← Back
Cape Cod
64-65 CLOVERDALE BOULEVARD
QUEENS · BIN 4163329
💬 Discuss this project
1950Year Built
1.67Stories
A0Building Class
R3XZoning
1,341 sfGross Floor Area
1Units
Cape Cod · 4,650 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
StructuralCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction8p · 1 filing · 14 docs
Floor 1Under Construction8p · 1 filing · 14 docs
CellarUnder Construction8p · 1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2026$990K—Private party → Private party$738/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CELTIC WAY CONSULTING LLC605/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME STYLE IMPROVEMENTS *General Contractor509/07/2026
GREAT STONE GEN'L CONST*General Contractor209/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506105/16/2026
CELTIC WAY CONSULTING LLC9780105/16/2026
Building Lifecycle
All (57)Filed (6)Permit Issued (7)Signed Off (1)Inspection (1)Objection (12)Special Inspection (30)
09/08/2026
Permit issued — Support of Excavation
Q01399880-S1-SE
09/04/2026
Permit issued — Earth Work
Q01399880-I1-FO-EA
09/03/2026
Permit issued — Earth Work
Q01399880-I1-ST
09/02/2026
Permit issued — Structural
Q01399880-I1-GC
09/02/2026
Permit issued — Foundation
Q01399880-I1-MS
08/26/2026
Signed off — Full Demolition
Q01370374-I1
07/29/2026
Permit issued — Full Demolition
Q01370374-I1-FD
07/19/2026
Objection resolved — Addressed
07/19/2026
Objection resolved — Addressed
07/19/2026
Objection resolved — Addressed
07/19/2026
Objection resolved — Addressed
06/10/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
05/30/2026
Special inspection requirement — Electric vehicle service equipment requirements
05/30/2026
Special inspection requirement — Interior lighting power
05/30/2026
Special inspection requirement — Maintenance information
05/30/2026
Special inspection requirement — Metering
05/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/29/2026
Objection raised — Other
05/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2026
Objection raised — Other
05/26/2026
Objection raised — Structural
05/26/2026
Objection raised — Structural
05/26/2026
Objection raised — Other
05/22/2026
Objection raised — Other
05/20/2026
Permit issued — Construction Fence
Q01402132-I1-FN
05/16/2026
Filed — Full Demolition
Q01370374-I1
05/16/2026
Filed — Alteration
INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS
Q01402132-I1
05/16/2026
Filed — New Building
Q01399880-S4
05/16/2026
Filed — New Building
Q01399880-S1
05/16/2026
Filed — New Building
Q01399880-I1
05/16/2026
Filed — New Building
Q01399880-S2
05/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
05/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/09/2026
Special inspection requirement — Heating Systems
05/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/09/2026
Special inspection requirement — Structural Steel - Welding
05/09/2026
Special inspection requirement — Subgrade Inspections
05/09/2026
Special inspection requirement — Final
05/09/2026
Special inspection requirement — Footing and Foundation
05/09/2026
Special inspection requirement — Energy Code Compliance Inspections
05/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/09/2026
Special inspection requirement — Structural Wood Frame
05/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/09/2026
Special inspection requirement — Concrete - Cast-In-Place
05/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/09/2026
Special inspection requirement — Structural Steel - Details
05/09/2026
Special inspection requirement — Fenestration areas
05/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/09/2026
Special inspection requirement — Air barrier — testing
05/09/2026
Special inspection requirement — Masonry
05/09/2026
Special inspection requirement — Insulation placement and R values
05/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/09/2026
Special inspection requirement — Air barrier - visual inspection
05/09/2026
Special inspection requirement — Permanent certificate
05/09/2026
Special inspection requirement — Ventilation and air distribution system
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedGREAT STONE GEN'L CONST*09/08/2026
DOB NOWEarth WorkPermit IssuedGREAT STONE GEN'L CONST*09/04/2026
DOB NOWEarth WorkPermit IssuedHOME STYLE IMPROVEMENTS *09/03/2026
DOB NOWStructuralPermit IssuedHOME STYLE IMPROVEMENTS *09/02/2026
DOB NOWFoundationPermit IssuedHOME STYLE IMPROVEMENTS *09/02/2026
DOB NOWFull DemolitionSigned-offHOME STYLE IMPROVEMENTS *07/29/2026
DOB NOWConstruction FencePermit IssuedHOME STYLE IMPROVEMENTS *05/20/2026
BIS—ISSUEDNA08/27/1996
1 project · most recent 05/16/2026
Fence
FiledStatusContractorScope
05/16/2026Permit IssuedHOME STYLE IMPROVEMENTS *Fence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/30/2026Electric vehicle service equipment requirements—energy_progress
05/30/2026Interior lighting power—energy_progress
05/30/2026Maintenance information—energy_progress
05/30/2026Metering—energy_progress
05/30/2026Duct leakage testing, insulation and design—energy_progress
05/16/2026Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
05/16/2026Subsurface Investigations (Borings/Test Pits)—special
05/09/2026Heating Systems—special
05/09/2026Structural Steel - High Strength Bolting—special
05/09/2026Structural Steel - Welding—special
05/09/2026Subgrade Inspections—special
05/09/2026Final—progress
05/09/2026Footing and Foundation—progress
05/09/2026Energy Code Compliance Inspections—progress
05/09/2026Fire-Resistance Rated Construction—progress
05/09/2026Structural Wood Frame—progress
05/09/2026Fire-Resistant Penetrations and Joints—special
05/09/2026Fenestration and door U-factor and product ratings—energy_progress
05/09/2026Concrete - Cast-In-Place—special
05/09/2026HVAC-R and service water piping design and insulation—energy_progress
05/09/2026Structural Steel - Details—special
05/09/2026Fenestration areas—energy_progress
05/09/2026HVAC-R and service water heating equipment—energy_progress
05/09/2026Air barrier — testing —energy_progress
05/09/2026Masonry—special
Latest 25 of 32.
Nothing on file for this building.