← Back
BuildNYC
Walk-up apt, over six families with stores
639 HICKS STREET
BROOKLYN · BIN 3005079
💬 Discuss this project
1900Year Built
4Stories
C7Building Class
R6BZoning
5,480 sfGross Floor Area
8Units
Rent Stabilized3 Active Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 639 Hicks St · 1,500 sf lot · 3.65 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofYak Management LLCUnder Construction2p · 2 filings · 14 docs
Floor 3Remove metal deck, door, restore window and wall1p · 1 filing · 3 docs
Floor 2Unit 2F, Unit 2RUnder Construction7p · 2 filings · 14 docs
Floor 1Under Construction5p · 1 filing · 8 docs
CellarUnder Construction4p · 1 filing · 8 docs
Site & exteriorYak Management LLCUnder Construction7p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
65 Woodhull703/21/2026
639 Hicks St103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/19/2026$3.4M—639 HICKS ST LLC → PEACHES 7 LLC$620/sf building
06/29/2023$2.9M—65 WOODHULL LLC → 639 HICKS ST LLC$529/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction407/22/2026
Architect Associates106/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Architectural Design Solutions103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Henry Myers Plumbing & Hspecialty_contractor207/10/2026
Super Charged ElectricElectrical103/21/2026
Tadkar ConstructionGeneral Contractor108/07/2026
Tadkar ConstructionScaffold108/30/2026
Henry Myers P & HPlumbing107/31/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355307/22/2026
Arc-HI-Tech Associates6963106/16/2025
Building Lifecycle
All (47)Filed (5)Permit Issued (5)Signed Off (1)Violation (19)Objection (14)Special Inspection (3)
08/28/2026
Signed off — Alteration
REMOVE METAL DECK AND DOOR ON NORTH FACADE AT 3rd FLOOR; RESTORE WINDOW AND WALL TO COMPLY WITH ECB VIOLATIONS:39119473L & 39191402K.
B01419673-I1
08/27/2026
Permit issued — Construction Fence
B01423155-S2-FN
08/06/2026
Permit issued — General Construction
B01423155-I1-GC
07/30/2026
Permit issued — Plumbing
B01423155-S1-PL
07/22/2026
Filed — Alteration
ERECT INSTALL A TEMPORARY WOODEN CONSTRUCTION FENCE ON HICKS STREET.
B01423155-I1
07/22/2026
Filed — Alteration
ERECT INSTALL A TEMPORARY WOODEN CONSTRUCTION FENCE ON HICKS STREET.
B01423155-S1
07/22/2026
Filed — Alteration
ERECT INSTALL A TEMPORARY WOODEN CONSTRUCTION FENCE ON HICKS STREET.
B01423155-S2
07/08/2026
Permit issued — General Construction
B01419673-I1-GC
06/24/2026
Filed — Alteration
REMOVE METAL DECK AND DOOR ON NORTH FACADE AT 3rd FLOOR; RESTORE WINDOW AND WALL TO COMPLY WITH ECB VIOLATIONS:39119473L & 39191402K.
B01419673-I1
06/05/2026
Violation issued (ECB, closed)
Construction
04/23/2026
Permit issued — General Construction
B01238334-I1-GC
11/03/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Admin
07/14/2025
Objection raised — Scope
07/03/2025
Objection resolved — Addressed
07/03/2025
Objection resolved — Addressed
07/03/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Scope
06/20/2025
Objection raised — Zoning
06/20/2025
Objection raised — Admin
06/20/2025
Objection raised — Admin
06/20/2025
Objection raised — Admin
06/16/2025
Filed — Alteration
APPLICATION TO REMOVE A METAL DECK AT THE REAR SIDE (EXPOSURE #2), 3RD FLOOR LEVEL OF THE BUILDING. THIS APPLICATION IS FILED TO COMPLY WITH ECB VIOLATION #39119473L (WORK WITHOUT A PERMIT FOR INSTALLATION OF METAL BALCONY AT REAR EXP. #2).
