← Back
BuildNYC
Miscellaneous two family
64-21 DOUGLASTON PARKWAY
QUEENS · BIN 4171812
💬 Discuss this project
1960Year Built
2Stories
B9Building Class
R4Zoning
1,694 sfGross Floor Area
2Units
Miscellaneous two family · 3,328 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 39p · 2 filings · 12 docs
Floor 210p · 2 filings · 12 docs
Floor 111p · 2 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/15/2021$960K—Private party → Private party$567/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Billah Engineering312/01/2021
Just Consulting Engineering106/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor303/21/2026
Catman PlumbingPlumbing107/08/2026
Building Lifecycle
03/24/2022
Signed off — Alteration
RENOVATION OF EXISTING FIRST, SECOND, AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00535332-I1
03/24/2022
Signed off — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBI BOILERSON FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00535335-I1
03/23/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/06/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSplen Construction06/14/2021
DOB NOWPlumbingSigned-offCatman Plumbing06/14/2021
1 project · most recent 06/21/2021
General Wiring
FiledStatusContractorScope
06/21/2021CompleteKJK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/23/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/25/2022Fail-Final General Construction Non-Directive 14FailView ↗
12/06/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account