← Back
Elevator apt, fireproof with stores
Riverside Center
639 WEST 59 STREET · Upper West Side-Lincoln Square · BIN 1089374
💬 Discuss this project
2016Year Built
33Stories
D6Building Class
—Zoning
437,396 sfGross Floor Area
217Units
LL97 CoveredRent Stabilized5 Open Violations ▸FISP: No Report Filed
Elevator apt, fireproof with stores · Owner of record: RCB4 NOMINEE LLC · 57,638 sf lot · 7.59 FAR built · Flood zone AE
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Floor 361 filing · 3 docs
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 2540p · 2 filings · 20 docs
Floor 24
Floor 23
Floor 22
Floor 2138p · 2 filings · 20 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 54p · 3 filings · 10 docs
Floor 44p · 3 filings · 10 docs
Floor 34p · 3 filings · 10 docs
Floor 246p · 6 filings · 20 docs
Floor 1Under Construction125p · 12 filings · 20 docs
Cellar42p · 4 filings · 20 docs
Sub-Cellar19p · 1 filing · 20 docs
Site & exterior9p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RCB 4 NOMINEE LLC A DELAWARE LIM4103/21/2026
GID3407/08/2026
RCB 4 NOMINEE LLC A DELAWARE1203/21/2026
RCB 4 NOMINEE1003/22/2026
MTB ARCHITECTURAL METAL GLASS703/21/2026
RCB NOMINEE LLC, A DELAWARE LIMITED503/22/2026
RCB NOMINEE LLC A DELAWARE403/21/2026
GID PROPERTY MGMT303/22/2026
RCB1 NOMINEE LLC A DELAWARE LIM303/21/2026
RCB 3 NOMINEE LLC A DELAWARE LIM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRIDGE EXPEDITING203/21/2026
JM ZONING, LLC.3003/21/2026
LOUIS STRIAR603/21/2026
EUROCELT EXPEDITING, INC403/21/2026
I L CONSULTING203/21/2026
A1 EXPEDITING SERVICE403/21/2026
DOMANI CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROUNDSQUARE BUILDERS,LLCGeneral Contractor707/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor507/08/2026
CITY SIGNSScaffold307/08/2026
DESIMONE BUILDERS LLCGeneral Contractor309/19/2026
TISHMAN INTERIORS CORPGeneral Contractor203/21/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor203/21/2026
ACCESS PLUMBING CORPPlumbing207/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor203/21/2026
A & M WARSHAW PLBG & HTGPlumbing207/08/2026
WILLIAM C. GERAKARIS P&HPlumbing208/30/2026
JKT CONSTRUCTION INCGeneral Contractor203/21/2026
CAPITOL FIRE SPRINKLER COFire Protection109/02/2026
COCOZZA GROUP LLCGeneral Contractor104/09/2026
ARTHUR GROSSMANElectrical103/21/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
OLIVER CHRISTOPHERElectrical103/21/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616402/17/2026
CROSSCHECK INSPECTION SER544111/13/2025
TECTONIC ENGINEERING CONS1061310/15/2021
Building Lifecycle
All (181)Filed (29)Permit Issued (29)Signed Off (15)Violation (60)Objection (18)Special Inspection (30)
09/18/2026
Permit issued — Mechanical Systems
M01343007-S1-MS
09/03/2026
Permit issued — General Construction
M01343007-I1-GC
09/01/2026
Permit issued — Sprinklers
M01343007-S3-EW-SP
08/28/2026
Permit issued — Plumbing
M01343007-S2-PL
08/03/2026
Permit issued — Plumbing
M01343007-S2-PL
07/30/2026
Signed off — Alteration
ERECTION OF MINOR PARTITIONS, MILLWORK, NEW LIGHTING AND NEW FINISHES THROUGHOUT
M01311266-I1
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
B
06/03/2026
Permit issued — General Construction
M01343007-I1-GC
05/08/2026
Violation issued (HPD, open)
A
02/17/2026
Filed — Alteration
M01343007-S2
02/17/2026
Filed — Alteration
M01343007-S1
02/17/2026
Filed — Alteration
M01343007-S3
02/17/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/16/2026
Filed — Alteration
M01343007-I1
02/16/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
01/20/2026
Violation issued (HPD, closed)
A
01/13/2026
Violation issued (HPD, closed)
A
01/06/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
12/16/2025
Permit issued — General Construction
M01311266-I1-GC
11/13/2025
Filed — Alteration
ERECTION OF MINOR PARTITIONS, MILLWORK, NEW LIGHTING AND NEW FINISHES THROUGHOUT
M01311266-I1
06/13/2025
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, closed)
A
09/12/2023
Violation issued (HPD, closed)
C
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 181 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDESIMONE BUILDERS LLC09/18/2026
DOB NOWGeneral ConstructionPermit IssuedDESIMONE BUILDERS LLC09/03/2026
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO09/01/2026
