BuildNYC
Elevator apt, fireproof with stores
Riverside Center
639 WEST 59TH STREET · BIN 1089374
💬 Discuss this project
2016Year Built
33Stories
D6Building Class
—Zoning
437,396 sfGross Floor Area
217Units
LL97 CoveredRent Stabilized5 Active Violations ▸FISP: No Report Filed
Elevator apt, fireproof with stores · Owner of record: RCB4 Nominee · 57,638 sf lot · 7.59 FAR built · Flood zone AE
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 36Unit 36A1 filing · 3 docs
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25W.P. Carey42p · 2 filings · 20 docs
Floor 24
Floor 23
Floor 22
Floor 21W.P. Carey40p · 2 filings · 20 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5MTP Parking4p · 3 filings · 10 docs
Floor 4MTP Parking4p · 3 filings · 10 docs
Floor 3MTP Parking4p · 3 filings · 10 docs
Floor 2MTP Parking, W.P. Carey48p · 6 filings · 20 docs
Floor 1FS8 Pilates Studio, EMPELLON WATERLINE SQUARE +2Under Construction129p · 12 filings · 20 docs
CellarEMPELLON WATERLINE SQUARE, W.P. Carey46p · 5 filings · 20 docs
Sub-CellarEMPELLON WATERLINE SQUARE20p · 1 filing · 20 docs
Site & exteriorRcb Nominee LLC, A Delaware Limited9p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RCB 4 Nominee LLC A Delaware Lim6703/22/2026
GID3407/08/2026
RCB 4 Nominee1003/22/2026
MTB Architectural Metal Glass703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sherif Awad402/17/2026
Sarah Carpenter111/13/2025
Smalley Engineering910/15/2021
WSP507/30/2021
F.p.villano Consulting Engineering204/01/2021
Zoltan M Saro Architect101/24/2021
Douglas R. Vaggi, Architect103/11/2020
Jose L. Pena, P.E111/01/2019
Architecture by Domani104/05/2019
Universal Builders Supply204/02/2019
Safway Atlantic211/28/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bridge Expediting203/21/2026
Design 21473003/21/2026
Louis Striar603/21/2026
Eurocelt Expediting403/21/2026
Idm Associates203/21/2026
A1 Expediting Service403/21/2026
Domani Consulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roundsquare BuildersGeneral Contractor707/08/2026
Safway AtlanticScaffold507/08/2026
City SignsSign hanger307/08/2026
Desimone BuildersGeneral Contractor309/19/2026
William C. Gerakaris P&HPlumbing208/30/2026
High Quality ConstructionGeneral Contractor203/21/2026
JKT ConstructionGeneral Contractor203/21/2026
Tishman InteriorsScaffold203/21/2026
Universal Builders SupplyScaffold203/21/2026
Access PlumbingPlumbing207/08/2026
A & M Warshaw Plumbing & HeatingPlumbing207/08/2026
J. Caiazzo Plumbing & HeatingFire Protection107/08/2026
Accurate MechanicalPlumbing107/08/2026
Accurate MechanicalFire Protection107/08/2026
Cocozza GroupGeneral Contractor104/09/2026
Atlas-Acon Electric ServiceElectrical103/21/2026
Capitol Fire Sprinkler CoFire Protection109/02/2026
Omd ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616402/17/2026
Crosscheck Inspection Services544111/13/2025
Tectonic Engineering Cons1061310/15/2021
Building Lifecycle
All (181)Filed (29)Permit Issued (29)Signed Off (15)Violation (60)Objection (18)Special Inspection (30)
09/18/2026
Permit issued — Mechanical Systems
M01343007-S1-MS
09/03/2026
Permit issued — General Construction
M01343007-I1-GC
09/01/2026
Permit issued — Sprinklers
M01343007-S3-EW-SP
08/28/2026
Permit issued — Plumbing
M01343007-S2-PL
08/03/2026
Permit issued — Plumbing
M01343007-S2-PL
07/30/2026
Signed off — Alteration
ERECTION OF MINOR PARTITIONS, MILLWORK, NEW LIGHTING AND NEW FINISHES THROUGHOUT
M01311266-I1
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
B
06/03/2026
Permit issued — General Construction
M01343007-I1-GC
05/08/2026
Violation issued (HPD, open)
A
02/17/2026
Filed — Alteration
M01343007-S1
02/17/2026
Filed — Alteration
M01343007-S3
02/17/2026
Filed — Alteration
M01343007-S2
02/17/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/16/2026
Filed — Alteration
M01343007-I1
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
02/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SHAHRIAR QUAYYUM
