Primarily 1 family with 1 store or office
636 LORIMER STREET
BROOKLYN · BIN 3068370
💬 Discuss this project
1920Year Built
3Stories
S1Building Class
R6BZoning
2,520 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: 636 LORIMER CONDOMINIUM, LLC · 2,500 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 1 filing · 20 docs
Floor 4Under Construction24p · 1 filing · 20 docs
Floor 3Under Construction26p · 1 filing · 20 docs
Floor 2Under Construction25p · 1 filing · 20 docs
Floor 1Under Construction24p · 1 filing · 20 docs
CellarUnder Construction43p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A+ CHOICE CONSTRUCTION804/09/2026
DIMENSION GROUP803/22/2026
THE DIMENSION GROUP LLC 1103/22/2026
GROUP LLC THE DIMENSION203/22/2026
389 NOSTRAND AVE103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2023$2.3M—Private party → 636 LORIMER CONDOMINIUM, LLC$899/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
INFOCUS DESIGN AND PLANNING PC1403/21/2026
NYC BUILDING SOLUTIONS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE DIMENSION GROUP LLCGeneral Contractor1807/08/2026
NYC BUILDING SOLUTIONS COGeneral Contractor607/08/2026
A+ CHOICE CONSTRUCTION INGeneral Contractor404/09/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA74151510/09/2025
WORLD DESIGN ARCHITECTURE9323508/06/2025
CITISCAPE CONSULTING LTD762109/01/2023
Building Lifecycle
All (186)Filed (23)Permit Issued (22)Signed Off (9)Violation (11)Inspection (11)Objection (80)Special Inspection (30)
10/28/2025
Special inspection requirement — Fenestration areas
William Alicea
10/28/2025
Special inspection requirement — Interior lighting power
William Alicea
10/28/2025
Special inspection requirement — Metering
William Alicea
10/28/2025
Special inspection requirement — Lighting controls
William Alicea
10/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
10/28/2025
Special inspection requirement — Insulation placement and R values
William Alicea
10/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
10/28/2025
Special inspection requirement — Protection of exposed foundation insulation
William Alicea
10/28/2025
Special inspection requirement — Maintenance information
William Alicea
10/28/2025
Special inspection requirement — Concrete - Precast
DOYUN KIM
10/28/2025
Special inspection requirement — Air barrier - visual inspection
William Alicea
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
10/28/2025
Special inspection requirement — Lighting in dwelling units
William Alicea
10/28/2025
Special inspection requirement — Masonry
DOYUN KIM
10/28/2025
Special inspection requirement — Preliminary
DOYUN KIM
10/28/2025
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
10/28/2025
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
10/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
10/28/2025
Special inspection requirement — Exterior lighting power
William Alicea
10/28/2025
Special inspection requirement — Fenestration air leakage
William Alicea
10/09/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-A4
10/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
10/09/2025
Special inspection requirement — Preliminary
DOYUN KIM
10/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
10/09/2025
Special inspection requirement — Metering
William Alicea
10/09/2025
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
10/09/2025
Special inspection requirement — Concrete - Precast
DOYUN KIM
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
10/09/2025
Special inspection requirement — Masonry
DOYUN KIM
10/09/2025
Special inspection requirement — Fenestration areas
William Alicea
10/08/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-S6
10/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2025
Objection raised — Admin
08/11/2025
Objection resolved — Addressed
08/06/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-A3
07/31/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Zoning
07/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-A2
06/27/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
06/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-S3
06/03/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
05/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/24/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
04/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/04/2025
Objection resolved — Addressed
04/01/2025
Objection raised — Scope
03/31/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-A1
03/31/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01024790-I1
03/14/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-S7
03/14/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-S1
01/27/2025
Permit issued — Sidewalk Shed
B01024790-I1-SH
01/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/15/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-S2
01/15/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-S4
01/15/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Install temporary 8' construction fence.
