← Back
Two family frame
64 OLIVER PLACE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5031113
💬 Discuss this project
1970Year Built
2Stories
B2Building Class
R3XZoning
2,194 sfGross Floor Area
2Units
Two family frame · 4,200 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Electrical
Roof4p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/25/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/30/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01213620-I1
04/30/2025
Permit issued — Solar
S01213620-I1-SL
04/25/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01213620-I1
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/21/2025
Special inspection requirement — Final
Walid Abdulla
04/21/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/30/2025
1 project · most recent 04/25/2025
General Wiring
FiledStatusContractorScope
04/25/2025CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/21/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/21/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/21/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/21/2025FinalWalid Abdullaprogress
04/21/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01213620-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026S01213620-I1Open ↗
08/29/2026S01213620-I1Open ↗
08/29/2026S01213620-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S01213620-I1Open ↗
08/29/2026S01213620-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026S01213620-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026S01213620-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01213620-I1Open ↗