← Back
Walk-up apt, over six families with stores
633 LENOX AVENUE
MANHATTAN · BIN 1060093
💬 Discuss this project
1915Year Built
6Stories
C7Building Class
R7-2Zoning
14,519 sfGross Floor Area
17Units
Rent Stabilized13 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 4,000 sf lot · 3.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 9 docs
Floor 65p · 1 filing · 20 docs
Floor 55p · 1 filing · 20 docs
Floor 45p · 1 filing · 20 docs
Floor 35p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE3107/08/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
HOUSING PRESERVATION DEVELOP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC1307/25/2025
ASHRAF CORP104/30/2025
SYNERGIC DESIGN ARCHITECTS101/13/2025
ARQUITECTURA VARELA110/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN STANDARD P&H CORORP.Plumbing707/08/2026
HORIZON CONSTRUCTION INCGeneral Contractor404/09/2026
ACCORD POWER INCGeneral Contractor203/21/2026
ALPHA SCAFFOLDING INCGeneral Contractor204/09/2026
DUDLEY JAMALElectrical103/21/2026
JAMAL DUDLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831207/25/2025
SYNERGIC DESIGN LLC8561101/13/2025
Building Lifecycle
All (131)Filed (16)Permit Issued (11)Signed Off (8)Violation (60)Inspection (6)Special Inspection (30)
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, closed)
A
03/18/2026
Signed off — Alteration
Boiler replacement as per plan, no change to use egress or occupancy
M01047605-S1
02/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/12/2026
Signed off — Alteration
Boiler replacement as per plan, no change to use egress or occupancy
M01047605-S2
02/12/2026
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen and bath per revised layout at apt 1A.No change in use egress or occupancy.
M00829251-I1
01/30/2026
Signed off — Alteration
M00826966-I1
01/22/2026
Signed off — Alteration
Renovated bathroom and kitchen at apt 1A for ADA compliance no change to use egress of occupancy.
M00830435-I1
01/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/27/2025
Violation issued (HPD, closed)
C
12/22/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/05/2025
Permit issued — Boiler Equipment
M01047605-S2-BE
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/16/2025
Permit issued — General Construction
M00830435-I1-GC
10/16/2025
Permit issued — General Construction
M00826966-I1-GC
10/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01120923-I1
10/11/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01215625-I1
10/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2025
Permit issued — Boiler Equipment
M01047605-I1-BE
09/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
09/11/2025
Permit issued — Plumbing
M01047605-S1-PL
09/07/2025
Violation issued (HPD, closed)
C
08/16/2025
Violation issued (HPD, open)
C
08/16/2025
Violation issued (HPD, open)
C
08/05/2025
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
08/05/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
07/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/25/2025
Filed — Alteration
M00826966-P2
07/25/2025
Filed — Alteration
Boiler replacement as per plan, no change to use egress or occupancy
M01047605-P2
07/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Air barrier - visual inspection
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Exterior lighting power
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Insulation placement and R values
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Fenestration air leakage
ALEXIS SCHLESSINGERMAN
07/24/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/17/2025
Filed — Alteration
Replace and relocate plumbing fixtures at kitchen and bath per revised layout at apt 1A.No change in use egress or occupancy.
M00829251-P2
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
07/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/15/2025
Filed — Alteration
Boiler replacement as per plan, no change to use egress or occupancy
M01047605-S2
07/14/2025
Filed — Alteration
Boiler replacement as per plan, no change to use egress or occupancy
M01047605-P1
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.12/05/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/16/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.09/25/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/11/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.07/01/2025
DOB NOWSupported ScaffoldSigned-offALPHA SCAFFOLDING INC05/01/2025
DOB NOWSolarSigned-offACCORD POWER INC02/13/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC11/04/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC10/24/2024
DOB NOWSidewalk ShedSigned-offALPHA SCAFFOLDING INC10/04/2024
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTING04/26/2005
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING04/22/2005
BISPLISSUEDPVTHAGORAS GENERAL CONTRACTING C01/31/2005
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING12/28/2004
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING06/30/2004
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTING05/18/2004
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING05/18/2004
BIS—ISSUEDPYTHAGORAS GENERAL CONTRACTING06/23/2003
BISEQISSUEDPYTHAGORAS GENERAL CONTRACTING06/23/2003
BISEQISSUEDPATTI CONSTRUCTION CORP04/03/2001
BISOTISSUEDPUAR GENERAL CONSTRUCTION INC01/31/2001
BISOTISSUEDPUAR GENERAL CONSTRUCTION INC12/07/2000
BISOTISSUEDRAZA ZI CONSTRUCTION CO.08/10/2000
BISOTISSUEDMEHTAB CONSR CORP09/27/1999
BISOTISSUEDBARNETT IRON ASSOCIATES02/24/1999
BISOTISSUEDQUICK & PROFESSIONAL CORP.04/22/1998
BISPLISSUEDNEW ERA MECHANICAL SER IN09/29/1997
BISOTISSUEDQUICK & PROFESSIONAL CORP.06/25/1997
3 projects · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026CompleteHI-RITE ELECTRIC CORPGeneral Wiring
01/13/2025CompleteACCORD POWER ELECTRIC LLC—
10/03/2024CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
09/17/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
09/17/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/17/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
08/05/2025Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
08/05/2025Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/05/2025Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
08/05/2025Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
08/05/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
08/05/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
08/05/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
08/05/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
08/05/2025FinalALEXIS SCHLESSINGERMANprogress
08/05/2025Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
08/05/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
07/27/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/24/2025Fenestration and door U-factor and product ratingsALEXIS SCHLESSINGERMANenergy_progress
07/24/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
07/24/2025Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
07/24/2025Exterior lighting powerALEXIS SCHLESSINGERMANenergy_progress
07/24/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
07/24/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
07/24/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
07/24/2025Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
07/24/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
07/24/2025Fenestration air leakageALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 50.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/28/2026M00829251-I1Request digital key ↗
08/28/2026M00829251-P1Request digital key ↗
08/28/2026M00829251-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026M00829251-P1Open ↗
08/28/2026M00829251-I1Open ↗
08/28/2026M00829251-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026M01047605-S2Open ↗
09/23/2026M01047605-I1Open ↗
09/02/2026M01128040-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026M01047605-S2Open ↗
09/23/2026M01047605-I1Open ↗
09/02/2026M01128040-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026M00829251-I1Open ↗
08/28/2026M00829251-P1Open ↗
08/28/2026M00829251-P2Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/22/2026M01047605-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/28/2026M00829251-I1Open ↗
08/28/2026M00829251-P1Open ↗
08/28/2026M00829251-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01128040-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00826966-P2Open ↗
08/13/2026M00826966-P1Open ↗
08/13/2026M00826966-I1Open ↗