637 MADISON AVENUE
MANHATTAN · BIN 1040754
💬 Discuss this project
1958Year Built
19Stories
O6Building Class
C5-3Zoning
149,881 sfGross Floor Area
33Units
LL97 Covered1 Open Violation 0 unresolved · 1 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 635 MADISON FEE PROPERTY OWNER LLC · 9,087 sf lot · 16.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 4 docs
Floor 1721p · 2 filings · 9 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 1216p · 4 filings · 17 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 617p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 34p · 3 filings · 13 docs
Floor 219p · 5 filings · 20 docs
Floor 19p · 3 filings · 16 docs
Cellar3p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IRONWOOOD REALTY27907/08/2026
PACE ENGINEERING P.C.307/08/2026
JJS BUILDERS507/08/2026
HGC PARTNERS3307/08/2026
635 MADISON FEE PROPERTY OWNER LLC103/22/2026
TECTONIC BUILDERS203/22/2026
MADISON FEE OWNER LLC C/O103/22/2026
635 MADISON FEE OWNER LLC303/22/2026
TECRONIC BUILDERS INC103/22/2026
WESTLAND MANAGEMENT CORP303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2018$153.0M—635 MADISON FEE OWNER LLC → 635 MADISON FEE PROPERTY OWNER LLC$1,021/sf building
09/11/2014$145.0M—635 MADISON OWNER LLC → 635 MADISON FEE OWNER LLC$967/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MK CONSTRUCTION GROUPGeneral Contractor1407/08/2026
TECTONIC BUILDERS INCGeneral Contractor1307/08/2026
QUINTEROS CONSTRUCTION OFGeneral Contractor303/21/2026
KENNEDY, DANIELElectrical303/21/2026
ANSHELEWITZ, ALVINElectrical303/21/2026
FOLOR INCGeneral Contractor307/08/2026
ART + 1, INCGeneral Contractor204/09/2026
MNK ENTERPRISES LLCGeneral Contractor207/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection207/08/2026
A PLUS PLUMBING CORPPlumbing207/08/2026
AP PLUMBING & HVAC LLCPlumbing207/08/2026
PRACTICAL PLBG & HTG INCFire Protection107/08/2026
SKINNER PLMNG & HTG CORPFire Protection109/03/2026
A&A PLUMBING CORPPlumbing107/08/2026
PRACTICAL PLBG & HTG INCPlumbing107/08/2026
MAUCERI SIGNScaffold107/08/2026
ABDUL AZIZElectrical103/21/2026
NATIONAL MAINTENANCEScaffold107/08/2026
AZIZ ABDULElectrical103/21/2026
BRONXDALE ELECTRIC INCElectrical103/22/2026
DEGENNARO III, CHARLESElectrical103/21/2026
DEO SINGHElectrical103/21/2026
JEFFERSON NECKLESElectrical103/21/2026
O'CONNOR, MOXIEElectrical103/21/2026
PAUL BOCCIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974208/10/2026
HT ENGINEERING, PLLC6274303/24/2026
HANSEN ENGINEERING PC8174109/30/2025
GILSANZ MURRAY STEFICEK240109/01/2022
R.J. MCGEE ENGINEERING, P7878412/23/2021
CODEGREEN510306/30/2021
AK ENGINEERING PC678101/26/2021
SY ENGINEERING PLLC5149411/10/2020
Building Lifecycle
All (184)Filed (32)Permit Issued (31)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (8)Special Inspection (30)
09/02/2026
Permit issued — Sprinklers
M01439311-I1-EW-SP
08/10/2026
Filed — Alteration
INSTALLATION OF SPECIAL FIRE BOOSTER PUMP AND JOCKEY PUMP INSTALLATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01439311-I1
07/31/2026
Special inspection requirement — Sprinkler Systems
Vincent Liotta
05/14/2026
Permit issued — Mechanical Systems
M01367436-I1-MS
03/24/2026
Filed — Alteration
Replace existing condensing unit in kind
M01367436-I1
03/04/2026
Special inspection requirement — Final
HENRY TORRES
03/04/2026
Special inspection requirement — Post-installed Anchors
HENRY TORRES
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HENRY TORRES
03/04/2026
Special inspection requirement — Mechanical Systems
HENRY TORRES
10/29/2025
Permit issued — Mechanical Systems
M01257008-I1-MS
09/30/2025
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01257008-I1
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
08/26/2025
Special inspection requirement — Post-installed Anchors
Ryan Hansen
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
07/22/2025
Special inspection requirement — Maintenance information
Ryan Hansen
07/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
07/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
Ryan Hansen
07/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
07/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
07/16/2025
Special inspection requirement — Mechanical Systems
Ryan Hansen
07/16/2025
Special inspection requirement — Final
Ryan Hansen
07/07/2025
Signed off — Alteration
TEMPORARY SPRINKLER SYSTEM FOR 006 FLOOR. TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF).