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
01/20/2026
Violation issued (HPD, closed)
A
01/13/2026
Violation issued (HPD, closed)
A
01/06/2026
Special inspection requirement — Final
SHAHRIAR QUAYYUM
12/16/2025
Permit issued — General Construction
M01311266-I1-GC
11/13/2025
Filed — Alteration
ERECTION OF MINOR PARTITIONS, MILLWORK, NEW LIGHTING AND NEW FINISHES THROUGHOUT
M01311266-I1
06/13/2025
Violation issued (HPD, open)
A
04/17/2024
Violation issued (HPD, closed)
A
09/12/2023
Violation issued (HPD, closed)
C
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 181 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDesimone Builders09/18/2026
DOB NOWGeneral ConstructionPermit IssuedDesimone Builders09/03/2026
DOB NOWSprinklersPermit IssuedCapitol Fire Sprinkler Co09/01/2026
DOB NOWPlumbingPermit IssuedWilliam C. Gerakaris P&H08/28/2026
DOB NOWPlumbingPermit IssuedWilliam C. Gerakaris P&H08/03/2026
DOB NOWGeneral ConstructionPermit IssuedDesimone Builders06/03/2026
DOB NOWGeneral ConstructionSigned-offCocozza Group12/16/2025
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction02/07/2022
DOB NOWMechanical SystemsSigned-offJKT Construction07/16/2021
DOB NOWSignSigned-offElmer Dawson04/23/2021
DOB NOWSignSigned-offElmer Dawson04/23/2021
DOB NOWMechanical SystemsSigned-offRoundsquare Builders03/07/2021
DOB NOWPlumbingSigned-offAnthony Disabato03/01/2021
DOB NOWSprinklersSigned-offAccurate Mechanical03/01/2021
DOB NOWMechanical SystemsSigned-offRoundsquare Builders02/13/2021
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating12/08/2020
DOB NOWSprinklersSigned-offAnthony Caiazzo11/24/2020
DOB NOWMechanical SystemsSigned-offRoundsquare Builders10/01/2020
DOB NOWPlumbingSigned-offAccess Plumbing09/22/2020
DOB NOWPlumbingSigned-offAccess Plumbing07/22/2020
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating11/27/2019
DOB NOWSignSigned-offElmer Dawson11/08/2019
DOB NOWSupported ScaffoldSigned-offUniversal Build Supp09/30/2019
DOB NOWConstruction FenceSigned-offTishman Interiors04/05/2019
DOB NOWSupported ScaffoldSigned-offUniversal Build Supp02/07/2019
DOB NOWSidewalk ShedSigned-offSafway Atlantic12/19/2018
DOB NOWConstruction FenceSigned-offSafway Atlantic12/17/2018
DOB NOWSidewalk ShedSigned-offSafway Atlantic11/28/2018
DOB NOWConstruction FenceSigned-offSafway Atlantic11/20/2018
BISOTISSUEDHill-West Architect01/09/2024
BISOTISSUEDJKT Construction04/02/2021
BISOTISSUEDRoundsquare Builders03/03/2021
BISOTISSUEDRoundsquare Builders03/01/2021
BISOTISSUEDRoundsquare Builders02/12/2021
BISPLISSUEDAlmar Plumbing & Heating12/10/2020
BISOTISSUEDTishman Construction11/17/2020
BIS—ISSUEDTishman Construction10/05/2020
BIS—ISSUEDTishman Construction09/30/2020
BIS—ISSUEDTishman Construction09/25/2020
BISSPISSUEDGrinnell09/15/2020
+ 39 more permits on file
17 projects · most recent 09/17/2026
General Wiring Lighting
FiledStatusContractorScope
09/17/2026Permit IssuedLaredo ElectricGeneral Wiring
01/31/2026Permit IssuedA+ Electric of Greater NY219 meters
01/22/2026CompleteY.S. ElectricGeneral Wiring, Lighting
01/02/2025CompleteAtlas-Acon Electric Service—
03/26/2024CompleteOmd Electrical1 meters, 1 new_meters
03/19/2024CompleteDelco Electrical—
06/15/2023CompleteE-J Electric Installation CoGeneral Wiring
01/10/2022CompleteJanon ElectricGeneral Wiring
12/02/2021CompleteKnight Electrical ServiceGeneral Wiring
09/16/2021CompleteSpirelli ElectricGeneral Wiring
05/19/2021CompleteRainbow Electric Co—
05/19/2021CompleteRainbow Electric Co—
04/05/2021CompleteRainbow Electric Co—
07/23/2020CompleteSpirelli Electric—
10/18/2019CompleteB & G Electrical Contracting of NY I3 meters, 3 new_meters
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
02/17/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
02/16/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
02/16/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
02/16/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
