← Back
Elevator cooperative
633 PARK AVENUE
MANHATTAN · BIN 1042448
💬 Discuss this project
1913Year Built
13Stories
D4Building Class
R10Zoning
67,600 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 635 PARK AVE CORP · 6,034 sf lot · 11.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 1 doc
Floor 118p · 2 filings · 20 docs
Floor 10
Floor 9Under Construction25p · 1 filing · 20 docs
Floor 8Under Construction26p · 1 filing · 19 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 6 docs
Floor 1
Basement3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRAT ENTERPRISES2807/08/2026
BLDG307/08/2026
SPRING SCAFFOLDING LLC903/22/2026
635 PARK AVENUE2703/22/2026
635 PARK AVENUE CORP C O BHSUSA703/22/2026
HIGHLINE CONSTRUCTION GR203/22/2026
BHS INC H/C 6350103/22/2026
BHS INC H/L 6350103/22/2026
635 PARK AVE CORP C 0 BHS203/21/2026
WILDWOOD TRUST703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRAT ENTERPRISES CORPGeneral Contractor2207/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor603/21/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor607/08/2026
ANCHOR PLUMBING CORPPlumbing307/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
IVAN DP CONSTRUCTION LLCGeneral Contractor207/08/2026
ZIP ELECTRIC INCElectrical203/22/2026
GANIC PLUMBING & HTG INCPlumbing107/08/2026
ARIES CONSTRUCTION CO,INCGeneral Contractor107/08/2026
EURO T.I. INCGeneral Contractor104/09/2026
SILVERLINING INTERIORSGeneral Contractor107/08/2026
WHITE LEAF MECHANICAL CORGeneral Contractor104/09/2026
ALEXANDROS STELLATOSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JMV CONSULTING ENGINEERIN804508/18/2026
WELLS DESIGN & CONSULTING7750311/12/2025
KZ ENGINEERING, P.C.4665204/17/2025
MIDTOWN PRESERVATION ARCH2634110/19/2023
OUTSOURCE SPECIAL INSPECT2827302/14/2022
CES ENGINEERING LLC1277102/14/2022
SPECIAL INSPECTION SERVIC1200206/23/2021
Building Lifecycle
All (237)Filed (28)Permit Issued (33)Signed Off (14)Facade (FISP) (21)Violation (59)Inspection (10)Objection (42)Special Inspection (30)
09/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2026
Filed — Alteration
MECHANICAL MODIFICATION OF INTERIOR RENOVATION TO EXISTING UNIT ON 9TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS
M01286413-P1
08/12/2026
Filed — Alteration
MECHANICAL MODIFICATION OF INTERIOR RENOVATION TO EXISTING UNIT ON 9TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS
M01286413-P2
07/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/07/2026
Cycle 10 facade report signed — SAFE
03/02/2026
Cycle 10 facade report submitted
02/19/2026
Cycle 10 facade inspection completed
01/29/2026
Permit issued — Plumbing
M01210200-S1-PL
01/22/2026
Permit issued — General Construction
M01210200-I1-GC
01/21/2026
Permit issued — Mechanical Systems
M01210200-S2-MS
01/21/2026
Permit issued — Plumbing
M01286413-S2-PL
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/18/2025
Permit issued — General Construction
M01286413-I1-GC
12/17/2025
Objection raised — Scope
12/17/2025
Objection raised — Scope
12/16/2025
Permit issued — Mechanical Systems
M01286413-S1-MS
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
11/13/2025
Objection raised — Inspections
11/13/2025
Objection raised — Mechanical
11/13/2025
Objection raised — Scope
11/13/2025
Objection raised — Structural
11/13/2025
Objection raised — Other
11/13/2025
Objection raised — Structural
11/13/2025
Objection raised — Mechanical
11/13/2025
Objection raised — Inspections
11/12/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01210200-I1
11/12/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01210200-S2
11/12/2025
Filed — Alteration
