← Back
BuildNYC
Two family frame
64-18 ELIOT AVENUE
QUEENS · Maspeth · BIN 4061911
💬 Discuss this project
1935Year Built
2Stories
B2Building Class
R4Zoning
1,800 sfGross Floor Area
2Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Two family frame · 2,326 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar1p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/27/2014$575K—Private party → Private party$319/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. Perotto Associates305/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G Perotto Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
All Day Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
06/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/30/2025
Filed — Alteration
REGISTER 2 DIRECT VENT BOILERS, 2 HW HTRS. GAS SHUTDOWN BY NATIONAL GRID FOR BYPASSING GAS METERS. REMOVE STOVE IN CELLAR. INSTALL 25FT OF 1 1/4" GAS PIPING. BOILERS TO BE DRAINED INTO INDIRECT WASTE NEUTRALIZER KIT PIPED TP EXG FL DRAIN W/ VAPOR TRAP
Q01192186-P2
05/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2025
Filed — Alteration
REGISTER 2 DIRECT VENT BOILERS, 2 HW HTRS. GAS SHUTDOWN BY NATIONAL GRID FOR BYPASSING GAS METERS. REMOVE STOVE IN CELLAR. INSTALL 25FT OF 1 1/4" GAS PIPING. BOILERS TO BE DRAINED INTO INDIRECT WASTE NEUTRALIZER KIT PIPED TP EXG FL DRAIN W/ VAPOR TRAP
Q01192186-P1
04/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
18 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAll Day Plumbing & Heating03/25/2025
1 project · most recent 05/30/2025
Gas
FiledStatusContractorScope
05/30/2025Signed-offAll Day Plumbing & HeatingGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account