M00516055-I1
03/13/2025
Permit issued — General Construction
M01188092-I1-GC
03/06/2025
Filed — Alteration
HEREBY FILING FOR INTERIOR DEMOLITION/RENOVATION OF COMMERCIAL SPACE. NO CHANGE IN USE OCCUPANCY, OR EGRESS.
M01188092-I1
01/11/2024
Permit issued — Mechanical Systems
M00494598-S2-MS
02/16/2023
Signed off — Alteration
Plumbing work on the 17th floor (Hermes) as indicated on drawings.
M00431152-I1
01/03/2023
Permit issued — Mechanical Systems
M00494598-S2-MS
09/20/2022
Filed — Alteration
M00776458-I1
09/20/2022
Filed — Alteration
Mechanical changes on the 2nd and 3rd Floors as indicated on drawings.
M00776416-I1
09/09/2022
Filed — Alteration CO
M00767388-I1
09/07/2022
Special inspection requirement — Lighting controls
HENRY TORRES
09/07/2022
Special inspection requirement — Interior lighting power
HENRY TORRES
09/01/2022
Filed — Alteration
Structural changes (convenience stair installation) between the 2nd & 3rd Floor as indicated on drawings.
M00776477-I1
07/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
HENRY TORRES
07/18/2022
Special inspection requirement — Duct leakage testing, insulation and design
HENRY TORRES
07/18/2022
Special inspection requirement — Maintenance information
HENRY TORRES
07/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HENRY TORRES
07/18/2022
Special inspection requirement — Final
07/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
HENRY TORRES
07/18/2022
Special inspection requirement — Structural Steel - Welding
Philip Murray
07/18/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Philip Murray
07/18/2022
Special inspection requirement — Mechanical Systems
HENRY TORRES
07/18/2022
Special inspection requirement — Structural Steel - Details
Philip Murray
07/18/2022
Special inspection requirement — Sprayed fire-resistant materials
Philip Murray
07/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
HENRY TORRES
07/18/2022
Special inspection requirement — Shutoff dampers
HENRY TORRES
06/30/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY 72' HIGH PIPE SCAFFOLD ORIGINATING (OFF 8TH FLOOR) FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00307221-I1
06/29/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00296583-I1
03/23/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/21/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/25/2022
Signed off — Alteration
TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF) TO INCLUDE CONSTRUCTION OF NON-LOADBEARING INTERIOR PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, FIRE ALARMAND FINISHES.NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00494598-I1
01/07/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2022
Permit issued — Sprinklers
M00516772-I1-EW-SP
01/04/2022
Permit issued — General Construction
M00494598-I1-GC
01/04/2022
Permit issued — Mechanical Systems
M00494598-S2-MS
01/03/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2021
Filed — Alteration
TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF) TO INCLUDE CONSTRUCTION OF NON-LOADBEARING INTERIOR PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, FIRE ALARMAND FINISHES.NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00516772-P1
12/23/2021
Filed — Alteration
TENANT FIT OUT OF THE 6TH FLOOR COMMERCIAL SPACE (7,763 SF) TO INCLUDE CONSTRUCTION OF NON-LOADBEARING INTERIOR PARTITIONS AND DOORS, MECHANICAL, ELECTRICAL, PLUMBING, SPRINKLER, FIRE ALARMAND FINISHES.NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00494598-P1
12/06/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedSKINNER PLMNG & HTG CORP09/02/2026
DOB NOWMechanical SystemsSigned-offTECTONIC BUILDERS INC05/14/2026
DOB NOWMechanical SystemsPermit IssuedART + 1, INC10/29/2025
DOB NOWGeneral ConstructionPermit IssuedART + 1, INC03/13/2025
DOB NOWMechanical SystemsPermit IssuedMK CONSTRUCTION GROUP01/11/2024
DOB NOWMechanical SystemsPermit IssuedMK CONSTRUCTION GROUP01/03/2023