B01238334-I1
06/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
06/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
06/09/2025
Special inspection requirement — Final
IGOR LISOVENKO
07/18/2024
Violation issued (ECB, closed)
Construction
07/18/2024
Violation issued (ECB, open)
Cranes and Derricks
11/22/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
10/06/2022
Violation issued (HPD, open)
A
10/06/2022
Violation issued (HPD, open)
A
11/28/2021
Violation issued (ECB, closed)
Unknown
04/13/2021
Violation issued (HPD, closed)
A
03/10/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/14/2015
Violation issued (HPD, closed)
C
01/21/2015
Violation issued (HPD, closed)
C
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/2001
Violation issued (HPD, closed)
B
05/02/2001
Violation issued (HPD, closed)
A
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedTadkar Construction08/27/2026
DOB NOWGeneral ConstructionPermit IssuedTadkar Construction08/06/2026
DOB NOWPlumbingPermit IssuedHenry Myers P & H07/30/2026
DOB NOWGeneral ConstructionSigned-offHenry Myers Plumbing & H07/08/2026
DOB NOWGeneral ConstructionPermit IssuedHenry Myers Plumbing & H04/23/2026
BISOTISSUEDBulson Management06/30/2022
BISOTISSUEDBulson Management06/30/2022
BISOTISSUEDBulson Management03/01/2022
BISOTISSUEDBulson Management03/01/2022
BISOTISSUEDExcel Builders & Renovato07/14/2021
BISOTISSUEDExcel Builders & Renovato07/14/2021
BISPLISSUEDMacreddin Plumbing & Heating12/11/2020
BISOTISSUEDExcel Builders & Renovato11/05/2020
BISOTISSUEDExcel Builders & Renovato11/05/2020
BISOTISSUEDExcel Builders & Renovato10/25/2018
BISOTISSUEDExcel Builders & Renovato10/24/2018
BISOTISSUEDExcel Builders & Renovato12/29/2016
BISOTISSUEDExcel Builders & Renovato02/25/2016
1 project · most recent 07/22/2026
Water/Sanitary
FiledStatusContractorScope
07/22/2026Permit IssuedHenry Myers Plumbing & HeatingWater/Sanitary
2 projects · most recent 10/20/2026
General Wiring
FiledStatusContractorScope
10/20/2026Permit IssuedTMF Electrical Contracting9 meters, 9 new_meters
08/26/2026Permit IssuedMac Elect'l ContractingGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/13/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
06/13/2025Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
06/09/2025FinalIGOR LISOVENKOprogress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01238334-I1Request digital key ↗
08/16/2026B01419673-I1Request digital key ↗
08/16/2026B01423155-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
03/10/2022321298449Open ↗
03/10/2022321298449Open ↗
12/11/2020321298449Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
11/02/2020321298449Open ↗
10/27/2020321298449Open ↗
01/22/2016321298449Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/02/2020321298449Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/13/2018321298449Open ↗
10/23/2017321298449Open ↗
10/23/2017321298449Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01238334-I1Open ↗
08/16/2026B01419673-I1Open ↗
08/16/2026B01423155-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026B01238334-I1Open ↗
08/22/2026B01238334-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B01238334-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/22/2016321298449Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/22/2016321298449Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01238334-I1Open ↗
08/16/2026B01419673-I1Open ↗
08/16/2026B01423155-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/22/2016321298449Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/23/2017321298449Open ↗
06/02/2017321298449Open ↗
01/22/2016321298449Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/02/2018321298449Open ↗
04/26/2018321298449Open ↗
04/26/2018321298449Open ↗
▸BISSUPERSEDING LETTER2
03/10/2022321298449Open ↗
03/10/2022321298449Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/22/2016321298449Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
11/09/2020321298449Open ↗
11/09/2020321298449Open ↗
▸BISEFILING COVER SHEET2
01/22/2016321298449Open ↗
01/20/2016321298449Open ↗
▸BISADDITIONAL INFORMATION1
08/23/2018321298449Open ↗