630 WEST 160TH STREET
MANHATTAN · BIN 1063318
💬 Discuss this project
1920Year Built
4Stories
G1Building Class
R8Zoning
48,400 sfGross Floor Area
1Units
LL97 Covered5 Active Violations 2 old, status unconfirmed ▸
All parking garages · 12,500 sf lot · 3.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNewYork-PresbyterianUnder Construction9p · 2 filings · 16 docs
Floor 7NewYork-Presbyterian5p · 1 filing · 10 docs
Floor 6NewYork-Presbyterian5p · 1 filing · 10 docs
Floor 5NewYork-Presbyterian5p · 1 filing · 10 docs
Floor 4NewYork-Presbyterian5p · 1 filing · 10 docs
Floor 3NewYork-Presbyterian5p · 1 filing · 10 docs
Floor 2NewYork-Presbyterian5p · 1 filing · 10 docs
Floor 1NewYork-Presbyterian5p · 1 filing · 10 docs
Site & exteriorNewYork-Presbyterian, New York Presbyterian HospitalUnder Construction13p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York Presbyterian Hospital2210/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Wellworth Consulting207/14/2026
O'Donnell & Naccarato Structural EN301/12/2026
Baileys Engineering106/22/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution603/21/2026
Municipal Expediting603/21/2026
United Safety Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2709/07/2026
Platinum Specialty ServicesGeneral Contractor607/08/2026
Top Shelf ElectricElectrical203/21/2026
DNA ContractingGeneral Contractor207/08/2026
Interstate ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423301/12/2026
Leo Y Lee Associates2481207/15/2025
Building Lifecycle
All (68)Filed (8)Permit Issued (20)Signed Off (3)Violation (13)Objection (16)Special Inspection (8)
09/08/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01413634-I1
07/15/2026
Permit issued — Sidewalk Shed
M01413634-I1-SH
07/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01413634-I1
06/10/2026
Permit issued — Structural
M01046545-I1-ST
06/03/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/22/2026
Signed off — Alteration
GARAGE REPAIR AT 160 ST: STRUCTURAL WORK INCLUDING CONCRETE REPAIRS, MASONRY, AND WATERPROOFING AND REMOVAL OF SHORING TO ACCOMMODATE THE GARAGE REPAIR PROJECT AT THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00949083-I1
03/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01275315-I1
03/03/2026
Permit issued — Sidewalk Shed
M00052197-I1-SH
01/12/2026
Filed — Alteration
GARAGE REPAIR AT 160 ST: STRUCTURAL WORK INCLUDING CONCRETE REPAIRS, MASONRY, AND WATERPROOFING AND REMOVAL OF SHORING TO ACCOMMODATE THE GARAGE REPAIR PROJECT AT THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00949083-P2
01/07/2026
Special inspection requirement — Final
Young Suh
01/07/2026
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
01/07/2026
Special inspection requirement — Masonry
Young Suh
01/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Young Suh
10/03/2025
Permit issued — Structural
M00949083-I1-ST
09/12/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01275315-I1
09/12/2025
Permit issued — Sidewalk Shed
M01275315-I1-SH
07/17/2025
Objection raised — Other
07/17/2025
Objection resolved — Addressed
07/17/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
07/15/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. AMEND #1 ADDED CHOOK OPTIONS
M01222469-P1
07/15/2025
Special inspection requirement — Post-installed Anchors
Leo Lee
06/05/2025
Permit issued — Structural
M01046545-I1-ST
05/21/2025
Permit issued — Suspended Scaffold
M01222469-I1-SC
05/19/2025
Objection raised — Other
05/19/2025
Objection resolved — Addressed
05/15/2025
Filed — Alteration
Facade repair as per plans.
