCN Plumbing06/26/2026
DOB NOWMechanical SystemsPermit IssuedPristine Air Conditioning06/24/2026
DOB NOWPlumbingSigned-offCN Plumbing12/22/2025
DOB NOWMechanical SystemsSigned-offRL Mechanical Services12/12/2025
DOB NOWMechanical SystemsPermit IssuedAffinity Building Solutio11/18/2025
DOB NOWMechanical SystemsSigned-offRL Mechanical Services09/03/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding07/31/2025
DOB NOWPlumbingPermit IssuedCN Plumbing04/29/2025
DOB NOWSuspended ScaffoldPermit IssuedJohannisburg Construction04/04/2025
DOB NOWGeneral ConstructionPermit IssuedJohannisburg Construction04/04/2025
DOB NOWPlumbingPermit IssuedCN Plumbing01/28/2025
DOB NOWMechanical SystemsPermit IssuedPath Mechanical01/27/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/23/2025
DOB NOWMechanical SystemsSigned-offPath Mechanical12/09/2024
DOB NOWGeneral ConstructionPermit IssuedJohannisburg Construction10/08/2024
DOB NOWSuspended ScaffoldPermit IssuedJohannisburg Construction07/22/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/25/2024
DOB NOWMechanical SystemsSigned-offPath Mechanical12/20/2023
DOB NOWPlumbingSigned-offCN Plumbing11/06/2023
DOB NOWGeneral ConstructionPermit IssuedJohannisburg Construction11/01/2023
DOB NOWMechanical SystemsSigned-offRike Associates06/01/2023
DOB NOWSprinklersPermit IssuedCN Plumbing04/10/2023
DOB NOWSprinklersPermit IssuedCN Plumbing04/04/2023
DOB NOWGeneral ConstructionPermit IssuedCook & Krupa04/03/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/30/2023
DOB NOWGeneral ConstructionSigned-offCook & Krupa01/04/2023
DOB NOWGeneral ConstructionPermit IssuedCook & Krupa09/28/2022
DOB NOWMechanical SystemsPermit IssuedCooltech Mechanical09/22/2022
DOB NOWPlumbingSigned-offCN Plumbing06/30/2022
DOB NOWGeneral ConstructionSigned-offCook & Krupa06/18/2022
DOB NOWGeneral ConstructionSigned-offStructurecraft Contracting06/03/2022
DOB NOWMechanical SystemsSigned-offPath Mechanical05/26/2022
DOB NOWPlumbingPermit IssuedCN Plumbing05/13/2022
DOB NOWPlumbingSigned-offCN Plumbing04/28/2022
DOB NOWSprinklersPermit IssuedCN Plumbing04/25/2022
DOB NOWGeneral ConstructionPermit IssuedCook & Krupa02/01/2022
DOB NOWMechanical SystemsPermit IssuedCooltech Mechanical01/04/2022
DOB NOWGeneral ConstructionSigned-offCook & Krupa10/19/2021
DOB NOWCurb CutPermit IssuedCook & Krupa04/16/2021
DOB NOWGeneral ConstructionPermit IssuedCook & Krupa03/29/2021
+ 60 more permits on file
9 projects · most recent 10/06/2026
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems Others
FiledStatusContractorScopeMake / Model / Capacity
10/06/2026——Refrigeration Systems
Refrigeration
Russell RAM6D447EDA 47,500 BTU · Fan Coil Indoor ×4
RFDS01M4AEA 92,000 BTU · Condensing Unit ×2
08/04/2026——Ventilation Systems
Ventilation
Floaire BU15 3,300 CFM · Exhaust Fan ×1
05/27/2026Permit IssuedPristine Air ConditioningHeating and Air Conditioning Systems
Heat / Cool
Lg ARUM144DTE5 162,000 BTU · Vrf Outdoor ×2
12/04/2025Signed-offRL Mechanical ServicesHeating and Air Conditioning Systems
Heat / Cool
Lg LG ARUM144DTE5 162,000 BTU · Vrf Outdoor ×2
10/29/2025Permit IssuedAffinity Building SolutioRefrigeration Systems
Refrigeration
Bohn BCV0300MDACD 200,000 BTU · Condensing Unit ×4
BCH0035MDACZA0000 31,200 BTU · Condensing Unit ×3
ASHS9522ZNAFS1 31,200 BTU · Condensing Unit ×2
BCH0027MDACZA0000 23,800 BTU · Condensing Unit ×2
BCH0030MDACZA0000 25,700 BTU · Condensing Unit ×2
BCH0045MDACZA000 32,200 BTU · Condensing Unit ×2
BCH0060MDACZA0000 46,800 BTU · Condensing Unit ×2
BCH0060MDACZA1000 47,500 BTU · Condensing Unit ×2
BCH0070MDACZ 65,400 BTU · Condensing Unit ×2
BCH0086MDACZ 83,600 BTU · Condensing Unit ×1
BCH0150MDACD 129,000 BTU · Condensing Unit ×1
