← Back
One story retail building
64 WEST 125 STREET
MANHATTAN · Harlem (South) · BIN 1053482
💬 Discuss this project
1962Year Built
1Stories
K1Building Class
C6-3Zoning
5,147 sfGross Floor Area
2Units
0 Open Violations
One story retail building · Owner of record: 64 WEST LLC · 5,147 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof36p · 2 filings · 20 docs
Floor 145p · 4 filings · 20 docs
Cellar44p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FATA ORGANIZATION1707/08/2026
JOSEPH J CULLEN TRUST703/21/2026
8203 3RD AVE PROPERTY304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUCID BUILDING ENGINEERING P.C.103/12/2026
NEW YORK DESIGN ARCHITECTS, LLP802/28/2024
LEON SKVIRSKY PE108/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARCHITECTS1603/21/2026
GREAT NECK SIGNS INC DBA MINEOLA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEMETRIOS NIONAKISElectrical703/21/2026
SJG CONSTRUCTION CORPGeneral Contractor403/21/2026
BENJAMIN DREBINElectrical203/21/2026
CASE PLUMBING LLCFire Protection107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
BEMUS, JR., JElectrical103/21/2026
FIVE TOWN NEON SIGN CO INScaffold107/08/2026
INNER CITY CONTRACTINGElectrical103/21/2026
RONALD TESTA, JR.Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957702/28/2024
Building Lifecycle
All (57)Filed (10)Permit Issued (6)Signed Off (5)Violation (1)Inspection (5)Special Inspection (30)
04/09/2026
Signed off — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01369998-I1
03/27/2026
Permit issued — Sign
M01369998-I1-SG
03/12/2026
Filed — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01369998-I1
03/11/2026
Special inspection requirement — Final
YUNHO LEE
10/04/2024
Signed off — Alteration
install signs
M00890899-I1
03/22/2024
Signed off — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE
M00940786-I1
03/19/2024
Signed off — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-I1
02/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Final
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
02/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
02/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Lighting controls
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Maintenance information
Giuseppe Anzalone
02/28/2024
Filed — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-P2
02/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Final
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Lighting controls
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Maintenance information
Giuseppe Anzalone
02/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
02/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
02/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
02/22/2024
Signed off — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-I1
02/19/2024
Filed — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-P1
02/05/2024
Special inspection requirement — Sprinkler Systems
HONG-CHIN MAA
01/19/2024
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-P3
12/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/22/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Permit issued — Plumbing
M00825670-I1-EW-SP
11/21/2023
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-P2
11/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
10/16/2023
Permit issued — Construction Fence
M00940786-I1-FN
10/11/2023
Filed — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE
M00940786-I1
09/06/2023
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-P1
08/31/2023
Permit issued — Sign
M00890899-I1-SG
08/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2023
Filed — Alteration
install signs
M00890899-I1
06/29/2023
Permit issued — Plumbing
M00825670-I1-PL
06/05/2023
Permit issued — General Construction
M00825766-I1-GC-CX
04/21/2023
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-I1
04/19/2023
Filed — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-I1
03/13/2002
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMAD SIGNS INC03/27/2026
DOB NOWPlumbingSigned-offS & L PLUMBING INC12/15/2023
DOB NOWConstruction FenceSigned-offSJG CONSTRUCTION CORP10/16/2023
DOB NOWSignSigned-offENRICO PASSARO08/31/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG06/29/2023
DOB NOWGeneral ConstructionSigned-offSJG CONSTRUCTION CORP06/05/2023
BISPLISSUEDA P PLUMBING&HEATING INC06/12/2024
BIS—ISSUEDFATA ORGANIZATION07/10/2023
BISEQISSUEDRONALD ANTHONY SCAGLIONE CONTRAC12/06/2001
BISOTISSUEDRONALD ANTHONY SCAGLIONE CONTRAC12/06/2001
BISPLISSUEDFIVE STAR P AND H CO, INC05/30/2001
BISEQISSUEDEMPIRE STATE DEVELOPMENT05/18/2001
BISOTISSUEDEMPIRE STATE DEVELOPMENT05/18/2001
BISPLISSUEDMARQUIS P & H CO., INC02/22/2001
BISEQISSUEDPRESTIGE CONSTRUCTION CO OF NASS02/20/2001
BISOTISSUEDPRESTIGE CONSTRUCTION CO NASSAU02/20/2001
