← Back
Walk-up cooperative
Sun Garden Homes Association
637 41 STREET · BIN 3018052
💬 Discuss this project
1924Year Built
5Stories
C6Building Class
R6BZoning
51,200 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized26 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: UNAVAILABLE OWNER · 20,033 sf lot · 2.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof3p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 44p · 2 filings · 15 docs
Floor 3Under Construction1p · 1 filing · 5 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 4 docs
8 jobs · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026CompleteE & M ELECTRICAL NY CORP—
10/26/2025CompleteE & M ELECTRICAL NY CORPGeneral Wiring
01/29/2024Permit IssuedOPTIMAL ELECTRIC, INC—
11/28/2023CompleteDAVEN ELECTRIC CORP—
07/24/2023CompleteOPTIMAL ELECTRIC, INC—
12/05/2022CompleteBLAZE ELECTRIC INC.General Wiring
06/16/2022CancelledBOROWIDE ELECT'L CONTR'S—
02/16/2018CompleteCROSSLAND MANAGEMENT & E—
1 job · most recent 06/09/2022
Sidewalk Shed
FiledStatusContractorScope
06/09/2022Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
Building Lifecycle
All (170)Filed (18)Permit Issued (27)Signed Off (12)Violation (58)Inspection (12)Objection (13)Special Inspection (30)
08/25/2026
Permit issued — General Construction
B01420355-I1-GC
07/01/2026
Objection raised — Scope
07/01/2026
Objection raised — Fire_Protection
07/01/2026
Objection raised — Scope
06/25/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT #3B AT THIRD FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01420355-I1
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIZABETH MALETZ
06/22/2026
Special inspection requirement — Final
ELIZABETH MALETZ
06/22/2026
Special inspection requirement — Lighting controls
ELIZABETH MALETZ
06/22/2026
Special inspection requirement — Interior lighting power
ELIZABETH MALETZ
01/29/2026
Signed off — Alteration
RENOVATE EXISTING APARTMENT 4B ON THE 4TH FLOOR. DEMO AND CONSTRUCTION INTERIOR WALLS, FINISHES AND CABINETRY. PLUMBING AND STRUCTURAL FILED SEPARATELY.
B07995784-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/16/2025
Signed off — Alteration
B07995810-I1
07/15/2025
Signed off — Alteration
Subsequent filing for structural work.
B00716279-S1
07/14/2025
Signed off — Alteration
Subsequent filing for structural work.
B00716279-I1
07/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2025
Signed off — Alteration
B00220158-I1
06/27/2025
Permit issued — Structural
B00716279-S1-ST
05/12/2025
Special inspection requirement — Masonry
DARIUS TORABY
05/12/2025
Special inspection requirement — Air barrier - visual inspection
DARIUS TORABY
05/12/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DARIUS TORABY
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DARIUS TORABY
05/12/2025
Special inspection requirement — Final
DARIUS TORABY
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
DARIUS TORABY
04/28/2025
Signed off — Alteration
B01009339-I1
03/27/2025
Objection resolved — Addressed
03/27/2025
Objection resolved — Addressed
03/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DARIUS TORABY
03/25/2025
Objection raised — Other
03/25/2025
Objection raised — Inspections
03/17/2025
Filed — Alteration
Subsequent filing for structural work.
B00716279-S1
03/17/2025
Filed — Alteration
Subsequent filing for structural work.
B00716279-P1
03/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
DARIUS TORABY
02/25/2025
Permit issued — Suspended Scaffold
B01009339-I1-SC
02/10/2025
Special inspection requirement — Structural Steel - Welding
DARIUS TORABY
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
DARIUS TORABY
02/07/2025
Special inspection requirement — Final
DARIUS TORABY
02/07/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
DARIUS TORABY
02/07/2025
Special inspection requirement — Final
DARIUS TORABY
02/07/2025
Special inspection requirement — Air barrier - visual inspection
DARIUS TORABY
02/07/2025
Special inspection requirement — Masonry
DARIUS TORABY
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DARIUS TORABY
02/03/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00907266-I1
11/26/2024
Special inspection requirement — Final
Andrew Lyon
11/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
11/26/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
EUGENE BIFULCO
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Andrew Lyon
11/15/2024
Filed — Alteration
RENOVATE EXISTING APARTMENT 4B ON THE 4TH FLOOR. DEMO AND CONSTRUCTION INTERIOR WALLS, FINISHES AND CABINETRY. PLUMBING AND STRUCTURAL FILED SEPARATELY.
B07995784-P1
10/16/2024
Signed off — Alteration
STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION OF APARTMENT 4B ON THE 4TH FLOOR. INSTALL NEW STEEL BEAM IN LOCATION OF FORMER BEARING WALL. GENERAL CONSTRUCTION FILED UNDER SEPARATE APPLICATION B07995784-I1.