02/16/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
02/16/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
02/16/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
02/16/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
02/16/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
02/16/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
02/16/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
02/16/2026Mechanical SystemsSHAHRIAR QUAYYUMspecial
02/16/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
02/16/2026FinalSHAHRIAR QUAYYUMprogress
02/16/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
02/16/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
02/06/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
02/06/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
02/06/2026MeteringSHAHRIAR QUAYYUMenergy_progress
02/06/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
02/06/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
02/06/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
02/06/2026Tenant Protection Plan ComplianceSHAHRIAR QUAYYUMspecial
Latest 25 of 75.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FS8 Pilates StudioFitness / RecreationFloor 1
Project M01343007 Alteration · Permit Entire · 02/16/2026
MTP ParkingParkingFloors 1–5
Project M00487024 Alteration · LOC Issued · 04/01/2021
Project M00487025 Alteration · LOC Issued · 04/01/2021
W.P. CareyOfficeFloors 1, 2, 21, 25
Project M00386111 Alteration · LOC Issued · 08/31/2020
Project M00386119 Alteration · LOC Issued · 08/31/2020
EMPELLON WATERLINE SQUARERestaurant / Food ServiceSub-cellar, Cellar, Floor 1
Project M00323230 Alteration · LOC Issued · 03/05/2020
Project M00323266 Alteration · LOC Issued · 03/05/2020
Project M00231202 Alteration · LOC Issued · 10/08/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,223 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch - Plumbing9
09/04/2026M00354369-I1Request digital key ↗
09/03/2026M00386119-P1Request digital key ↗
09/03/2026M00231202-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch6
09/06/2026M00101241-I1Request digital key ↗
09/06/2026M00100660-I1Request digital key ↗
09/05/2026M00088255-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00323266-I1Request digital key ↗
09/04/2026M00386111-P1Request digital key ↗
08/15/2026M00323266-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00323230-I1Request digital key ↗
09/03/2026M00386119-P1Request digital key ↗
08/14/2026M00386119-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00088255-I1Request digital key ↗
09/05/2026M00088255-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00150203-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/05/2026M00329970-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00219620-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00455553-I1Request digital key ↗
▸Applications & Permits246
▸BISPLAN / WORK APPROVAL APPLICATION174
01/29/2026121193458Open ↗
10/29/2025121193458Open ↗
10/14/2025121193458Open ↗
Showing 3 of 174 on file for this type
▸BISWORK PERMIT APPLICATION60
01/09/2024123194239Open ↗
04/02/2021123570741Open ↗
Showing 2 of 60 on file for this type
▸BISPLACE OF ASSEMBLY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records18
▸BISFLOOD ZONE DESIGN CERTIFICATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFLOOD ZONE COMPLIANCE4
02/22/2024122780400Open ↗
02/22/2024122737663Open ↗
10/04/2021140823544Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
11/18/2024124040830Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
04/29/2021121193458Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications216
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION79
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 79 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/01/2026M00386111-P1Open ↗
09/01/2026M00386111-P1Open ↗
