← Back
Two family converted from one family
64 ASHFORD STREET
BROOKLYN · BIN 3086997
💬 Discuss this project
1920Year Built
2.75Stories
B3Building Class
R4Zoning
2,197 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 3,656 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDTECH ENGINEERING DPC1012/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMPLEX DEVELOPMENT INCGeneral Contractor603/21/2026
C.W.C. FIRE SUPPRESSIONPlumbing207/08/2026
JAVELIN ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING63691012/23/2022
Building Lifecycle
All (55)Filed (10)Permit Issued (4)Signed Off (1)Violation (1)Inspection (9)Special Inspection (30)
12/27/2022
Signed off — Alteration
RENOV. OF EXTG. BLDG FOR REPAIRS DUE TO FIRE & TO REMOVE EXTG BATHRMS AND KITCHENS IN CEL & ATT. REPLACE WINDOWS, REPLACE PLASTER & INSUL. ON ROOF & EXTER. WALLS WITH FIRE AND/OR WATER DAMAGE ON ALL FLRS.. NO CHANGE TO USE, EGRESS & OCCUPANCY.
B00636065-I1
12/23/2022
Filed — Alteration
RENOV. OF EXTG. BLDG FOR REPAIRS DUE TO FIRE & TO REMOVE EXTG BATHRMS AND KITCHENS IN CEL & ATT. REPLACE WINDOWS, REPLACE PLASTER & INSUL. ON ROOF & EXTER. WALLS WITH FIRE AND/OR WATER DAMAGE ON ALL FLRS.. NO CHANGE TO USE, EGRESS & OCCUPANCY.
B00636065-P2
12/23/2022
Special inspection requirement — Sprayed fire-resistant materials
Luis Pichardo
12/23/2022
Special inspection requirement — Concrete - Cast-In-Place
Luis Pichardo
12/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
12/23/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Luis Pichardo
12/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
12/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
Luis Pichardo
12/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
12/23/2022
Special inspection requirement — Final
Luis Pichardo
12/23/2022
Special inspection requirement — Lighting controls
Luis Pichardo
12/23/2022
Special inspection requirement — Interior lighting power
Luis Pichardo
12/22/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Luis Pichardo
12/22/2022
Special inspection requirement — Concrete - Cast-In-Place
Luis Pichardo
12/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
12/22/2022
Special inspection requirement — Sprayed fire-resistant materials
Luis Pichardo
12/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
12/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
12/22/2022
Special inspection requirement — Final
Luis Pichardo
12/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
Luis Pichardo
12/22/2022
Special inspection requirement — Interior lighting power
Luis Pichardo
12/22/2022
Special inspection requirement — Lighting controls
Luis Pichardo
12/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
11/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Luis Pichardo
11/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
11/22/2022
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00636069-P3
11/22/2022
Filed — Alteration
PROPOSED INSTALLATION OF TWO NEW GAS FIRED HIGH EFFICIENCY CONDENSING BOILERS AND BASEBOARD HEATERS THROUGHOUT.
B00711803-P2
11/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
11/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Luis Pichardo
11/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
11/08/2022
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00636069-P2
11/08/2022
Filed — Alteration
PROPOSED INSTALLATION OF TWO NEW GAS FIRED HIGH EFFICIENCY CONDENSING BOILERS AND BASEBOARD HEATERS THROUGHOUT.
B00711803-P1
11/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
11/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
11/08/2022
Special inspection requirement — Maintenance information
Luis Pichardo
11/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Luis Pichardo
11/04/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/05/2022
Permit issued — General Construction
B00636065-I1-GC
04/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2022
Permit issued — Plumbing
B00711803-I1-PL
04/08/2022
Filed — Alteration
PROPOSED INSTALLATION OF TWO NEW GAS FIRED HIGH EFFICIENCY CONDENSING BOILERS AND BASEBOARD HEATERS THROUGHOUT.
B00711803-I1
01/06/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/21/2021
Permit issued — Plumbing
B00636069-I1-PL
12/17/2021
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00636069-P1
12/17/2021
Filed — Alteration
RENOV. OF EXTG. BLDG FOR REPAIRS DUE TO FIRE & TO REMOVE EXTG BATHRMS AND KITCHENS IN CEL & ATT. REPLACE WINDOWS, REPLACE PLASTER & INSUL. ON ROOF & EXTER. WALLS WITH FIRE AND/OR WATER DAMAGE ON ALL FLRS.. NO CHANGE TO USE, EGRESS & OCCUPANCY.