DOB NOWPlumbingPermit IssuedWILLIAM C. GERAKARIS P&H08/28/2026
DOB NOWPlumbingPermit IssuedWILLIAM C. GERAKARIS P&H08/03/2026
DOB NOWGeneral ConstructionPermit IssuedDESIMONE BUILDERS LLC06/03/2026
DOB NOWGeneral ConstructionSigned-offCOCOZZA GROUP LLC12/16/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION02/07/2022
DOB NOWMechanical SystemsSigned-offJKT CONSTRUCTION INC07/16/2021
DOB NOWSignSigned-offELMER DAWSON04/23/2021
DOB NOWSignSigned-offELMER DAWSON04/23/2021
DOB NOWMechanical SystemsSigned-offROUNDSQUARE BUILDERS,LLC03/07/2021
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC03/01/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO03/01/2021
DOB NOWMechanical SystemsSigned-offROUNDSQUARE BUILDERS,LLC02/13/2021
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG12/08/2020
DOB NOWPlumbingSigned-offANTHONY CAIAZZO11/24/2020
DOB NOWMechanical SystemsSigned-offROUNDSQUARE BUILDERS,LLC10/01/2020
DOB NOWSprinklersSigned-offACCESS PLUMBING CORP09/22/2020
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP07/22/2020
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG11/27/2019
DOB NOWSignSigned-offELMER DAWSON11/08/2019
DOB NOWSupported ScaffoldSigned-offUNIVERSAL BUILD SUPP LLC09/30/2019
DOB NOWConstruction FenceSigned-offTISHMAN INTERIORS CORP04/05/2019
DOB NOWSupported ScaffoldSigned-offUNIVERSAL BUILD SUPP LLC02/07/2019
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC12/19/2018
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC12/17/2018
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC11/28/2018
DOB NOWConstruction FenceSigned-offSAFWAY ATLANTIC, LLC11/20/2018
BISOTISSUEDHILL-WEST ARCHITECT01/09/2024
BISOTISSUEDJKT CONSTRUCTION INC04/02/2021
BISOTISSUEDROUNDSQUARE BUILDERS,LLC03/03/2021
BISOTISSUEDROUNDSQUARE BUILDERS,LLC03/01/2021
BISOTISSUEDROUNDSQUARE BUILDERS,LLC02/12/2021
BISPLISSUEDALMAR PLUMBING & HTG CORP12/10/2020
BISOTISSUEDTISHMAN CONSTRUCTION CORP11/17/2020
BIS—ISSUEDTISHMAN CONSTRUCTION CORP10/05/2020
BIS—ISSUEDTISHMAN CONSTRUCTION CORP09/30/2020
BIS—ISSUEDTISHMAN CONSTRUCTION CORP09/25/2020
BISSPISSUEDGRINNELL LLC09/15/2020
+ 39 more permits on file
17 projects · most recent 09/17/2026
General Wiring Lighting
FiledStatusContractorScope
09/17/2026Permit IssuedLAREDO ELECTRIC, INC.General Wiring
01/31/2026Permit IssuedA+ ELECTRIC OF GREATER NY219 meters
01/22/2026CompleteY.S ELECTRICGeneral Wiring, Lighting
01/02/2025CompleteATLAS-ACON ELEC. SERVICE—
03/26/2024CompleteOMD ELECTRICAL CORP1 meters, 1 new_meters
03/19/2024CompleteDELCO ELECTRICAL CORP.—
06/15/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
01/10/2022CompleteJANON ELECTRIC CORPGeneral Wiring
12/02/2021CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
09/16/2021CompleteSPIRELLI ELECTRIC INCGeneral Wiring
05/19/2021CompleteRAINBOW ELECTRIC CO., INC—
05/19/2021CompleteRAINBOW ELECTRIC CO., INC—
04/05/2021CompleteRAINBOW ELECTRIC CO., INC—
07/23/2020CompleteSPIRELLI ELECTRIC INC—
10/18/2019CompleteB & G ELECL CONTR OF NY I3 meters, 3 new_meters
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
02/17/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
02/16/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
02/16/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
02/16/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
02/16/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
02/16/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
02/16/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
02/16/2026FinalSHAHRIAR QUAYYUMprogress
02/16/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
02/16/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
02/16/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
02/16/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
02/16/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
02/06/2026MeteringSHAHRIAR QUAYYUMenergy_progress
02/06/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
02/06/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
02/06/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
02/06/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
02/06/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
02/06/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 75.