BCV0200MDACD 173,600 BTU · Condensing Unit ×1
Bihn BCH0015MDACZA0000 12,900 BTU · Condensing Unit ×1
Carrier BCH0150MDACD 129,000 BTU · Condensing Unit ×1
08/26/2025Signed-offRL Mechanical ServicesHeating and Air Conditioning Systems, Others
Heat / Cool
Mitsubishi Electric LG-ARUM216BTE5 243,000 BTU · Vrf Outdoor ×1
Other
N/A n/a Kitchen Exhaust ×2
03/25/2025Permit IssuedPath MechanicalHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Carrier 40RUSA14T2A50UA0A0 144,000 BTU · Ahu ×4
Ventilation
Greenheck MINICORE-5-VG-F 600 CFM · Erv ×4
12/13/2023——Ventilation Systems
Ventilation
Greenheck SQ-120-VG5X-QD 1,600 CFM · Exhaust Fan ×1
Multiaqua 60CWA2-00 60,000 BTU · Fan Coil Indoor ×1
02/16/2022Permit IssuedCooltech MechanicalRefrigeration Systems
Refrigeration
Cte CWL-060S 15,270 BTU · Condensing Unit ×24
Trenton TESA075L6-HT3D-F 19,088 BTU · Condensing Unit ×4
4 projects · most recent 05/27/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/27/2026Signed-offCN PlumbingWater/Sanitary
12/04/2025Signed-offCN PlumbingWater/Sanitary
03/25/2025Permit IssuedCN PlumbingGas, Water/Sanitary
04/19/2022Permit IssuedCN PlumbingWater/Sanitary
25 projects · most recent 10/08/2026
General Wiring
FiledStatusContractorScope
10/08/2026CompleteMauceri ElectricGeneral Wiring
07/23/2026Permit IssuedMauceri ElectricGeneral Wiring
07/15/2026Permit IssuedMauceri ElectricGeneral Wiring
04/22/2026Permit IssuedMauceri ElectricGeneral Wiring
02/03/2026Permit IssuedVertex ElectricGeneral Wiring
07/21/2025Permit IssuedTruephase Electrical ContractorsGeneral Wiring
02/02/2023CompleteBorowide Elect'l Contractors—
06/29/2022CompletePoc Electrical ContngGeneral Wiring
06/14/2022CompleteMauceri ElectricGeneral Wiring
04/25/2022Permit IssuedMauceri ElectricGeneral Wiring
01/31/2022Permit IssuedBrandl ElectricGeneral Wiring
11/03/2021Permit IssuedMauceri ElectricGeneral Wiring
05/26/2021CompleteCreggan ElectrialGeneral Wiring
04/23/2021CompleteCreggan ElectrialGeneral Wiring
03/23/2021Permit IssuedMauceri ElectricGeneral Wiring
2 projects · most recent 11/12/2024
Steel Concrete
FiledStatusContractorScope
11/12/2024Permit IssuedCook & KrupaSteel, Concrete
01/24/2022——Steel
1 project · most recent 02/02/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
02/02/2025Permit IssuedJohannisburg ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
09/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 137
DateRequirementInspectorRole
08/26/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
08/26/2026Mechanical SystemsEUGENE BIFULCOspecial
08/26/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/26/2026FinalEUGENE BIFULCOprogress
08/26/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
08/26/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
08/26/2026Maintenance informationEUGENE BIFULCOenergy_progress
05/26/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
04/09/2026FinalEUGENE BIFULCOprogress
04/09/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
04/09/2026Mechanical SystemsEUGENE BIFULCOspecial
04/09/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/09/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/09/2026Maintenance informationEUGENE BIFULCOenergy_progress
04/09/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
11/21/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
11/21/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
11/21/2025Mechanical SystemsEUGENE BIFULCOspecial
11/21/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/21/2025FinalEUGENE BIFULCOprogress
11/21/2025Energy Code Compliance InspectionsEUGENE BIFULCOprogress
11/21/2025Maintenance informationEUGENE BIFULCOenergy_progress
