← Back
BuildNYC
Other college and university
RH. Keating Hall
635 EAST FORDHAM ROAD · Belmont · BIN 2102036
💬 Discuss this project
1922Year Built
6Stories
W6Building Class
R6Zoning
1,743,584 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active Violations
Other college and university · Owner of record: Fordham University · 3,392,065 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFordham University19p · 3 filings · 9 docs
Floor 20Fordham University1p · 1 filing · 3 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
BasementFordham UniversityUnder Construction3p · 1 filing · 15 docs
Sub-BasementFordham UniversityUnder Construction11p · 1 filing · 15 docs
Site & exteriorFordham University14p · 5 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fordham University2210/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution603/21/2026
Nyccode403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LemxScaffold704/09/2026
Brosna ConstructionGeneral Contractor410/07/2026
Preserv BLD Restoration ManagementScaffold307/08/2026
Preserv BLD Restoration ManagementGeneral Contractor207/08/2026
Hudson Plumbing & MCHPlumbing108/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cole Technologies/Control1290307/30/2026
Tectonic Engineering Cons106209/25/2025
Building Lifecycle
All (47)Filed (12)Permit Issued (14)Signed Off (8)Special Inspection (13)
10/06/2026
Permit issued — General Construction
X01414957-I1-GC
10/06/2026
Permit issued — Mechanical Systems
X01414957-S1-MS
08/27/2026
Permit issued — Plumbing
X01414957-S2-PL
08/07/2026
Permit issued — General Construction
X01414957-I1-GC
08/07/2026
Permit issued — Mechanical Systems
X01414957-S1-MS
07/30/2026
Filed — Alteration
Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed herewith. No change of use, egress and occupancy.
X01414957-I1
07/30/2026
Filed — Alteration
Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed herewith. No change of use, egress and occupancy.
X01414957-S2
07/30/2026
Filed — Alteration
Mechanical work associated with Keating Hall Veterans Center Renovation, including REROUTE EXISTING DUCTWORK AND DAMPERS as shown on plans filed herewith. No change of use, egress and occupancy.
X01414957-S1
07/15/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01291154-I1
06/24/2026
Signed off — Alteration
Keating Hall, Roof repair PHASE 2- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installation of a new perimeter guardrail. No change of use, egress and occupancy.
X01256105-I1
06/18/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Maintenance information
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Interior lighting power
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE ANDERSEN
06/18/2026
Special inspection requirement — Lighting controls
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Post-installed Anchors
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Final
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Final
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE ANDERSEN
06/10/2026
Special inspection requirement — Mechanical Systems
GEORGE ANDERSEN
05/01/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01285503-I1
11/21/2025
Permit issued — General Construction
X01256105-I1-GC
09/29/2025
Permit issued — Protection and Mechanical Methods
X01291154-I1-PMM
09/25/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01291154-I1
09/25/2025
Filed — Alteration
Keating Hall, Roof repair PHASE 2- removal and replacement of the roofing membranes/components above the existing roof deck down to the existing concrete deck and installation of a new perimeter guardrail. No change of use, egress and occupancy.