09/01/2026M00386111-P1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/05/2026M00088255-I1Open ↗
09/05/2026M00088255-P1Open ↗
09/05/2026M00323230-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M01343007-S3Open ↗
09/01/2026M00386111-P1Open ↗
09/01/2026M00386111-P1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
05/01/2025123014889Open ↗
Showing 1 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment56
▸BISSCHEDULE B - PLUMBING34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
09/22/2025121193458Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/22/2025121193458Open ↗
02/22/2024140593285Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
11/23/2022123216180Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection15
▸DOB NOWTenant Protection Plan10
09/04/2026M00354369-I1Open ↗
09/03/2026M00386119-P1Open ↗
08/14/2026M00386119-I1Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST3
03/22/2024121193458Open ↗
03/22/2024140409582Open ↗
Showing 2 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos43
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION17
05/06/2024123216180Open ↗
01/09/2024123194239Open ↗
11/29/2023140846280Open ↗
Showing 3 of 17 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed8
09/05/2026M00088255-P1Open ↗
09/05/2026M00088255-I1Open ↗
08/13/2026M00101241-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
09/05/2026M00088255-I1Open ↗
08/13/2026M00219620-I1Open ↗
08/13/2026M00100660-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance51
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY22
07/12/2023140551702Open ↗
07/12/2023140551702Open ↗
07/05/2023121193458Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
02/13/2024121193458Open ↗
01/22/2024122737663Open ↗
09/28/2023140411944Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
05/29/2024121193458Open ↗
05/29/2024121193458Open ↗
11/29/2023140378598Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
10/23/2024121193458Open ↗
10/23/2024121193458Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00455553-I1Open ↗
▸Inspections & Test Reports97
▸BISTECHNICAL REPORT: RESPONSIBILITY50
05/15/2024121193458Open ↗
04/02/2024121193458Open ↗
04/02/2024121193458Open ↗
Showing 3 of 50 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS2
03/19/2024121193458Open ↗
08/23/2021140938494Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
05/29/2024121193458Open ↗
▸Approvals, Objections & Sign-offs109
▸BISSCHEDULE A - OCCUPANCY / USE41
01/29/2026121193458Open ↗
10/29/2025121193458Open ↗
10/14/2025121193458Open ↗
Showing 3 of 41 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
06/13/2025123014889Open ↗
05/17/2024122737663Open ↗
05/17/2024140593285Open ↗
Showing 3 of 37 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFINAL11
06/12/2025123014889Open ↗
02/22/2024140593285Open ↗
02/22/2024122737663Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT27
07/19/2023140570889Open ↗
10/08/2021123674719Open ↗
10/04/2021140823544Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW314
04/09/2024123216180Open ↗
02/22/2024140593285Open ↗
12/28/2023140691954Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms223
▸BISADDITIONAL INFORMATION150
05/01/2025123014889Open ↗
03/27/2024121193458Open ↗
04/29/2021121193458Open ↗
Showing 3 of 150 on file for this type
▸BISBOROUGH INTAKE FORM37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISEFILING COVER SHEET23
11/01/2024124040830Open ↗
Showing 1 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents26
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)5
11/29/2023140691954Open ↗
10/31/2023140752585Open ↗
04/25/2023122780400Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
11/18/2024124040830Open ↗
11/18/2024124040830Open ↗
11/18/2024124040830Open ↗
Showing 3 of 4 on file for this type
▸BISLOWEST FLOOR ELEVATION4
02/22/2024122780400Open ↗
02/22/2024122737663Open ↗
12/28/2023140691954Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type