B00887612-S5
01/13/2025
Permit issued — Support of Excavation
B00887612-S5-SE
Latest 60 of 186 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offA+ CHOICE CONSTRUCTION IN01/27/2025
DOB NOWSupport of ExcavationSigned-offTHE DIMENSION GROUP LLC01/13/2025
DOB NOWStructuralSigned-offTHE DIMENSION GROUP LLC01/13/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL11/18/2024
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC11/07/2024
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC10/30/2024
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC10/30/2024
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO10/23/2024
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO10/10/2024
DOB NOWSupported ScaffoldSigned-offNYC BUILDING SOLUTIONS CO10/08/2024
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC08/29/2024
DOB NOWSprinklersSigned-offM & M PIPING AND HEATING08/15/2024
DOB NOWSidewalk ShedSigned-offA+ CHOICE CONSTRUCTION IN03/29/2024
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC11/16/2023
DOB NOWStructuralSigned-offTHE DIMENSION GROUP LLC11/13/2023
DOB NOWFoundationSigned-offTHE DIMENSION GROUP LLC11/13/2023
DOB NOWSupport of ExcavationSigned-offTHE DIMENSION GROUP LLC11/13/2023
DOB NOWFoundationPermit IssuedTHE DIMENSION GROUP LLC11/09/2023
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC11/02/2023
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO10/17/2023
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO10/03/2023
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO09/28/2023
1 project · most recent 10/09/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/09/2025Signed-offTHE DIMENSION GROUP LLCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MITSUBISHI - MXZ-5C42NA2-U1 37,500 BTU · Heat Pump Outdoor ×4
Heating
Mitsubishi Electric MITSUBISHI - MXZ-5C42NA2-U1 41,000 BTU ×4
1 project · most recent 10/09/2025
Sprinkler System
FiledStatusContractorScope
10/09/2025Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 10/09/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/09/2025Signed-offM & M PIPING AND HEATINGGas, Storm, Water/Sanitary
2 projects · most recent 07/12/2025
General Wiring
FiledStatusContractorScope
07/12/2025CancelledKENNETH FISK ELECTRIC CORGeneral Wiring
06/23/2025CompleteRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 10/09/2025
Steel Concrete Masonry
FiledStatusContractorScope
10/09/2025Signed-offTHE DIMENSION GROUP LLCSteel, Concrete, Masonry
1 project · most recent 10/09/2025
Fence
FiledStatusContractorScope
10/09/2025Signed-offTHE DIMENSION GROUP LLCFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/24/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
04/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/28/2025Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
10/28/2025Fenestration air leakageWilliam Aliceaenergy_progress
10/28/2025Exterior lighting powerWilliam Aliceaenergy_progress
10/28/2025Fire-Resistance Rated ConstructionDOYUN KIMprogress
10/28/2025Energy Code Compliance InspectionsDOYUN KIMprogress
10/28/2025PreliminaryDOYUN KIMprogress
10/28/2025Fire-Resistant Penetrations and JointsDOYUN KIMspecial
10/28/2025Concrete - PrecastDOYUN KIMspecial
10/28/2025Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
10/28/2025MasonryDOYUN KIMspecial
10/28/2025Concrete - Cast-In-PlaceDOYUN KIMspecial
10/28/2025Protection of exposed foundation insulationWilliam Aliceaenergy_progress
10/28/2025Interior lighting powerWilliam Aliceaenergy_progress
10/28/2025Maintenance informationWilliam Aliceaenergy_progress
10/28/2025MeteringWilliam Aliceaenergy_progress
10/28/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
10/28/2025Lighting controlsWilliam Aliceaenergy_progress
10/28/2025Insulation placement and R valuesWilliam Aliceaenergy_progress
10/28/2025Lighting in dwelling unitsWilliam Aliceaenergy_progress
10/28/2025Fenestration areasWilliam Aliceaenergy_progress
10/09/2025Lighting in dwelling unitsWilliam Aliceaenergy_progress
10/09/2025Insulation placement and R valuesWilliam Aliceaenergy_progress
10/09/2025Fenestration air leakageWilliam Aliceaenergy_progress
10/09/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
10/09/2025Maintenance informationWilliam Aliceaenergy_progress
Latest 25 of 150.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/26/2026B00887612-A4Request digital key ↗
08/26/2026B00887612-A3Request digital key ↗
08/26/2026B00887612-A2Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
08/06/2025340893135Open ↗
05/21/2025322121440Open ↗
04/29/2025340893135Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
08/14/2025340893135Open ↗
04/30/2025340893135Open ↗
07/06/2023340893135Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B00887612-A2Open ↗
08/13/2026B00887612-A4Open ↗
08/13/2026B00887612-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B00887612-A4Open ↗
08/13/2026B00887612-A2Open ↗
08/13/2026B00887612-P5Open ↗
Showing 3 of 6 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/09/2025322121440Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/09/2025322121440Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00887612-I1Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature28
09/12/2026B00887612-P5Open ↗
09/12/2026B00887612-P5Open ↗
09/12/2026B00887612-P5Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/26/2026B00887612-A4Open ↗
08/26/2026B00887612-A3Open ↗
08/26/2026B00887612-A2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/12/2026B00887612-P5Open ↗
09/02/2026B00887612-S6Open ↗
09/02/2026B00887612-S6Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/06/2023340893135Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/06/2023340893135Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026B00887612-P6Open ↗
08/13/2026B00887612-A4Open ↗
08/13/2026B00887612-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST3
08/14/2025340893135Open ↗
04/30/2025340893135Open ↗
07/06/2023340893135Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
07/06/2023340893135Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/06/2023340893135Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00887612-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00887612-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00887612-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
08/26/2026B00887612-S1Open ↗
08/26/2026B00887612-A4Open ↗
08/26/2026B00887612-A3Open ↗
Showing 3 of 20 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00887612-S6Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/09/2025340893135Open ↗
▸Filing & Intake Forms4
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/14/2025340893135Open ↗
▸BISEFILING COVER SHEET1
05/21/2025322121440Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/06/2023340893135Open ↗
▸BISADDITIONAL INFORMATION1
04/30/2025340893135Open ↗
▸Other Documents25
▸DOB NOWProperty Ownership Certification6
08/26/2026B00887612-A4Open ↗
08/26/2026B00887612-A2Open ↗
08/26/2026B00887612-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B00887612-P3Open ↗
08/13/2026B00887612-P6Open ↗
08/13/2026B00887612-A4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026B00887612-P5Open ↗
08/13/2026B00887612-P3Open ↗
08/13/2026B00887612-P6Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
07/09/2025322121440Open ↗
07/09/2025322121440Open ↗
07/09/2025322121440Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/09/2025322121440Open ↗
▸BISPLOT DIAGRAM1
07/09/2025322121440Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00887612-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00887612-S5Open ↗