DOB11/23/2013DUE TO SEVERE WEATER CAUSED BY HURRICANE SANDY THE FOLLOWING DAMAGES OCCURED: DUE TO DAMAGES CAUSED BY FLOODING BOILER AND HOTWATER HEATER REPLACED WITH ONE CROWN BOILER AND ONE A.O. SMITH HOTWATER HEATER IN CELLAR. REMEDY: MAKE ALL NECESSARY REPAIRS AND OBTAIN ALL REQUIRED PERMITS WHERE APPLICABLE MUST OBTAIN PERMIT 60 DAYS FROM DATE OF INSPE
Two stories - detached, small or mid-size · 2,500 sf lot · 0.54 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.