← Back
Single or multiple dwelling with stores or offices
6301 10 AVENUE
BROOKLYN · BIN 3141721
💬 Discuss this project
1930Year Built
3Stories
S9Building Class
R5BZoning
4,480 sfGross Floor Area
6Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 6301 10TH AVE, LLC · 1,600 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UME HOSPITALITY MANAGEMENT507/08/2026
6301 10TH AVE, LLC103/22/2026
CUBE BUILDERS GROUP NY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/25/2024$2.2M—— → —$497/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HWL ENGINEERING PC205/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HCNY MANAGEMENT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HWL ENGINEERING PC3894205/01/2024
Building Lifecycle
All (32)Filed (2)Permit Issued (2)Violation (22)Inspection (2)Special Inspection (4)
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, closed)
I
10/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/14/2024
Violation issued (ECB, closed)
Construction
06/02/2024
Permit issued — General Construction
B01035491-I1-GC
05/13/2024
Permit issued — Plumbing
B01035491-S1-PL
05/01/2024
Filed — Alteration
Interior renovation of 1st floor and Cellar of existing Multiple Dwelling with Stores or Offices ( S9 ) building.
B01035491-S1
04/29/2024
Filed — Alteration
Interior renovation of 1st floor and Cellar of existing Multiple Dwelling with Stores or Offices ( S9 ) building.
B01035491-I1
04/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
04/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WANLONG HE
04/14/2024
Special inspection requirement — Mechanical Systems
WANLONG HE
04/14/2024
Special inspection requirement — Final
WANLONG HE
04/03/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
09/23/1986
Violation issued (HPD, open)
B
11/15/1982
Violation issued (HPD, open)
B
11/15/1982
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY06/02/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC05/13/2024
1 project · most recent 05/01/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/01/2024Permit IssuedCUBE BUILDERS GROUP NYAir Conditioning Systems
Cooling
Mitsubishi Electric SUZ-ka30nahz & svz-kp30na 30,000 BTU · Split System ×2
1 project · most recent 05/01/2024
Water/Sanitary
FiledStatusContractorScope
05/01/2024Signed-offT & T PLUMBING INCWater/Sanitary
1 project · most recent 05/20/2024
General Wiring
FiledStatusContractorScope
05/20/2024CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/29/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
04/26/2024Fire-Resistant Penetrations and JointsWANLONG HEspecial
04/14/2024Mechanical SystemsWANLONG HEspecial
04/14/2024FinalWANLONG HEprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026B01035491-I1Request digital key ↗
08/25/2026B01035491-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026B01035491-S1Open ↗
08/22/2026B01035491-I1Open ↗
08/22/2026B01035491-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026B01035491-I1Open ↗
08/25/2026B01035491-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B01035491-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026B01035491-I1Open ↗
08/25/2026B01035491-S1Open ↗