8 projects · most recent 03/19/2026
General Wiring
FiledStatusContractorScope
03/19/2026Permit IssuedRIVIERA ELECT BROS CORPGeneral Wiring
03/11/2026Permit IssuedVOLTRON ELECTRIC LLC—
03/05/2026Pending PaymentACCURATE ELEC'L CORP.General Wiring
03/05/2026Pending PaymentACCURATE ELEC'L CORP.General Wiring
09/15/2025CompleteACCURATE ELEC'L CORP.General Wiring
06/25/2025CancelledACCURATE ELEC'L CORP.General Wiring
12/30/2024CompleteNION ELECTRIC CORPGeneral Wiring
04/08/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/11/2026FinalYUNHO LEEprogress
02/29/2024HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
02/29/2024Mechanical SystemsGiuseppe Anzalonespecial
02/29/2024Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
02/29/2024Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
02/29/2024Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
02/29/2024FinalGiuseppe Anzaloneprogress
02/29/2024Shutoff dampersGiuseppe Anzaloneenergy_progress
02/29/2024Interior lighting powerGiuseppe Anzaloneenergy_progress
02/29/2024HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
02/29/2024Ventilation and air distribution systemGiuseppe Anzaloneenergy_progress
02/29/2024HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
02/29/2024Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
02/29/2024Lighting controlsGiuseppe Anzaloneenergy_progress
02/29/2024Maintenance informationGiuseppe Anzaloneenergy_progress
02/26/2024Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
02/26/2024Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
02/26/2024Mechanical SystemsGiuseppe Anzalonespecial
02/26/2024Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
02/26/2024FinalGiuseppe Anzaloneprogress
02/26/2024Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
02/26/2024Lighting controlsGiuseppe Anzaloneenergy_progress
02/26/2024Maintenance informationGiuseppe Anzaloneenergy_progress
02/26/2024HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
02/26/2024HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
Latest 25 of 33.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026M00890899-I1Request digital key ↗
08/29/2026M00940786-I1Request digital key ↗
08/28/2026M00825670-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION17
11/21/2024123917869Open ↗
11/19/2024123917869Open ↗
11/14/2024103130434Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION2
06/12/2024103019948Open ↗
07/10/2023123917869Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/10/2023123917869Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
02/22/2024123917869Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/16/2024123917869Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026M00890899-I1Open ↗
08/29/2026M00940786-I1Open ↗
08/28/2026M00825670-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/30/2026M01369998-I1Open ↗
08/27/2026M00825766-I1Open ↗
08/27/2026M00825766-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M00825670-P1Open ↗
08/27/2026M00825766-I1Open ↗
08/26/2026M00825670-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/09/2024103019948Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
06/15/2023123917869Open ↗
03/27/2023123917869Open ↗
▸BISSTREET TREE SIGNOFF1
02/22/2024123917869Open ↗
▸Environmental & Asbestos9
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00825766-I1Open ↗
08/13/2026M00825670-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026M00825670-I1Open ↗
08/13/2026M00825766-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026M00825670-I1Open ↗
08/13/2026M00825766-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
02/22/2024123917869Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
07/07/2023123917869Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026M00890899-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/22/2024103019948Open ↗
09/25/2024103019948Open ↗
09/25/2024103019948Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
11/22/2024103019948Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
11/22/2024103019948Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE4
09/05/2023123917869Open ↗
08/30/2023123917869Open ↗
05/02/2023123917869Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
06/12/2024103019948Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/25/2024103019948Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
06/15/2023123917869Open ↗
03/27/2023123917869Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/10/2025123917869Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION7
11/27/2024123917869Open ↗
07/02/2024103019948Open ↗
04/15/2024103019948Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET1
03/24/2023123917869Open ↗
▸BISBOROUGH INTAKE FORM1
06/12/2024103019948Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/15/2023123917869Open ↗
06/15/2023123917869Open ↗