MH WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01210200-S1
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tyrone Wells
11/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Vuto
11/10/2025
Signed off — Alteration
M00914355-I1
11/07/2025
Signed off — Alteration
FACADE RESTORATION/ INSPECTION
M01211550-I1
10/17/2025
Objection raised — Scope
10/17/2025
Objection raised — Scope
10/17/2025
Objection raised — Scope
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tyrone Wells
10/15/2025
Special inspection requirement — Mechanical Systems
Tyrone Wells
10/15/2025
Special inspection requirement — Final
Tyrone Wells
10/08/2025
Filed — Alteration
MECHANICAL MODIFICATION OF INTERIOR RENOVATION TO EXISTING UNIT ON 9TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS
M01286413-I1
10/08/2025
Filed — Alteration
MECHANICAL MODIFICATION OF INTERIOR RENOVATION TO EXISTING UNIT ON 9TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS
M01286413-S1
10/08/2025
Filed — Alteration
MECHANICAL MODIFICATION OF INTERIOR RENOVATION TO EXISTING UNIT ON 9TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS
M01286413-S2
10/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Joseph Vuto
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
10/08/2025
Special inspection requirement — Post-installed Anchors
Joseph Vuto
09/16/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00961296-I1
09/16/2025
Signed off — Alteration
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00966571-I1
Latest 60 of 237 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedGANIC PLUMBING & HTG INC01/29/2026
DOB NOWGeneral ConstructionPermit IssuedEURO T.I. INC01/22/2026
DOB NOWMechanical SystemsPermit IssuedWHITE LEAF MECHANICAL COR01/21/2026
DOB NOWPlumbingPermit IssuedANCHOR PLUMBING CORP01/21/2026
DOB NOWGeneral ConstructionPermit IssuedIVAN DP CONSTRUCTION LLC12/18/2025
DOB NOWMechanical SystemsPermit IssuedIVAN DP CONSTRUCTION LLC12/16/2025
DOB NOWSuspended ScaffoldPermit IssuedPRAT ENTERPRISES CORP05/07/2025
DOB NOWSuspended ScaffoldPermit IssuedPRATT CONSTRUCTION & RES01/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offPRAT ENTERPRISES CORP11/13/2024
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP11/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offPRAT ENTERPRISES CORP11/13/2024
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP11/12/2024
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP10/22/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/22/2024
DOB NOWSuspended ScaffoldPermit IssuedPRATT CONSTRUCTION & RES01/04/2024
DOB NOWSupported ScaffoldSigned-offPRAT ENTERPRISES CORP11/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRAT ENTERPRISES CORP11/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offPRAT ENTERPRISES CORP11/24/2023
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP11/24/2023
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP11/17/2023
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR05/09/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/08/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/22/2023
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR02/03/2023
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR02/03/2023
DOB NOWGeneral ConstructionSigned-offARIES CONSTRUCTION CO,INC09/29/2022
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR05/19/2022
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR03/03/2022
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/03/2022
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR03/01/2022
DOB NOWMechanical SystemsSigned-offSILVERLINING INTERIORS02/08/2021