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP01/05/2022
DOB NOWGeneral ConstructionSigned-offMK CONSTRUCTION GROUP01/04/2022
DOB NOWMechanical SystemsPermit IssuedMK CONSTRUCTION GROUP01/04/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/30/2021
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP08/25/2021
DOB NOWSprinklersPermit IssuedA + SPRINKLER CORP07/14/2021
DOB NOWGeneral ConstructionPermit IssuedTECTONIC BUILDERS INC07/14/2021
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP07/14/2021
DOB NOWMechanical SystemsPermit IssuedTECTONIC BUILDERS INC07/13/2021
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG06/29/2021
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP06/29/2021
DOB NOWMechanical SystemsPermit IssuedMK CONSTRUCTION GROUP05/17/2021
DOB NOWGeneral ConstructionSigned-offMK CONSTRUCTION GROUP05/12/2021
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC03/01/2021
DOB NOWPlumbingSigned-offA&A PLUMBING CORP02/18/2021
DOB NOWGeneral ConstructionPermit IssuedFOLOR INC02/01/2021
DOB NOWMechanical SystemsPermit IssuedFOLOR INC01/29/2021
DOB NOWMechanical SystemsSigned-offTECTONIC BUILDERS INC11/17/2020
DOB NOWSprinklersSigned-offPRACTICAL PLBG & HTG INC11/17/2020
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC11/12/2020
DOB NOWConstruction FenceSigned-offTECTONIC BUILDERS INC10/21/2020
DOB NOWMechanical SystemsSigned-offQUINTEROS CONSTRUCTION OF02/20/2020
DOB NOWSupported ScaffoldSigned-offMNK ENTERPRISES LLC02/04/2020
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC01/16/2020
DOB NOWSignSigned-offMAUCERI SIGN CO., INC05/31/2019
BISOTISSUEDTECTONIC BUILDERS INC12/05/2020
BISOTISSUEDTECTONIC BUILDERS INC11/12/2020
BISOTISSUEDINIFINITY MANAGEMENT CORP07/21/2020
BISOTISSUEDALFA CONSTRUCTION CORP06/29/2020
BISOTISSUEDINIFINITY MANAGEMENT CORP02/14/2020
BISOTISSUEDKEY RESTORATION CORP02/14/2020
BISSPISSUEDRRP PLUMBING CORP01/28/2020
BISOTISSUEDALFA CONSTRUCTION CORP05/28/2019
BISMHISSUEDKSW MECHANICAL,LLC05/20/2019
+ 41 more permits on file
4 projects · most recent 03/24/2026
Air Conditioning Systems Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
03/24/2026Signed-offTECTONIC BUILDERS INCAir Conditioning Systems
Cooling
Lg ARUM241BTE5 20 tons · Vrf Outdoor ×1
09/30/2025Permit IssuedART + 1, INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM 60,000 BTU · Condensing Unit ×6
PVFY-P48NAMU-E1 54,000 BTU · Vrf Indoor ×3
PVFY-P24NAMU-E1 27,000 BTU · Vrf Indoor ×2
PVFY-P30NAMU-E1 34,000 BTU · Vrf Indoor ×2
PVFY-P36NAMU-E1 40,000 BTU · Vrf Indoor ×1
PVFY-P54NAMU-E1 60,000 BTU · Vrf Indoor ×1
TPEP036OA140A 21,000 BTU · Vrf Indoor ×1
09/20/2022——Air Conditioning Systems
Cooling
Mitsubishi Electric PURY-EP216TNU-A 432,000 BTU · Vrf Outdoor ×2
12/23/2021Permit IssuedMK CONSTRUCTION GROUPOthers
Other
United Cool Air VA20G3AHA 2,000 BTU · Condensing Unit ×4
3 projects · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026Permit IssuedSKINNER PLMNG & HTG CORP—
12/23/2021Signed-offCROSSFIELD PLBG.&HTG.CORP—
06/30/2021Permit IssuedA + SPRINKLER CORP—
3 projects · most recent 08/10/2026
Water/Sanitary
FiledStatusContractorScope
08/10/2026———
06/30/2021Signed-offA PLUS PLUMBING CORPWater/Sanitary
05/11/2020——Water/Sanitary
11 projects · most recent 02/13/2023
General Wiring
FiledStatusContractorScope
02/13/2023Permit IssuedBRUNI ELECTRIC INCGeneral Wiring
07/30/2021CompleteWEBSITE ELECTRIC CORP.General Wiring
06/17/2021Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
06/16/2021Permit IssuedE & M ELECTRICAL NY CORP—
04/29/2021CompleteBRONXDALE ELECTRIC INCGeneral Wiring
03/04/2020Permit IssuedLIT MODE ELECL CONTG INC—
01/14/2020Permit IssuedRICHARD NEU—
12/28/2019CompleteSTEVEN FARKAS—
07/10/2019CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
04/09/2019CompleteGOWNA ELECTRIC INCGeneral Wiring
12/17/2018CompletePRINCIPAL ELECTRICAL CORPGeneral Wiring
1 project · most recent 09/01/2022
Steel