B00636065-P1
12/13/2021
Permit issued — General Construction
B00636065-I1-GC
11/30/2021
Filed — Alteration
RENOV. OF EXTG. BLDG FOR REPAIRS DUE TO FIRE & TO REMOVE EXTG BATHRMS AND KITCHENS IN CEL & ATT. REPLACE WINDOWS, REPLACE PLASTER & INSUL. ON ROOF & EXTER. WALLS WITH FIRE AND/OR WATER DAMAGE ON ALL FLRS.. NO CHANGE TO USE, EGRESS & OCCUPANCY.
B00636065-I1
11/30/2021
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00636069-I1
10/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCOMPLEX DEVELOPMENT INC05/05/2022
DOB NOWPlumbingSigned-offC.W.C. FIRE SUPPRESSION04/15/2022
DOB NOWPlumbingSigned-offC.W.C. FIRE SUPPRESSION12/21/2021
DOB NOWGeneral ConstructionSigned-offCOMPLEX DEVELOPMENT INC12/13/2021
2 projects · most recent 11/22/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/22/2022Signed-offC.W.C. FIRE SUPPRESSIONGas
11/22/2022Signed-offC.W.C. FIRE SUPPRESSIONGas, Water/Sanitary
2 projects · most recent 11/17/2022
General Wiring
FiledStatusContractorScope
11/17/2022Permit IssuedJAVELIN ELECTRIC INC3 meters, 1 new_meters
12/21/2021CompleteJAVELIN ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
12/23/2022Sprayed fire-resistant materialsLuis Pichardospecial
12/23/2022Concrete - Cast-In-PlaceLuis Pichardospecial
12/23/2022Fire-Resistant Penetrations and JointsLuis Pichardospecial
12/23/2022Mastic and Intumescent Fire-resistant CoatingsLuis Pichardospecial
12/23/2022Structural Stability – Alterations of existing buildingsLuis Pichardospecial
12/23/2022Fire-Resistance Rated ConstructionLuis Pichardoprogress
12/23/2022Energy Code Compliance InspectionsLuis Pichardoprogress
12/23/2022FinalLuis Pichardoprogress
12/23/2022Lighting controlsLuis Pichardoenergy_progress
12/23/2022Interior lighting powerLuis Pichardoenergy_progress
12/22/2022Mastic and Intumescent Fire-resistant CoatingsLuis Pichardospecial
12/22/2022Concrete - Cast-In-PlaceLuis Pichardospecial
12/22/2022Fire-Resistant Penetrations and JointsLuis Pichardospecial
12/22/2022Sprayed fire-resistant materialsLuis Pichardospecial
12/22/2022Structural Stability – Alterations of existing buildingsLuis Pichardospecial
12/22/2022Energy Code Compliance InspectionsLuis Pichardoprogress
12/22/2022FinalLuis Pichardoprogress
12/22/2022Fire-Resistance Rated ConstructionLuis Pichardoprogress
12/22/2022Interior lighting powerLuis Pichardoenergy_progress
12/22/2022Lighting controlsLuis Pichardoenergy_progress
11/29/2022Fire-Resistant Penetrations and JointsLuis Pichardospecial
11/29/2022HVAC-R and service water piping design and insulationLuis Pichardoenergy_progress
11/29/2022Energy Code Compliance InspectionsLuis Pichardoprogress
11/10/2022Energy Code Compliance InspectionsLuis Pichardoprogress
11/10/2022HVAC-R and service water piping design and insulationLuis Pichardoenergy_progress
Latest 25 of 45.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026B00636065-P1Request digital key ↗
08/31/2026B00636065-P2Request digital key ↗
08/31/2026B00636065-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026B00636069-P1Open ↗
09/02/2026B00636069-P1Open ↗
09/02/2026B00636069-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00636069-P1Open ↗
09/02/2026B00636069-I1Open ↗
09/01/2026B00636065-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026B00636065-P1Open ↗
08/31/2026B00636065-I1Open ↗
08/31/2026B00636065-P2Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/31/2026B00636065-P1Open ↗
08/31/2026B00636065-I1Open ↗
08/31/2026B00636065-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00636065-I1Open ↗