← Back
BuildNYC
Two family brick
64-24 WOODBINE STREET
QUEENS · Ridgewood · BIN 4087835
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R5BZoning
2,640 sfGross Floor Area
2Units
Two family brick · 2,000 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 2 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Basement2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ciardullo Architecture Engineering2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/28/2021$999K—Private party → Private party$378/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ciardullo Architecture & Engineering809/15/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Next Level Construction IGeneral Contractor207/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827110/11/2021
Building Lifecycle
04/18/2023
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
Q00558996-I1-GC
09/28/2022
Signed off — Alteration
Replacement and addition of plumbing fixtures at both units of a 2-family dwelling. Add new toilet, new sink and new bath tub in second floor unit. Add shower in basement bathroom. Replace two ranges at existing locations.
Q00572790-I1
09/15/2022
Filed — Alteration
Replacement and addition of plumbing fixtures at both units of a 2-family dwelling. Add new toilet, new sink and new bath tub in second floor unit. Add shower in basement bathroom. Replace two ranges at existing locations.
Q00572790-P7
09/03/2022
Filed — Alteration
Replacement and addition of plumbing fixtures at both units of a 2-family dwelling. Add new toilet, new sink and new bath tub in second floor unit. Add shower in basement bathroom. Replace two ranges at existing locations.
Q00572790-P6
08/01/2022
Filed — Alteration
Replacement and addition of plumbing fixtures at both units of a 2-family dwelling. Add new toilet, new sink and new bath tub in second floor unit. Add shower in basement bathroom. Replace two ranges at existing locations.
Q00572790-P5
25 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedNext Level Construction I07/21/2022
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing11/18/2021
DOB NOWStructuralPermit IssuedNext Level Construction I11/04/2021
1 project · most recent 07/15/2022
General Wiring
FiledStatusContractorScope
07/15/2022CompleteRJ Electrical ContractorsGeneral Wiring
1 project · most recent 10/11/2021
Wood
FiledStatusContractorScope
10/11/2021Permit IssuedNext Level Construction IWood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/15/2021Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
07/15/2021FinalGeorge Varthalamisprogress
27 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account