FiledStatusContractorScope
09/01/2022——Steel
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/07/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/03/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/16/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
07/31/2026Sprinkler SystemsVincent Liottaspecial
03/04/2026Post-installed AnchorsHENRY TORRESspecial
03/04/2026Mechanical SystemsHENRY TORRESspecial
03/04/2026FinalHENRY TORRESprogress
03/04/2026Fire-Resistant Penetrations and JointsHENRY TORRESspecial
08/26/2025Post-installed AnchorsRyan Hansenspecial
08/26/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
08/26/2025Energy Code Compliance InspectionsRyan Hansenprogress
07/22/2025HVAC-R and service water heating system controlsRyan Hansenenergy_progress
07/22/2025Maintenance informationRyan Hansenenergy_progress
07/22/2025HVAC-R and service water heating equipmentRyan Hansenenergy_progress
07/22/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
07/22/2025Duct leakage testing, insulation and designRyan Hansenenergy_progress
07/16/2025FinalRyan Hansenprogress
07/16/2025Mechanical SystemsRyan Hansenspecial
09/07/2022Lighting controlsHENRY TORRESenergy_progress
09/07/2022Interior lighting powerHENRY TORRESenergy_progress
07/18/2022Fire-Resistant Penetrations and JointsHENRY TORRESspecial
07/18/2022HVAC-R and service water heating system controlsHENRY TORRESenergy_progress
07/18/2022Duct leakage testing, insulation and designHENRY TORRESenergy_progress
07/18/2022FinalHENRY TORRESprogress
07/18/2022Post-installed AnchorsHENRY TORRESspecial
07/18/2022Mechanical SystemsHENRY TORRESspecial
07/18/2022Sprayed fire-resistant materialsPhilip Murrayspecial
07/18/2022Structural Steel - DetailsPhilip Murrayspecial
Latest 25 of 74.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Suit SupplyRetailFloors 1–3
Project M01257008 Alteration · Permit Entire · 09/30/2025
Project M01188092 Alteration · Permit Entire · 03/06/2025
Project M00776477 Alteration · Approved · 09/01/2022
Manhattan Center for Vaginal SurgeryMedical / HealthcareFloor 12
Project M00528703 Alteration · Permit Entire · 06/30/2021
Viva EveMedical / HealthcareFloor 6
Project M00516055 Alteration · LOC Issued · 05/10/2021
Project M00516772 Alteration · Permit Entire · 05/10/2021
Project M00494598 Alteration · Permit Entire · 04/30/2021
MontblancRetailGround
Project M00452648 Alteration · Permit Entire · 01/28/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,300 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch17
09/03/2026M00516055-I1Request digital key ↗
09/03/2026M00516772-P1Request digital key ↗
09/03/2026M00516772-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00295627-I1Request digital key ↗
09/04/2026M00420023-I1Request digital key ↗
09/04/2026M00431146-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00343701-I1Request digital key ↗
09/04/2026M00420416-I1Request digital key ↗
09/04/2026M00431152-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00170424-I1Request digital key ↗
09/04/2026M00452648-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00413073-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00296583-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00307221-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00420169-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00451483-I1Request digital key ↗
▸Applications & Permits214
▸BISPLAN / WORK APPROVAL APPLICATION108
12/04/2020140986690Open ↗
11/10/2020140977012Open ↗
05/11/2020140901585Open ↗
Showing 3 of 108 on file for this type
▸BISWORK PERMIT APPLICATION103
12/05/2020140986690Open ↗
11/12/2020140977012Open ↗
07/21/2020140901585Open ↗
Showing 3 of 103 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/05/2020140986690Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/05/2020140986690Open ↗
▸Seals & Professional Certifications380
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION137
