← Back
Primarily 2 family with 1 store or office
6321 20 AVENUE
BROOKLYN · BIN 3133255
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R5Zoning
3,122 sfGross Floor Area
3Units
Rent Stabilized19 Open Violations 15 unresolved · 4 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,892 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 9 docs
Floor 19p · 3 filings · 20 docs
Cellar4p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YAMU REALTY407/08/2026
KWMILE REALTY1407/08/2026
SHENI SAKHLI CORP1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA410/29/2024
ASHRAF CORP101/10/2023
JKW ENGINEERING, P.C.409/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JKW ENGINEERING PC803/21/2026
CM3 DESIGN STUDIO403/21/2026
SUPERIOR FIRE CONTROL103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELUXE CORPGeneral Contractor403/21/2026
CROSSFIELD PLBG.&HTGPlumbing407/08/2026
RITE WAY HEATINGGeneral Contractor303/22/2026
RITE WAY HEATING CORPPlumbing207/08/2026
RYBURN PHILLIPSElectrical103/21/2026
DONE RIGHT KITCHEN EXHAUSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAY KAVI CORPORATION8500101/10/2023
JKW ENGINEERING, P.C.1856101/21/2021
Building Lifecycle
All (71)Filed (9)Permit Issued (5)Violation (36)Inspection (8)Special Inspection (13)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Violation issued (FDNY_ORDER, closed)
05/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2024
Filed — Alteration
Install new cooking equipment on existing gas line. And replace existing toilet, lavatory and two sinks. No change in occupancy, use or egress.
B01026430-P3
10/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/23/2024
Filed — Alteration
Install new cooking equipment on existing gas line. And replace existing toilet, lavatory and two sinks. No change in occupancy, use or egress.
B01026430-P2
10/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/19/2024
Filed — Alteration
Install new cooking equipment on existing gas line. And replace existing toilet, lavatory and two sinks. No change in occupancy, use or egress.
B01026430-P1
08/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2024
Permit issued — Plumbing
B01026430-I1-PL
03/27/2024
Filed — Alteration
Install new cooking equipment on existing gas line. And replace existing toilet, lavatory and two sinks. No change in occupancy, use or egress.
B01026430-I1
04/18/2023
Permit issued — Mechanical Systems
B08048815-I1-MS
01/10/2023
Filed — Alteration
INSTALL KITCHEN HOOD AND DUCTWORK FOR EXISTING STORE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08048815-I1
12/23/2022
Special inspection requirement — Energy Code Compliance Inspections
AKM HOQUE
12/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
12/02/2022
Special inspection requirement — Final
BRIAN MCCAFFREY
12/02/2022
Special inspection requirement — Duct leakage testing, insulation and design
AKM HOQUE
12/02/2022
Special inspection requirement — Mechanical Systems
Jay Kavi
12/02/2022
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
12/16/2021
Violation issued (HPD, closed)
I
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, open)
C
12/12/2021
Violation issued (HPD, open)
A
12/12/2021
Violation issued (HPD, open)
C
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, open)
B
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
C
12/12/2021
Violation issued (HPD, closed)
B
09/23/2021
Filed — Alteration
Renovate existing eating & drinking establishment. Install new plumbing fixtures as per plan. Filed in conjunction with Job # B00451065. No change in egress, occupancy or use is involved under this application.
B00459372-P2
09/17/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/31/2021
Filed — Alteration
Renovate existing eating & drinking establishment. Install new plumbing fixtures as per plan. Filed in conjunction with Job # B00451065. No change in egress, occupancy or use is involved under this application.
B00459372-P1
08/27/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/27/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/25/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/19/2021
Permit issued — Plumbing
B00459372-I1-PL
03/23/2021
Permit issued — General Construction
B00451065-I1-GC
02/08/2021
Permit issued — General Construction
B00451065-I1-GC
01/31/2021
Filed — Alteration
Renovate existing eating & drinking establishment. Install new plumbing fixtures as per plan. Filed in conjunction with Job # B00451065. No change in egress, occupancy or use is involved under this application.