B07995801-I1
10/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Andrew Lyon
10/03/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
EUGENE BIFULCO
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
10/03/2024
Special inspection requirement — Final
Andrew Lyon
08/06/2024
Permit issued — Sidewalk Shed
B00907266-I1-SH
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2024
Permit issued — Plumbing
B07995810-I1-PL
02/22/2024
Filed — Alteration
B01009339-I1
02/22/2024
Permit issued — Suspended Scaffold
B01009339-I1-SC
Latest 60 of 170 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RENNON CONSTRUCTION2007/08/2026
SUN GARDEN HOMES ASSOCIATION4307/08/2026
SUN GARDEN HOMES ASSOC IN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EL CHOUM CONSULTING403/21/2026
ANZALONE ARCHITECTURE1003/21/2026
AE DESIGN SOLUTION403/21/2026
CROSSFIELD PLUMBING HEATING203/21/2026
RENNON CONSTRUCTION103/21/2026
A E C CONSULTING EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RENNON CONSTRUCTION CORPGeneral Contractor1207/08/2026
SKYLINE RESTORATION INCGeneral Contractor807/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor603/21/2026
SENAD MEHOVICElectrical603/21/2026
E M ELECTRICAL NY CORP 004614General Contractor503/22/2026
DPH PLUMBING & HTG CORPPlumbing307/08/2026
CROSSFIELD PLBG.&HTGPlumbing207/08/2026
DINO KOLJENOVIC BDC CORPGeneral Contractor207/08/2026
JGL CONTRACTING CORPGeneral Contractor203/21/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor207/08/2026
FRANCO BELLI PLMG&HTG SONPlumbing107/08/2026
CHIARAMONTE, SALVATOREElectrical103/21/2026
DAVEN ELECTRIC CORPElectrical103/22/2026
FELIZ, GABRIELElectrical103/21/2026
VSBUILTGeneral Contractor108/26/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DARIUS TORABY ARCHITECTS,116303/17/2025
CROSSCHECK INSPECTION SER544511/15/2024
BAZINI ENGINEERING, P.C.1808101/17/2023
CL ENGINEERING P.C.6781203/15/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVSBUILT LLC08/25/2026
DOB NOWStructuralSigned-offSKYLINE RESTORATION INC06/27/2025
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/25/2025
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL08/06/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/26/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/22/2024
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/20/2024
DOB NOWGeneral ConstructionSigned-offDINO KOLJENOVIC BDC CORP10/17/2023
DOB NOWStructuralSigned-offDINO KOLJENOVIC BDC CORP10/17/2023
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP09/07/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL08/11/2023
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/06/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG02/22/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/16/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG01/24/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC12/19/2022
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP12/07/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC09/16/2022
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/09/2022
DOB NOWMechanical SystemsSigned-offJGL CONTRACTING06/09/2022
DOB NOWPlumbingSigned-offFRANCO BELLI PLMG&HTG SON06/09/2022
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP05/18/2022
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP08/10/2021
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP12/03/2020
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP09/08/2020
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP08/30/2019
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP08/30/2019
BISOTISSUEDTITAN CONTRACTING CORP08/10/2020
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2023Pass-Final Shed WithdrawalPassView ↗
08/31/2023Fail-Final Shed WithdrawalFailView ↗
04/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/01/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
09/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/22/2026Energy Code Compliance InspectionsELIZABETH MALETZprogress
06/22/2026FinalELIZABETH MALETZprogress
06/22/2026Lighting controlsELIZABETH MALETZenergy_progress
06/22/2026Interior lighting powerELIZABETH MALETZenergy_progress
05/12/2025MasonryDARIUS TORABYspecial
05/12/2025Air barrier - visual inspectionDARIUS TORABYenergy_progress
05/12/2025Exterior Insulation and Finish Systems (EIFS)DARIUS TORABYspecial
05/12/2025Structural Stability – Alterations of existing buildingsDARIUS TORABYspecial
05/12/2025FinalDARIUS TORABYprogress
05/12/2025Energy Code Compliance InspectionsDARIUS TORABYprogress
03/26/2025Structural Stability – Alterations of existing buildingsDARIUS TORABYspecial
03/17/2025Tenant Protection Plan ComplianceDARIUS TORABYspecial
02/10/2025Structural Steel - WeldingDARIUS TORABYspecial
02/07/2025Energy Code Compliance InspectionsDARIUS TORABYprogress
02/07/2025FinalDARIUS TORABYprogress
02/07/2025Exterior Insulation and Finish Systems (EIFS)DARIUS TORABYspecial
02/07/2025FinalDARIUS TORABYprogress
02/07/2025Air barrier - visual inspectionDARIUS TORABYenergy_progress
02/07/2025MasonryDARIUS TORABYspecial
02/07/2025Structural Stability – Alterations of existing buildingsDARIUS TORABYspecial
11/26/2024FinalAndrew Lyonprogress
11/26/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
11/26/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/26/2024Construction Operations Influencing Adjacent StructuresEUGENE BIFULCOspecial
11/26/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
Latest 25 of 41.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch15
08/31/2026B00668567-I1Request digital key ↗
08/31/2026B00668387-I1Request digital key ↗
08/29/2026B00716279-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00220169-I1Request digital key ↗
09/02/2026B00220158-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/05/2019340695475Open ↗
▸BISWORK PERMIT APPLICATION1
08/10/2020340695475Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/29/2026B00716279-I1Open ↗
08/29/2026B00731072-I1Open ↗
08/27/2026B00808673-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B01420355-I1Open ↗
09/02/2026B01420355-I1Open ↗
09/02/2026B01420355-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/29/2026B00716279-I1Open ↗
08/29/2026B00716279-I1Open ↗
08/29/2026B00716279-I1Open ↗
Showing 3 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/05/2019340695475Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/05/2019340695475Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/05/2019340695475Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026B00220169-I1Open ↗
08/13/2026B00220158-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
09/05/2019340695475Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00808673-I1Open ↗
08/27/2026B07995810-I1Open ↗
08/27/2026B07995801-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026B00716279-S1Open ↗
08/13/2026B00716279-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/05/2019340695475Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00716279-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/10/2020340695475Open ↗
09/05/2019340695475Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00716279-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/05/2019340695475Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/05/2019340695475Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01009339-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01009339-I1Open ↗