← Back
BuildNYC
Over six families without stores
637 QUINCY STREET
BROOKLYN · BIN 3044278
💬 Discuss this project
1899Year Built
4Stories
C1Building Class
R6AZoning
5,761 sfGross Floor Area
8Units
Rent Stabilized10 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: Amr Quincy · 1,833 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHeavy duty sidewalk shed installation33p · 3 filings · 20 docs
PenthouseUnit PH667p · 3 filings · 20 docs
Floor 424p · 1 filing · 20 docs
Floor 3Basement, second, and third floor work65p · 3 filings · 20 docs
Floor 2Basement, second, and third floor work63p · 3 filings · 20 docs
Floor 1Basement, second, and third floor work69p · 4 filings · 20 docs
CellarBasement, second, and third floor work48p · 3 filings · 20 docs
Basement3p · 1 filing · 20 docs
Sub-BasementBasement, second, and third floor work41p · 3 filings · 20 docs
Site & exterior84p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Le Capital NYC2107/08/2026
Amr Quincy103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/12/2021$998K—Private party → AMR QUINCY LLC$173/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Omf Architect201/11/2023
Infocus Design and Planning810/20/2022
KNF Services Crop112/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Treasure Box Services403/21/2026
XH&RC Plumbing and Heating1403/21/2026
Highrise Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sat Construction ServicesGeneral Contractor1207/08/2026
Sat Construction ServicesScaffold903/21/2026
Sat Construction ServicesGeneral Contractor503/22/2026
Wu (Woody) ChenElectrical203/21/2026
Village P & H NYPlumbing207/08/2026
WCK ElectricElectrical103/22/2026
Village P & H NYFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616901/11/2023
Building Lifecycle
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/10/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/11/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/18/2023
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE…
HPD violation · open
12/18/2023
§ 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of…
HPD violation · open
134 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSat Construction Services12/20/2022
DOB NOWSupport of ExcavationSigned-offSat Construction Services10/24/2022
DOB NOWConstruction FenceSigned-offSat Construction Services06/19/2022
DOB NOWGeneral ConstructionSigned-offSat Construction Services06/19/2022
DOB NOWPlumbingSigned-offVillage P & H NY02/14/2022
DOB NOWSprinklersSigned-offVillage P & H NY02/14/2022
DOB NOWSupported ScaffoldSigned-offSat Construction Services12/13/2021
DOB NOWFoundationSigned-offSat Construction Services09/03/2021
DOB NOWStructuralSigned-offSat Construction Services09/01/2021
DOB NOWGeneral ConstructionSigned-offSat Construction Services08/23/2021
DOB NOWConstruction FenceSigned-offSat Construction Services06/22/2021
BIS—ISSUEDSat Construction Services01/25/2023
BISOTISSUEDHoly Land Iron Works01/14/2002
1 project · most recent 12/29/2022
General Wiring
FiledStatusContractorScope
12/29/2022CompleteWCK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/31/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/29/2022Fail-Final General Construction Non-Directive 14FailView ↗
08/31/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/01/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/08/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
01/13/2023Post-installed AnchorsFAHAD FATEHspecial
01/13/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/13/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/13/2023Maintenance informationFAHAD FATEHenergy_progress
01/13/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/13/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
01/13/2023Sprinkler SystemsFAHAD FATEHspecial
01/13/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/04/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/04/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/04/2023Maintenance informationFAHAD FATEHenergy_progress
01/04/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/04/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
01/04/2023Sprinkler SystemsFAHAD FATEHspecial
01/04/2023Post-installed AnchorsFAHAD FATEHspecial
01/04/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/24/2022Maintenance informationFAHAD FATEHenergy_progress
10/24/2022MeteringFAHAD FATEHenergy_progress
10/24/2022Exterior lighting powerFAHAD FATEHenergy_progress
10/24/2022Air barrier - visual inspectionFAHAD FATEHenergy_progress
10/24/2022Fenestration air leakageFAHAD FATEHenergy_progress
10/24/2022Fenestration areasFAHAD FATEHenergy_progress
10/24/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
10/24/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
10/24/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 98.
139 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account