← Back
Elevator apt, semi-fireproof without stores
6309 BAY PARKWAY
BROOKLYN · BIN 3172182
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R6AZoning
64,800 sfGross Floor Area
82Units
LL97 CoveredRent Stabilized29 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 6309 BAY PARKWAY LLC · 14,000 sf lot · 4.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 12p · 1 filing · 3 docs
Cellar3p · 2 filings · 20 docs
2 jobs · most recent 09/07/2021
General Wiring
FiledStatusContractorScope
09/07/2021Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
03/06/2018Permit IssuedMANELECTRIC, INCGeneral Wiring
Building Lifecycle
All (89)Filed (3)Permit Issued (4)Signed Off (1)Violation (60)Inspection (5)Special Inspection (16)
08/05/2026
Violation issued (ECB, open)
Construction
07/15/2026
Violation issued (HPD, closed)
B
07/15/2026
Violation issued (HPD, closed)
B
03/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2024
Violation issued (HPD, closed)
B
10/16/2024
Violation issued (HPD, open)
C
10/16/2024
Violation issued (HPD, closed)
B
10/16/2024
Violation issued (HPD, closed)
B
10/16/2024
Violation issued (HPD, closed)
B
10/16/2024
Violation issued (HPD, closed)
B
10/16/2024
Violation issued (HPD, closed)
B
08/22/2024
Violation issued (ECB, open)
Construction
02/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2023
Permit issued — Plumbing
B00624259-I1-PL
11/15/2023
Violation issued (HPD, closed)
B
11/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2023
Violation issued (HPD, closed)
B
05/16/2023
Violation issued (HPD, closed)
B
05/16/2023
Violation issued (HPD, closed)
A
05/16/2023
Violation issued (HPD, closed)
B
05/16/2023
Violation issued (HPD, closed)
C
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2023
Violation issued (HPD, closed)
A
12/16/2022
Violation issued (HPD, open)
A
12/16/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, open)
A
12/15/2022
Violation issued (HPD, open)
A
12/15/2022
Violation issued (HPD, closed)
C
12/15/2022
Violation issued (HPD, closed)
C
12/01/2022
Permit issued — Plumbing
B00624259-I1-PL
11/26/2022
Violation issued (HPD, closed)
B
11/26/2022
Violation issued (HPD, open)
B
11/26/2022
Violation issued (HPD, closed)
C
11/26/2022
Violation issued (HPD, closed)
C
11/26/2022
Violation issued (HPD, closed)
C
09/15/2022
Signed off — Alteration
MISC. RENOVATIONS IN APT A7 FIRST FLOOR & CELLAR. WORK TO INCLUDE DEMOLITION, NEW PARTITIONS, FIRE STOPPING, NEW KITCHEN AND BATHROOM FINISHES, AND CONVENIENCE STAIR TO THE CELLAR ACCESSORY STORAGE. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.
B00564970-I1
09/09/2022
Permit issued — Structural
B00564970-I1-ST
09/09/2022
Special inspection requirement — Concrete - Cast-In-Place
Nazzareno Callipo
09/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nazzareno Callipo
09/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nazzareno Callipo
09/09/2022
Special inspection requirement — Masonry
Nazzareno Callipo
09/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
Nazzareno Callipo
09/09/2022
Special inspection requirement — Final
Nazzareno Callipo
09/09/2022
Special inspection requirement — Lighting in dwelling units
Nazzareno Callipo
09/09/2022
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
09/08/2022
Filed — Alteration
MISC. RENOVATIONS IN APT A7 FIRST FLOOR & CELLAR. WORK TO INCLUDE DEMOLITION, NEW PARTITIONS, FIRE STOPPING, NEW KITCHEN AND BATHROOM FINISHES, AND CONVENIENCE STAIR TO THE CELLAR ACCESSORY STORAGE. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.