03/02/2020120258586Open ↗
03/02/2020120258586Open ↗
03/02/2020120258586Open ↗
Showing 3 of 137 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT46
12/04/2020140986690Open ↗
11/10/2020140977012Open ↗
05/11/2020140901585Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
09/28/2026M01367436-I1Open ↗
09/23/2026M01257008-I1Open ↗
09/23/2026M01257008-I1Open ↗
Showing 3 of 38 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/05/2026M00170424-I1Open ↗
09/04/2026M00413073-I1Open ↗
09/04/2026M00420169-I1Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY26
12/04/2020140986690Open ↗
11/10/2020140977012Open ↗
05/11/2020140901585Open ↗
Showing 3 of 26 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION26
12/04/2020140986690Open ↗
11/10/2020140977012Open ↗
05/11/2020140901585Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/28/2026M01367436-I1Open ↗
09/23/2026M01257008-I1Open ↗
09/01/2026M00494598-S2Open ↗
Showing 3 of 15 on file for this type
▸Trade Schedules & Equipment94
▸BISSCHEDULE B - PLUMBING33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSELF-CERT PLUMBING NOTICE21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS9
07/30/2019140842603Open ↗
07/30/2019140842603Open ↗
07/30/2019140842603Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
07/16/2019140842603Open ↗
Showing 1 of 9 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISDS1-Demolition Submittal Certification Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00307221-I1Open ↗
08/13/2026M00296583-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos102
▸BISASBESTOS: CERTIFICATION (DEP ACP5)59
12/04/2020140986690Open ↗
11/10/2020140977012Open ↗
05/11/2020140901585Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/05/2026M00170424-I1Open ↗
09/04/2026M00420169-I1Open ↗
09/04/2026M00420023-I1Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/11/2020140901585Open ↗
▸Energy Compliance95
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
10/24/2019123596475Open ↗
10/24/2019123596475Open ↗
09/11/2019140407094Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY27
11/30/2021140977012Open ↗
08/09/2021140986690Open ↗
02/22/2021140884540Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS19
12/04/2020140986690Open ↗
11/10/2020140977012Open ↗
05/11/2020140901585Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
11/30/2021140977012Open ↗
08/10/2021140977012Open ↗
08/09/2021140986690Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/05/2020140986690Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY41
11/30/2021140977012Open ↗
11/30/2021140977012Open ↗
11/29/2021140977012Open ↗
Showing 3 of 41 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs97
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST45
08/09/2021140986690Open ↗
02/22/2021140884540Open ↗
03/05/2020121716081Open ↗
Showing 3 of 45 on file for this type
▸BISADMINISTRATIVE OBJECTIONS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
12/31/2019140841034Open ↗
09/11/2019140765955Open ↗
09/11/2019140780073Open ↗
Showing 3 of 17 on file for this type
▸BISSUPERSEDING LETTER6
02/19/2020120258586Open ↗
Showing 1 of 6 on file for this type
▸BISFINAL1
11/12/2020140977012Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership120
▸BISCOST AFFIDAVIT120
11/30/2021140977012Open ↗
08/10/2021140977012Open ↗
08/09/2021140986690Open ↗
Showing 3 of 120 on file for this type
▸Filing & Intake Forms118
▸BISEFILING COVER SHEET51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET27
12/04/2020140986690Open ↗
11/10/2020140977012Open ↗
05/11/2020140901585Open ↗
Showing 3 of 27 on file for this type
▸BISBOROUGH INTAKE FORM20
03/05/2020121716081Open ↗
03/04/2020140884540Open ↗
03/02/2020120258586Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION20
03/11/2020140884540Open ↗
03/04/2020140884540Open ↗
Showing 2 of 20 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type