DOB NOWPlumbingSigned-offANCHOR PLUMBING CORP02/02/2021
DOB NOWPlumbingSigned-offANCHOR PLUMBING CORP01/08/2020
BISPLISSUEDDONATO PLUMBING, INC08/03/2021
BISMHISSUEDV. DISALVO CONTRACTING CO02/02/2021
BISOTISSUEDHIGHLINE CONSTRUCTION GR02/02/2021
BISMHISSUEDHIGHLINE CONSTRUCTION GR02/02/2021
BISOTISSUEDHIGHLINE CONSTRUCTION GR02/02/2021
BISOTISSUEDSILVERLINING INTERIORS01/29/2021
BISOTISSUEDHIGHLINE CONSTRUCTION GR10/02/2020
+ 43 more permits on file
2 projects · most recent 08/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedIVAN DP CONSTRUCTION LLCAir Conditioning Systems
Cooling
Task Applied Products TYC051CAV 29,800 BTU · Condensing Unit ×1
11/12/2025Permit IssuedEURO T.I. INCAir Conditioning Systems
Cooling
Task ×3
2 projects · most recent 08/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/18/2026Permit IssuedANCHOR PLUMBING CORPWater/Sanitary
11/12/2025Permit IssuedGANIC PLUMBING & HTG INCGas, Water/Sanitary
18 projects · most recent 02/04/2026
General Wiring Lighting
FiledStatusContractorScope
02/04/2026Permit IssuedPOWER SURGE ELECTRICAL INGeneral Wiring
01/27/2026Permit IssuedARREE ELECTRIC CORPGeneral Wiring
10/03/2025CompleteDAVEN ELECTRIC CORP—
11/19/2023CompleteAUR0RA ELECL CONTG INC—
09/11/2023CompleteECO ELECTRICAL SERVCS LLCGeneral Wiring, Lighting
02/22/2023CompleteTOP SHELF ELECTRIC CORP—
10/13/2022CompleteWTG ELECTRIC INC.—
02/17/2021CompleteECO ELECTRICAL SERVCS LLCGeneral Wiring, Lighting
02/07/2021CompleteZIP ELECTRIC INCGeneral Wiring
12/02/2020Permit IssuedROBERT CHIMENTIGeneral Wiring
11/25/2020Permit IssuedBELMONT ELECTRICAL, INCGeneral Wiring
11/03/2020CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
10/02/2020CompleteZIP ELECTRIC INCGeneral Wiring
08/10/2020Permit IssuedMAXIMUM ELECTRIC CORP.1 meters, 1 new_meters
12/09/2019CompleteECO ELECTRICAL SERVCS LLC—
2 projects · most recent 08/18/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/18/2026Permit IssuedANCHOR PLUMBING CORPTenant Protection Plan 72 Hour
11/12/2025Permit IssuedGANIC PLUMBING & HTG INCTenant Protection Plan 72 Hour
1 project · most recent 12/13/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/13/2023Permit IssuedPRAT ENTERPRISES, CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
11/12/2025Fire-Resistant Penetrations and JointsTyrone Wellsspecial
11/11/2025Tenant Protection Plan ComplianceJoseph Vutospecial
10/15/2025Fire-Resistant Penetrations and JointsTyrone Wellsspecial
10/15/2025Mechanical SystemsTyrone Wellsspecial
10/15/2025FinalTyrone Wellsprogress
10/08/2025Fire-Resistance Rated ConstructionJoseph Vutoprogress
10/08/2025Fire-Resistant Penetrations and JointsJoseph Vutospecial
10/08/2025Post-installed AnchorsJoseph Vutospecial
09/12/2025FinalJoseph Vutoprogress
09/12/2025FinalRandall Goyaprogress
09/12/2025Mechanical SystemsJoseph Vutospecial
09/12/2025Fire-Resistant Penetrations and JointsJoseph Vutospecial
09/12/2025Post-installed AnchorsJoseph Vutospecial
09/12/2025Tenant Protection Plan ComplianceJoseph Vutospecial
09/12/2025Maintenance informationJoseph Vutoenergy_progress
09/12/2025HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
04/14/2025Fire-Resistance Rated ConstructionMAHDAD SANIEEprogress
04/14/2025Fire-Resistant Penetrations and JointsTyrone Wellsspecial
04/14/2025FinalMAHDAD SANIEEprogress
12/11/2023Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
12/11/2023Post-installed AnchorsKarol Zdancewiczspecial
08/26/2022FinalKATHLEEN VOGELSANGprogress
02/14/2022Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
02/09/2022FinalDelbert Smithprogress
02/09/2022Mechanical SystemsDelbert Smithspecial
Latest 25 of 38.