B00459372-I1
01/21/2021
Filed — Alteration
Renovate existing store to eating & drinking establishment. Install partition walls, finishing walls, floor and ceiling. No change in egress, occupancy or use is involved under this application.
B00451065-I1
01/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Wai
01/09/2021
Special inspection requirement — Lighting controls
James Wai
01/09/2021
Special inspection requirement — Energy Code Compliance Inspections
James Wai
01/09/2021
Special inspection requirement — Interior lighting power
James Wai
11/29/2017
Violation issued (HPD, open)
B
06/08/2017
Violation issued (ECB, closed)
Construction
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLS PLUMBING CORP04/09/2024
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT KITCHEN EXHAUS04/18/2023
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG07/19/2021
DOB NOWGeneral ConstructionPermit IssuedDELUXE CORP03/23/2021
DOB NOWGeneral ConstructionPermit IssuedDELUXE CORP02/08/2021
BISOTISSUEDHIGH QUALITY CONSTRUCTION04/23/2019
BISFPISSUEDN Y BUSINESS FIRE SYSTEM INC10/05/2006
BISOTISSUEDEMPLOYER CONST CO08/08/2006
1 project · most recent 01/10/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/10/2023Permit IssuedDONE RIGHT KITCHEN EXHAUSVentilation Systems
Ventilation
Captiveaire DU240HFA 3,300 CFM · Kitchen Exhaust ×1
2 projects · most recent 10/29/2024
Gas Water/Sanitary
FiledStatusContractorScope
10/29/2024Signed-offRITE WAY HEATING CORPGas, Water/Sanitary
09/23/2021Permit IssuedCROSSFIELD P & H CORPGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/27/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/25/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/29/2024Tenant Protection Plan Compliance—special
10/23/2024Tenant Protection Plan Compliance—special
08/18/2024Tenant Protection Plan Compliance—special
12/23/2022Energy Code Compliance InspectionsAKM HOQUEprogress
12/23/2022Fire-Resistant Penetrations and JointsJay Kavispecial
12/02/2022FinalBRIAN MCCAFFREYprogress
12/02/2022Duct leakage testing, insulation and designAKM HOQUEenergy_progress
12/02/2022Mechanical SystemsJay Kavispecial
12/02/2022Tenant Protection Plan ComplianceJay Kavispecial
01/09/2021Fire-Resistant Penetrations and JointsJames Waispecial
01/09/2021Lighting controlsJames Waienergy_progress
01/09/2021Energy Code Compliance InspectionsJames Waiprogress
01/09/2021Interior lighting powerJames Waienergy_progress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
08/28/2026B08048815-I1Request digital key ↗
08/25/2026B01026430-P2Request digital key ↗
08/25/2026B01026430-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00459372-P1Request digital key ↗
09/01/2026B00459372-I1Request digital key ↗
08/15/2026B00459372-P2Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00451065-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/03/2018321690648Open ↗
▸BISWORK PERMIT APPLICATION1
04/25/2019321690648Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00451065-I1Open ↗
09/01/2026B00459372-I1Open ↗
09/01/2026B00459372-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/29/2026B08048815-I1Open ↗
09/29/2026B08048815-I1Open ↗
09/29/2026B08048815-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026B08048815-I1Open ↗
09/29/2026B08048815-I1Open ↗
09/29/2026B08048815-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/03/2018321690648Open ↗
01/03/2018321690648Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/03/2018321690648Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/03/2018321690648Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/03/2018321690648Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00451065-I1Open ↗
09/01/2026B00459372-P1Open ↗
09/01/2026B00459372-I1Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/03/2018321690648Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
04/30/2019321690648Open ↗
▸BISEFILING COVER SHEET1
01/04/2018321690648Open ↗