X01256105-I1
09/19/2025
Permit issued — Supported Scaffold
X01285503-I1-SF
09/18/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01285503-I1
07/22/2025
Signed off — Alteration
X01086317-I1
05/16/2025
Signed off — Alteration
X01106483-I1
05/05/2025
Signed off — Alteration
X01170025-I1
05/05/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01193930-I1
04/30/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X01113087-I1
03/19/2025
Permit issued — Protection and Mechanical Methods
X01193930-I1-PMM
03/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01193930-I1
02/06/2025
Permit issued — Supported Scaffold
X01170025-I1-SF
02/05/2025
Filed — Alteration
X01170025-I1
11/19/2024
Permit issued — General Construction
X01106483-I1-GC
10/28/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X01113087-P1
09/26/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
X01113087-I1
09/26/2024
Permit issued — Sidewalk Shed
X01113087-I1-SH
09/26/2024
Permit issued — Sidewalk Shed
X01113087-I1-SF
09/25/2024
Filed — Alteration
X01106483-I1
08/13/2024
Permit issued — Suspended Scaffold
X01086317-I1-SC
07/31/2024
Filed — Alteration
X01086317-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBrosna Construction10/06/2026
DOB NOWMechanical SystemsPermit IssuedBrosna Construction10/06/2026
DOB NOWPlumbingPermit IssuedHudson Plumbing & MCH08/27/2026
DOB NOWGeneral ConstructionPermit IssuedBrosna Construction08/07/2026
DOB NOWMechanical SystemsPermit IssuedBrosna Construction08/07/2026
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management11/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management09/29/2025
DOB NOWSupported ScaffoldSigned-offLemx09/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offPreserv BLD Restoration Management03/19/2025
DOB NOWSupported ScaffoldSigned-offPreserv BLD Restoration Management02/06/2025
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management11/19/2024
DOB NOWSidewalk ShedSigned-offLemx09/26/2024
DOB NOWSidewalk ShedSigned-offLemx09/26/2024
DOB NOWSuspended ScaffoldPermit IssuedJepol Construction08/13/2024
3 projects · most recent 02/09/2026
FiledStatusContractorScope
02/09/2026Permit IssuedE-J Electric Installation Co—
09/26/2024CompleteRichard Neu—
04/05/2021Permit IssuedCaputek Electrical Services—
1 project · most recent 09/18/2025
Scaffold
FiledStatusContractorScope
09/18/2025Signed-offLemxScaffold
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
06/18/2026Energy Code Compliance InspectionsGEORGE ANDERSENprogress
06/18/2026Duct leakage testing, insulation and designGEORGE ANDERSENenergy_progress
06/18/2026Maintenance informationGEORGE ANDERSENenergy_progress
06/18/2026Interior lighting powerGEORGE ANDERSENenergy_progress
06/18/2026HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
06/18/2026Lighting controlsGEORGE ANDERSENenergy_progress
06/10/2026Post-installed AnchorsGEORGE ANDERSENspecial
06/10/2026FinalGEORGE ANDERSENprogress
06/10/2026Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
06/10/2026Mastic and Intumescent Fire-resistant CoatingsGEORGE ANDERSENspecial
06/10/2026FinalGEORGE ANDERSENprogress
06/10/2026Energy Code Compliance InspectionsGEORGE ANDERSENprogress
06/10/2026Mechanical SystemsGEORGE ANDERSENspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fordham UniversityEducationEntire building
Project X01414957 Alteration · Permit Entire · 07/30/2026
Project X01256105 Alteration · LOC Issued · 09/25/2025
Project X01291154 Alteration · LOC Issued · 09/25/2025
Project X01285503 Alteration · LOC Issued · 09/18/2025
Project X01193930 Alteration · LOC Issued · 03/17/2025
Project X01170025 Alteration · LOC Issued · 02/05/2025
Project X01113087 Alteration · LOC Issued · 09/26/2024
Project X01106483 Alteration · LOC Issued · 09/25/2024
Project X01086317 Alteration · LOC Issued · 07/31/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026X01086317-I1Request digital key ↗
08/20/2026X01106483-I1Request digital key ↗
08/20/2026X01113087-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
02/24/2014220328759Open ↗
11/22/2013220328759Open ↗
11/20/2013220328759Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026X01113087-I1Open ↗
08/20/2026X01170025-I1Open ↗
08/18/2026X01285503-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X01414957-S1Open ↗
09/01/2026X01414957-S1Open ↗
08/23/2026X01414957-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
10/08/2026X01414957-S2Open ↗
09/01/2026X01414957-S1Open ↗
08/23/2026X01414957-I1Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
11/14/2016220328759Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026X01414957-S2Open ↗
08/16/2026X01414957-S1Open ↗
08/16/2026X01414957-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026X01106483-I1Open ↗
08/13/2026X01256105-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/05/2013220328759Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/20/2026X01113087-I1Open ↗
08/20/2026X01170025-I1Open ↗
08/16/2026X01414957-S1Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/17/2016220328759Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X01106483-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/17/2016220328759Open ↗
08/05/2013220328759Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/05/2013220328759Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026X01086317-I1Open ↗