B00564970-P1
09/08/2022
Special inspection requirement — Concrete - Cast-In-Place
Nazzareno Callipo
09/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nazzareno Callipo
09/08/2022
Special inspection requirement — Masonry
Nazzareno Callipo
09/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nazzareno Callipo
09/08/2022
Special inspection requirement — Final
Nazzareno Callipo
09/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
Nazzareno Callipo
09/08/2022
Special inspection requirement — Lighting in dwelling units
Nazzareno Callipo
09/08/2022
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
02/23/2022
Violation issued (HPD, closed)
A
02/14/2022
Violation issued (HPD, closed)
B
02/14/2022
Violation issued (HPD, closed)
B
Latest 60 of 89 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
6309 BAY PARKWAY2703/22/2026
6309 BAY PKY LLC203/22/2026
6309 REALTY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NAZZARENO CALLIPO P.E.309/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GZ NC CODE PLANNING ENGINEERING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
957 GREEN AVE LLCGeneral Contractor603/21/2026
ORBIT PLBG & HTG INCPlumbing407/08/2026
MANFREDINI, NICHOLASElectrical103/21/2026
AI FANG WUElectrical103/21/2026
NICHOLAS MANFREDINIElectrical103/21/2026
MAZUR, MAREKElectrical103/21/2026
MANELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GZ & NC CODE CONSULTING P7492309/08/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC11/28/2023
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC12/01/2022
DOB NOWStructuralSigned-off957 GREEN AVE LLC09/09/2022
DOB NOWGeneral ConstructionSigned-off957 GREEN AVE LLC12/28/2021
BISCCISSUEDMARCO POLO DESIGN CORP04/25/2011
BISFSISSUEDNEAL M. RUDIKOFF08/07/1997
BISPLISSUEDUNLIMITED MECHANICAL PLUMBING07/30/1997
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
09/09/2022Concrete - Cast-In-PlaceNazzareno Callipospecial
09/09/2022Fire-Resistant Penetrations and JointsNazzareno Callipospecial
09/09/2022Structural Stability – Alterations of existing buildingsNazzareno Callipospecial
09/09/2022MasonryNazzareno Callipospecial
09/09/2022Fire-Resistance Rated ConstructionNazzareno Callipoprogress
09/09/2022FinalNazzareno Callipoprogress
09/09/2022Lighting in dwelling unitsNazzareno Callipoenergy_progress
09/09/2022Insulation placement and R valuesNazzareno Callipoenergy_progress
09/08/2022Concrete - Cast-In-PlaceNazzareno Callipospecial
09/08/2022Fire-Resistant Penetrations and JointsNazzareno Callipospecial
09/08/2022MasonryNazzareno Callipospecial
09/08/2022Structural Stability – Alterations of existing buildingsNazzareno Callipospecial
09/08/2022FinalNazzareno Callipoprogress
09/08/2022Fire-Resistance Rated ConstructionNazzareno Callipoprogress
09/08/2022Lighting in dwelling unitsNazzareno Callipoenergy_progress
09/08/2022Insulation placement and R valuesNazzareno Callipoenergy_progress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00624259-I1Request digital key ↗
08/31/2026B00564970-I1Request digital key ↗
08/31/2026B00564970-P1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/11/2011320291965Open ↗
▸BISWORK PERMIT APPLICATION1
04/26/2011320291965Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00564970-I1Open ↗
09/01/2026B00564970-I1Open ↗
09/01/2026B00564970-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00564970-I1Open ↗
09/01/2026B00564970-I1Open ↗
09/01/2026B00564970-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/31/2026B00624259-I1Open ↗
08/31/2026B00564970-I1Open ↗
08/31/2026B00564970-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/11/2011320291965Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026B00624259-I1Open ↗
08/31/2026B00564970-I1Open ↗
08/31/2026B00564970-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/11/2011320291965Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00564970-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
04/11/2011320291965Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/11/2011320291965Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/11/2011320291965Open ↗