11/21/2025HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
08/26/2025Post-installed AnchorsEUGENE BIFULCOspecial
08/26/2025Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
Latest 25 of 137.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Last CrumbsRestaurant / Food ServiceFloor 6
Project B01135372 Alteration · Permit Entire · 11/04/2024
CookUnityRestaurant / Food ServiceFloor 4, Roof
Project B00880825 Alteration · LOC Issued · 05/31/2023
Project B00766051 Alteration · Permit Entire · 07/25/2022
Project B00661928 Alteration · Permit Entire · 01/28/2022
Project B00661944 Alteration · Permit Entire · 01/28/2022
Project B00661967 Alteration · Permit Entire · 01/28/2022
Project B00669960 Alteration · Permit Entire · 01/28/2022
Project B00654690 Alteration · Permit Entire · 12/30/2021
FreshDirectOfficeFloor 2
Project B00702800 Alteration · LOC Issued · 05/26/2022
Acumen Capital PartnersOfficeFloors 1, 3
Project B00459587 Alteration · On Hold - Progress Inspector Withdrew · 02/22/2021
Project B00459594 Alteration · Permit Entire · 02/22/2021
Project B00463611 Alteration · Permit Entire · 02/22/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,569 on file (BIS + DOB NOW)
▸Plans & Drawings69
▸DOB NOWPlans/Sketch54
10/07/2026B01451435-I1Request digital key ↗
09/03/2026B00026073-I1Request digital key ↗
09/03/2026B00026075-I1Request digital key ↗
Showing 3 of 54 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00286923-I1Request digital key ↗
09/02/2026B00429222-I1Request digital key ↗
09/01/2026B00459594-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00241415-I1Request digital key ↗
09/02/2026B00241415-P1Request digital key ↗
09/02/2026B00325468-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00459587-I1Request digital key ↗
09/01/2026B00465581-I1Request digital key ↗
09/01/2026B00465581-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00442438-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/01/2026B00457849-I1Request digital key ↗
▸Applications & Permits326
▸BISPLAN / WORK APPROVAL APPLICATION154
01/13/2025321189806Open ↗
10/08/2024321512966Open ↗
11/25/2022322020086Open ↗
Showing 3 of 154 on file for this type
▸BISWORK PERMIT APPLICATION152
01/27/2021321905293Open ↗
01/07/2021340787973Open ↗
07/16/2020322020086Open ↗
Showing 3 of 152 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
08/21/2023321189806Open ↗
08/28/2019321189806Open ↗
▸Seals & Professional Certifications435
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION141
05/14/2020322019748Open ↗
03/21/2020322019748Open ↗
03/18/2020322020086Open ↗
Showing 3 of 141 on file for this type
▸DOB NOWProgress Inspector Seal & Signature74
10/08/2026B01451435-I1Open ↗
10/08/2026B01451435-I1Open ↗
09/23/2026B01275989-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature67
10/07/2026B01451435-I1Open ↗
09/03/2026B00026073-I1Open ↗
09/03/2026B00026075-I1Open ↗
Showing 3 of 67 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT41
12/09/2020340787973Open ↗
Showing 1 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
10/08/2026B01451435-I1Open ↗
09/23/2026B01275989-I1Open ↗
09/23/2026B01323003-I1Open ↗
Showing 3 of 32 on file for this type
▸BISProfessional and Owner Certification (POC3)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
12/09/2020340787973Open ↗
Showing 1 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
12/09/2020340787973Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment107
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE43
03/24/2020321923102Open ↗
03/20/2020321923102Open ↗
02/28/2020321915843Open ↗
Showing 3 of 43 on file for this type
