Two stories - detached, small or mid-size
64-14 213 STREET
QUEENS · BIN 4162267
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R1-2AZoning
3,288 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 18 docs
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/19/2023$1.9M—Private party → Private party$593/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DINGS ENGINEERING P.C.607/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DINGS ENGINEERING PC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXPRESS CONTRACNG CORP OFGeneral Contractor203/21/2026
FLUID MECHANICS CORPPlumbing207/22/2026
PETRONE PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DINGS ENGINEERING PC2051206/29/2025
Building Lifecycle
All (34)Filed (6)Permit Issued (4)Inspection (8)Objection (10)Special Inspection (6)
07/29/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/21/2026
Permit issued — Plumbing
Q00909771-S1-PL
07/17/2026
Filed — Alteration
Install a utility sink at Cellar, relocate (1) Kitchen Sink, and (1) Dish washer at 1st floor, Install (2) residential sink at 1st floor. No change of use, egress, and bulk of the building. This job is a subsequent job of OT application Q00909771-S1
Q00909771-P4
11/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Filed — Alteration
Install a utility sink at Cellar, relocate (1) Kitchen Sink, and (1) Dish washer at 1st floor, Install (2) residential sink at 1st floor. No change of use, egress, and bulk of the building. This job is a subsequent job of OT application Q00909771-S1
Q00909771-P3
09/17/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/07/2025
Filed — Alteration
Install a utility sink at Cellar, relocate (1) Kitchen Sink, and (1) Dish washer at 1st floor, Install (2) residential sink at 1st floor. No change of use, egress, and bulk of the building. This job is a subsequent job of OT application Q00909771-S1
Q00909771-P2
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
08/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yanqi Ding
08/06/2025
Special inspection requirement — Final
Yanqi Ding
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Inspections
07/22/2025
Objection raised — Zoning
07/22/2025
Objection raised — Scope
06/29/2025
Filed — Alteration
Install a utility sink at Cellar, relocate (1) Kitchen Sink, and (1) Dish washer at 1st floor, Install (2) residential sink at 1st floor. No change of use, egress, and bulk of the building. This job is a subsequent job of OT application Q00909771-S1
Q00909771-P1
05/12/2025
Permit issued — Plumbing
Q00909771-S1-PL
12/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
12/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yanqi Ding
12/31/2023
Special inspection requirement — Final
Yanqi Ding
12/04/2023
Permit issued — Plumbing
Q00909771-S1-PL
10/19/2023
Permit issued — General Construction
Q00909771-I1-GC
09/02/2023
Filed — Alteration
Install a utility sink at Cellar, relocate (1) Kitchen Sink, and (1) Dish washer at 1st floor, Install (2) residential sink at 1st floor. No change of use, egress, and bulk of the building. This job is a subsequent job of OT application Q00909771-S1
Q00909771-S1
08/22/2023
Objection resolved — Addressed
08/22/2023
Objection resolved — Addressed
08/15/2023
Objection raised — Scope
08/15/2023
Objection raised — Inspections
08/08/2023
Filed — Alteration
Install a utility sink at Cellar, relocate (1) Kitchen Sink, and (1) Dish washer at 1st floor, Install (2) residential sink at 1st floor. No change of use, egress, and bulk of the building. This job is a subsequent job of OT application Q00909771-S1
Q00909771-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP07/21/2026
DOB NOWPlumbingSigned-offFLUID MECHANICS CORP05/12/2025
DOB NOWPlumbingSigned-offPETRONE PLBG & HTG CORP12/04/2023
DOB NOWGeneral ConstructionSigned-offEXPRESS CONTRACNG CORP OF10/19/2023
BISEQISSUEDSHAHZAD BROTHERS INC09/29/2005
BIS—ISSUEDSHAHZAD BROTHERS INC09/29/2005
BISPLISSUEDROCK E SMALL PLBG&HTG INC08/03/2005
BISEQISSUEDSHAHZAD BROTHERS INC06/27/2005
BIS—ISSUEDSHAHZAD BROTHERS INC06/27/2005
1 project · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026Signed-offFLUID MECHANICS CORPGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/29/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2025Pass-Final PL - UndergroundPassView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/06/2025Fire-Resistant Penetrations and JointsYanqi Dingspecial
08/06/2025Structural Stability – Alterations of existing buildingsYanqi Dingspecial
08/06/2025FinalYanqi Dingprogress
12/31/2023Fire-Resistant Penetrations and JointsYanqi Dingspecial
12/31/2023Structural Stability – Alterations of existing buildingsYanqi Dingspecial
12/31/2023FinalYanqi Dingprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026Q00909771-P4Request digital key ↗
08/19/2026Q00909771-P3Request digital key ↗
08/19/2026Q00909771-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026Q00909771-P4Open ↗
08/13/2026Q00909771-S1Open ↗
08/13/2026Q00909771-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026Q00909771-P1Open ↗
09/25/2026Q00909771-P1Open ↗
08/24/2026Q00909771-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/25/2026Q00909771-P1Open ↗
08/24/2026Q00909771-I1Open ↗