▾Documents — 554 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch24
09/02/2026M00645756-S2Request digital key ↗
09/02/2026M00645756-P1Request digital key ↗
09/01/2026M07994033-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00229113-I1Request digital key ↗
08/15/2026M00229113-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00229126-I1Request digital key ↗
▸Applications & Permits100
▸BISPLAN / WORK APPROVAL APPLICATION49
07/30/2021123706007Open ↗
02/03/2021123524061Open ↗
01/12/2021123808139Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION32
03/16/2020123817067Open ↗
12/31/2019123746697Open ↗
12/31/2019123524061Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWLPC Approval/Permit17
09/02/2026M00645756-S2Open ↗
09/02/2026M00645756-P1Open ↗
08/21/2026M01286413-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/31/2021123746697Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
10/20/2020123746697Open ↗
▸Seals & Professional Certifications124
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
03/02/2020123817067Open ↗
03/02/2020123817067Open ↗
03/02/2020123817067Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/05/2026M00229126-I1Open ↗
09/02/2026M00645756-P1Open ↗
09/02/2026M00645756-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M00974853-I1Open ↗
09/23/2026M00974853-I1Open ↗
09/23/2026M01286413-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026M01210200-S2Open ↗
09/23/2026M01286413-S1Open ↗
09/23/2026M01286413-S1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
07/22/2019140860343Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/22/2019140860343Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
07/22/2019140860343Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment47
▸BISEQUIPMENT USE APPLICATION/PERMIT20
03/01/2021123524061Open ↗
03/01/2021123524061Open ↗
03/01/2021123524061Open ↗
Showing 3 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS14
03/01/2021123524061Open ↗
03/01/2021123524061Open ↗
03/01/2021123524061Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
08/26/2019123524061Open ↗
07/09/2019123524061Open ↗
07/01/2019123808139Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
07/30/2021123706007Open ↗
01/12/2021123808139Open ↗
01/11/2021123808139Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection15
▸BISTenant Protection Plan and Notes10
03/02/2020123817067Open ↗
10/03/2019123746697Open ↗
05/01/2019123706007Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00229126-I1Open ↗
08/13/2026M00229113-P1Open ↗
08/13/2026M00229113-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
03/18/2019123706007Open ↗
12/19/2018123125411Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00229126-I1Open ↗
09/01/2026M07994033-I1Open ↗
08/21/2026M01286413-P1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
03/02/2020123817067Open ↗
10/02/2019123746697Open ↗
07/22/2019123808139Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/02/2026M00645756-S2Open ↗
08/15/2026M00645756-S1Open ↗
08/15/2026M00645756-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/19/2019123524061Open ↗
Showing 1 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/26/2021123524061Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/26/2021123524061Open ↗
09/18/2020123746697Open ↗
Showing 2 of 3 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE3
03/18/2019123706007Open ↗
Showing 1 of 3 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY14
04/06/2022123706007Open ↗
04/06/2022123706007Open ↗
04/06/2022123706007Open ↗
Showing 3 of 14 on file for this type
▸BISMASONRY1
09/18/2020123746697Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs68
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
04/06/2022123706007Open ↗
04/09/2021123746697Open ↗
03/30/2021123808139Open ↗
Showing 3 of 25 on file for this type
▸BISLANDMARKS APPROVAL20
10/27/2020123746697Open ↗
03/02/2020123817067Open ↗
10/03/2019123746697Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
03/30/2021123808139Open ↗
03/30/2021123817067Open ↗
Showing 2 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter4
09/02/2026M00645756-S2Open ↗
08/15/2026M00645756-S1Open ↗
08/15/2026M00645756-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
04/06/2022123706007Open ↗
03/30/2021123808139Open ↗
03/30/2021123817067Open ↗
▸BISFINAL2
03/30/2021123808139Open ↗
03/30/2021123817067Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M00914355-I1Open ↗
▸Cost, Insurance & Ownership32
▸BISCOST AFFIDAVIT28
04/05/2022123706007Open ↗
03/31/2021123746697Open ↗
02/26/2021123524061Open ↗
Showing 3 of 28 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/30/2021123808139Open ↗
03/30/2021123817067Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
03/16/2020123817067Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/31/2021123746697Open ↗
▸Filing & Intake Forms52
▸BISADDITIONAL INFORMATION17
08/06/2021123706007Open ↗
02/05/2021123808139Open ↗
02/05/2021123808139Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET16
03/02/2020123817067Open ↗
10/03/2019123746697Open ↗
07/01/2019123808139Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM13
08/26/2019123524061Open ↗
07/09/2019123524061Open ↗
07/08/2019123524061Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
07/22/2019140860343Open ↗
Showing 1 of 6 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building4
08/15/2026M00645756-I1Open ↗
08/13/2026M07994033-I1Open ↗
08/13/2026M01210200-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations2
08/13/2026M00974853-I1Open ↗
08/13/2026M01211550-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M00974853-I1Open ↗
08/13/2026M01211550-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
03/18/2019123706007Open ↗
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type