▸BISSELF-CERT PLUMBING NOTICE25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISEQUIPMENT USE PERMITS15
09/29/2021321778135Open ↗
09/29/2021321778135Open ↗
09/29/2021321778135Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING12
11/06/2020321915843Open ↗
10/14/2020321915843Open ↗
03/19/2020321923102Open ↗
Showing 3 of 12 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
08/30/2019321850859Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
09/29/2021321778135Open ↗
09/29/2021321778135Open ↗
09/14/2021321778135Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
01/09/2020322020790Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos117
▸DOB NOWDEP ACP-5: Asbestos Assessment Report56
10/07/2026B01451435-I1Open ↗
09/03/2026B00026075-I1Open ↗
09/02/2026B00105068-I1Open ↗
Showing 3 of 56 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)50
01/07/2021340787973Open ↗
07/09/2020322020086Open ↗
12/23/2019322019748Open ↗
Showing 3 of 50 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026B00429222-I1Open ↗
09/02/2026B00442438-I1Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance98
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS66
05/14/2020322019748Open ↗
03/05/2020322019748Open ↗
03/04/2020322019748Open ↗
Showing 3 of 66 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
06/30/2021321778135Open ↗
03/24/2021322020086Open ↗
01/07/2021340787973Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/09/2020340787973Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
08/13/2021321469326Open ↗
06/30/2021321778135Open ↗
03/24/2021322020086Open ↗
▸DOB NOWEN2: As Built Energy Analysis3
09/01/2026B00582295-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/24/2021322020086Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY23
08/13/2021321469326Open ↗
06/30/2021321778135Open ↗
03/24/2021321075581Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/24/2019321726209Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/26/2020322020086Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/24/2021322020086Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
04/18/2022321075581Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/24/2021322020086Open ↗
▸Approvals, Objections & Sign-offs86
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
02/14/2023322020086Open ↗
09/21/2021321469326Open ↗
09/14/2021321778135Open ↗
Showing 3 of 35 on file for this type
▸BISADMINISTRATIVE OBJECTIONS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
01/13/2025321189806Open ↗
04/07/2021321189806Open ↗
03/03/2021321189806Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSUPERSEDING LETTER3
10/24/2019321726209Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership97
▸BISCOST AFFIDAVIT94
12/09/2020340787973Open ↗
01/16/2020322020086Open ↗
01/09/2020322020790Open ↗
Showing 3 of 94 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
10/26/2022322020086Open ↗
08/13/2021321469326Open ↗
06/30/2021321778135Open ↗
▸Filing & Intake Forms160
▸BISEFILING COVER SHEET72
01/16/2020322020086Open ↗
01/09/2020322020790Open ↗
12/23/2019322019748Open ↗
Showing 3 of 72 on file for this type
▸BISADDITIONAL INFORMATION62
01/27/2025321189806Open ↗
08/21/2023321189806Open ↗
04/20/2022321075581Open ↗
Showing 3 of 62 on file for this type
▸BISBOROUGH INTAKE FORM18
01/19/2021321075581Open ↗
05/14/2020322019748Open ↗
03/21/2020322019748Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
12/09/2020340787973Open ↗
Showing 1 of 8 on file for this type
▸Other Documents31
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION22
09/01/2020322020790Open ↗
06/26/2020322020086Open ↗
04/30/2020322020086Open ↗
Showing 3 of 22 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type