M01046545-I1
05/12/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection. AMEND #1 ADDED CHOOK OPTIONS
M01222469-I1
03/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/28/2025
Permit issued — Sidewalk Shed
M00052197-I1-SH
11/13/2024
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
10/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2024
Permit issued — Structural
M00949083-I1-ST
09/27/2024
Permit issued — Structural
M00949083-I1-ST
09/12/2024
Violation issued (ECB, closed)
Construction
05/31/2024
Permit issued — Structural
M00949083-I1-ST
05/14/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/06/2024
Special inspection requirement — Masonry
Young Suh
05/06/2024
Special inspection requirement — Final
Young Suh
04/30/2024
Objection resolved — Addressed
04/30/2024
Objection resolved — Addressed
04/30/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/26/2024
Objection resolved — Addressed
04/10/2024
Objection raised — Inspections
04/10/2024
Objection raised — Admin
04/10/2024
Objection raised — Structural
04/10/2024
Objection raised — Admin
04/10/2024
Objection raised — Other
04/10/2024
Objection raised — Structural
04/08/2024
Filed — Alteration
GARAGE REPAIR AT 160 ST: STRUCTURAL WORK INCLUDING CONCRETE REPAIRS, MASONRY, AND WATERPROOFING AND REMOVAL OF SHORING TO ACCOMMODATE THE GARAGE REPAIR PROJECT AT THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00949083-I1
02/27/2024
Permit issued — Sidewalk Shed
M00052197-I1-SH
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2023
Permit issued — Sidewalk Shed
M00052197-I1-SH
03/03/2022
Permit issued — Sidewalk Shed
M00052197-I1-SH
09/02/2021
Violation issued (HPD, closed)
B
03/04/2021
Permit issued — Sidewalk Shed
M00052197-I1-SH
12/18/2020
Permit issued — Sidewalk Shed
M00052197-I1-SH
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSpring Scaffolding07/15/2026
DOB NOWStructuralPermit IssuedDNA Contracting06/10/2026
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/03/2026
DOB NOWStructuralSigned-offPlatinum Specialty Services10/03/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding09/12/2025
DOB NOWStructuralPermit IssuedPaul Charlton06/05/2025
DOB NOWSuspended ScaffoldPermit IssuedDNA Contracting05/21/2025
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding02/28/2025
DOB NOWStructuralSigned-offPlatinum Specialty Services09/30/2024
DOB NOWStructuralSigned-offPlatinum Specialty Services09/27/2024
DOB NOWStructuralSigned-offPlatinum Specialty Services05/31/2024
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding02/27/2024
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding02/27/2023
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/03/2022
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding03/04/2021
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding12/18/2020
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding02/28/2020
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding12/20/2019
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding06/18/2019
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding06/22/2018
BISOTISSUEDSkyline Restoration05/02/2018
BISOTISSUEDWest Contracting07/25/2000
BISEQISSUEDWolf Installation01/06/2000
BISOTISSUEDWolf Installation01/04/2000
BISOTISSUEDWolf Installation05/11/1999
BISOTISSUEDWolf Installation01/12/1999
BISEQISSUEDAtlantic Heydt12/17/1998
BISOTISSUEDWolf Installation08/05/1998
BISEQISSUEDAtlantic Scaffolding01/16/1998
BISEQISSUEDAtlantic Heydt Scaffold01/08/1998
4 projects · most recent 07/09/2026
FiledStatusContractorScope
07/09/2026Permit IssuedTop Shelf Electric—
07/30/2025CompleteTop Shelf Electric—
06/09/2025Permit IssuedInterstate Electric1 meters
06/14/2018CompleteTop Shelf Electric—
2 projects · most recent 01/12/2026
Masonry Concrete
FiledStatusContractorScope
01/12/2026Signed-offPlatinum Specialty ServicesConcrete, Masonry
05/15/2025Permit IssuedDNA ContractingMasonry
1 project · most recent 07/14/2026
Sidewalk Shed
FiledStatusContractorScope
07/14/2026Signed-offSpring ScaffoldingSidewalk Shed
1 project · most recent 07/15/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/15/2025Permit IssuedDNA ContractingSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
01/07/2026FinalYoung Suhprogress
01/07/2026Concrete - Cast-In-PlaceYoung Suhspecial
01/07/2026MasonryYoung Suhspecial
01/07/2026Structural Stability – Alterations of existing buildingsYoung Suhspecial
07/17/2025Post-installed AnchorsLeo Leespecial
07/15/2025Post-installed AnchorsLeo Leespecial
05/06/2024MasonryYoung Suhspecial
05/06/2024FinalYoung Suhprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NewYork-PresbyterianParkingFloors 1–7, Roof
Project M01046545 Alteration · Permit Entire · 05/15/2025
Project M00949083 Alteration · LOC Issued · 04/08/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/06/2026M00052197-I1Request digital key ↗
08/23/2026M01222469-I1Request digital key ↗
08/23/2026M01222469-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
05/03/2018123357606Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/19/2018123357606Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00052197-I1Open ↗
08/21/2026M01275315-I1Open ↗
08/16/2026M01413634-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01046545-I1Open ↗
08/28/2026M01222469-P1Open ↗
08/23/2026M01222469-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/09/2018123357606Open ↗
10/09/2018123357606Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026M01046545-I1Open ↗
08/23/2026M00949083-P2Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/19/2018123357606Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/19/2018123357606Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00949083-I1Open ↗
08/13/2026M00949083-P2Open ↗
08/13/2026M01046545-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/19/2018123357606Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/09/2018123357606Open ↗
10/09/2018123357606Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/09/2018123357606Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/23/2026M01222469-I1Open ↗
08/16/2026M01413634-I1Open ↗
08/13/2026M01275315-I1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/09/2018123357606Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/09/2018123357606Open ↗
04/19/2018123357606Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
04/19/2018123357606Open ↗
▸BISBOROUGH INTAKE FORM1
10/09/2018123357606Open ↗
▸Other Documents4
▸DOB NOWCalculations2
08/23/2026M01222469-I1Open ↗
08/13/2026M01222469-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/23/2026M01222469-I1Open ↗
08/13/2026M01222469-P1Open ↗