▾Documents — 1,223 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch - Plumbing9
09/04/2026M00354369-I1Request digital key ↗
09/03/2026M00386119-P1Request digital key ↗
09/03/2026M00231202-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch6
09/06/2026M00101241-I1Request digital key ↗
09/06/2026M00100660-I1Request digital key ↗
09/05/2026M00088255-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00323266-I1Request digital key ↗
09/04/2026M00386111-P1Request digital key ↗
08/15/2026M00323266-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00323230-I1Request digital key ↗
09/03/2026M00386119-P1Request digital key ↗
08/14/2026M00386119-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00088255-I1Request digital key ↗
09/05/2026M00088255-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00150203-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/05/2026M00329970-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00219620-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00455553-I1Request digital key ↗
▸Applications & Permits246
▸BISPLAN / WORK APPROVAL APPLICATION174
01/29/2026121193458Open ↗
10/29/2025121193458Open ↗
10/14/2025121193458Open ↗
Showing 3 of 174 on file for this type
▸BISWORK PERMIT APPLICATION60
01/09/2024123194239Open ↗
04/02/2021123570741Open ↗
Showing 2 of 60 on file for this type
▸BISPLACE OF ASSEMBLY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records18
▸BISFLOOD ZONE DESIGN CERTIFICATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFLOOD ZONE COMPLIANCE4
02/22/2024122780400Open ↗
02/22/2024122737663Open ↗
10/04/2021140823544Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/18/2024124040830Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
04/29/2021121193458Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications216
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION79
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 79 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/01/2026M00386111-P1Open ↗
09/01/2026M00386111-P1Open ↗
09/01/2026M00386111-P1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/05/2026M00088255-I1Open ↗
09/05/2026M00088255-P1Open ↗
09/05/2026M00323230-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M01343007-S3Open ↗
09/01/2026M00386111-P1Open ↗
09/01/2026M00386111-P1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
05/01/2025123014889Open ↗
Showing 1 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment56
▸BISSCHEDULE B - PLUMBING34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
09/22/2025121193458Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/22/2025121193458Open ↗
02/22/2024140593285Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
11/23/2022123216180Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection15
▸DOB NOWTenant Protection Plan10
09/04/2026M00354369-I1Open ↗
09/03/2026M00386119-P1Open ↗
08/14/2026M00386119-I1Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST3
03/22/2024121193458Open ↗
03/22/2024140409582Open ↗
Showing 2 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos43
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION17
05/06/2024123216180Open ↗
01/09/2024123194239Open ↗
11/29/2023140846280Open ↗
Showing 3 of 17 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed8
09/05/2026M00088255-P1Open ↗
09/05/2026M00088255-I1Open ↗
08/13/2026M00323230-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
09/05/2026M00088255-I1Open ↗
08/13/2026M00100660-I1Open ↗
08/13/2026M00219620-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance51
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY22
07/12/2023140551702Open ↗
07/12/2023140551702Open ↗
07/05/2023121193458Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
02/13/2024121193458Open ↗
01/22/2024122737663Open ↗
09/28/2023140411944Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
05/29/2024121193458Open ↗
05/29/2024121193458Open ↗
11/29/2023140378598Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
10/23/2024121193458Open ↗
10/23/2024121193458Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00455553-I1Open ↗
▸Inspections & Test Reports97
▸BISTECHNICAL REPORT: RESPONSIBILITY50
05/15/2024121193458Open ↗
04/02/2024121193458Open ↗
04/02/2024121193458Open ↗
Showing 3 of 50 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS2
03/19/2024121193458Open ↗
08/23/2021140938494Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
05/29/2024121193458Open ↗
▸Approvals, Objections & Sign-offs109
▸BISSCHEDULE A - OCCUPANCY / USE41
01/29/2026121193458Open ↗
10/29/2025121193458Open ↗
10/14/2025121193458Open ↗
Showing 3 of 41 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
06/13/2025123014889Open ↗
05/17/2024122737663Open ↗
05/17/2024140593285Open ↗
Showing 3 of 37 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFINAL11
06/12/2025123014889Open ↗
02/22/2024140593285Open ↗
02/22/2024122737663Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT27
07/19/2023140570889Open ↗
10/08/2021123674719Open ↗
10/04/2021140823544Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW314
04/09/2024123216180Open ↗
02/22/2024140593285Open ↗
12/28/2023140691954Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms223
▸BISADDITIONAL INFORMATION150
05/01/2025123014889Open ↗
03/27/2024121193458Open ↗
04/29/2021121193458Open ↗
Showing 3 of 150 on file for this type
▸BISBOROUGH INTAKE FORM37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISEFILING COVER SHEET23
11/01/2024124040830Open ↗
Showing 1 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents26
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)5
11/29/2023140691954Open ↗
10/31/2023140752585Open ↗
04/25/2023122780400Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
11/18/2024124040830Open ↗
11/18/2024124040830Open ↗
11/18/2024124040830Open ↗
Showing 3 of 4 on file for this type
▸BISLOWEST FLOOR ELEVATION4
02/22/2024122780400Open ↗
02/22/2024122737663Open ↗
12/28/2023140691954Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type