← Back
Elevator cooperative
640 WEST 139 STREET
MANHATTAN · Hamilton Heights-Sugar Hill · BIN 1079499
💬 Discuss this project
1910Year Built
6Stories
D4Building Class
R8Zoning
76,250 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized264 Open Violations 233 unresolved · 31 paperwork only ▸FISP: UNSAFE
Elevator cooperative · Owner of record: 618 RIVERSIDE DRIVE OWNERS INC. · 12,792 sf lot · 5.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 6Under Construction12p · 2 filings · 12 docs
Floor 5Under Construction16p · 3 filings · 20 docs
Floor 4Under Construction16p · 3 filings · 20 docs
Floor 3Under Construction21p · 5 filings · 20 docs
Floor 2Under Construction19p · 4 filings · 20 docs
Floor 1Under Construction15p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
618 RIVERSIDE DRIVE OWNERS1003/22/2026
NY MARKET REAL ESTATE809/03/2026
RELIABLE ENTERPRISES607/08/2026
GUIDANCE REALTY509/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMMANUEL KAVRAKIS ARCHITECTS LLC706/17/2026
ST DESIGN & CONSULTING INC.104/12/2025
ENTHINK ENGINEERS LLC104/17/2023
ARQUITECTURA VARELA104/12/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH ARSENIOElectrical803/21/2026
ARCHITECTURAL MATERIAL LLGeneral Contractor706/27/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
VALID CONTRACTING CORPGeneral Contractor303/21/2026
OSSO PLUMBING & HEATINGPlumbing207/03/2026
LARA CONSTRUCTION INCGeneral Contractor109/03/2026
FERKO PLUMBING & HEATINGPlumbing107/08/2026
ARSENIO NYC ELECTRICAL INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413406/17/2026
ARCO ENGINEERING PC3769205/28/2025
AA BUILDING & INSPECTION1519104/12/2023
BUTTERFIELD & O'CONNOR4189104/12/2023
Building Lifecycle
All (111)Filed (10)Permit Issued (10)Signed Off (4)Facade (FISP) (11)Violation (60)Inspection (4)Objection (2)Special Inspection (10)
09/02/2026
Permit issued — General Construction
M01128249-I1-GC
07/01/2026
Permit issued — Plumbing
M01195231-I1-PL
06/17/2026
Filed — Alteration
5 new 3pc bathrooms in apartment APT# 7, 27, 37, 47, 57 AND 4 new kitchens in APT #27,37,47,57 AND gas riser removal in APT # 27,37,47,57
M01195231-P1
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
EMMANUEL KAVRAKIS
06/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALLENDE MATOS
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALLENDE MATOS
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
EMMANUEL KAVRAKIS
06/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Filed — Alteration
5 new 3pc bathrooms in apartment APT# 7, 27, 37, 47, 57 AND 4 new kitchens in APT #27,37,47,57 AND gas riser removal in APT # 27,37,47,57
M01195231-I1
05/01/2026
Permit issued — Plumbing
M01207781-I1-PL
04/30/2026
Violation issued (ECB, open)
Construction
04/30/2026
Violation issued (ECB, open)
Construction
04/13/2026
Permit issued — General Construction
M01128249-I1-GC
04/01/2026
Cycle 10 facade report submitted
04/01/2026
Cycle 10 facade report signed — UNSAFE
03/16/2026
Cycle 10 facade inspection completed
01/27/2026
Objection resolved — Addressed
05/28/2025
Filed — Alteration
M01128249-P1
04/21/2025
Objection raised — Scope
04/16/2025
Violation issued (ECB, open)
Construction
04/12/2025
Filed — Alteration
Application filed to show plumbing work on apt 27 to comply with ECB violation #39143073M and remove the stop work order as per plan.
M01207781-I1
04/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALLENDE MATOS
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
EMMANUEL KAVRAKIS
03/27/2025
Violation issued (ECB, closed)
Unknown
03/27/2025
Violation issued (ECB, closed)
Unknown
03/27/2025
Violation issued (ECB, closed)
Construction
03/27/2025
Violation issued (ECB, closed)
Construction
03/27/2025
Violation issued (ECB, open)
Construction
03/27/2025
Violation issued (ECB, closed)
Construction
03/17/2025
Permit issued — General Construction
M01128249-I1-GC
02/26/2025
Signed off — Alteration
M01026638-I1
02/26/2025
Signed off — Alteration
PROPOSED TO RENOVATE (2) BATHROOM AND (1) KITCHEN NW/NEW FINISHES AND MINOR WORK AT NON BEARING WALL. NO CHANGE OF USE, EGRESS, AND OCCUPANCY
M01001631-I1
02/22/2025
Filed — Alteration
M01128249-I1
10/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2024
Signed off — Alteration
M00854177-I1
08/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2024
Filed — Alteration
M01026638-P1
05/13/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00859818-I1
05/01/2024
Permit issued — Plumbing
M01026638-I1-PL
04/25/2024
Violation issued (ECB, open)
Local Law
04/04/2024
Filed — Alteration
M01026638-I1
02/21/2024
Permit issued — General Construction
M01001631-I1-GC
02/12/2024
Filed — Alteration
PROPOSED TO RENOVATE (2) BATHROOM AND (1) KITCHEN NW/NEW FINISHES AND MINOR WORK AT NON BEARING WALL. NO CHANGE OF USE, EGRESS, AND OCCUPANCY
M01001631-I1
02/06/2024
Special inspection requirement — Final
EMMANUEL KAVRAKIS
11/29/2023
Permit issued — Sidewalk Shed
M00859818-I1-SH
05/11/2023
Permit issued — General Construction
M00854177-I1-GC
04/17/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00859818-I1
04/17/2023
Permit issued — Sidewalk Shed
M00859818-I1-SH
04/12/2023
Filed — Alteration
M00854177-I1
04/03/2023
Special inspection requirement — Masonry
BRIAN T. O'CONNOR
04/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
04/03/2023
Special inspection requirement — Final
Vicente Varela
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2022
Violation issued (ECB, open)
Local Law
07/23/2021
Violation issued (ECB, open)
Local Law
06/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/19/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLARA CONSTRUCTION INC09/02/2026
DOB NOWPlumbingPermit IssuedOSSO PLUMBING & HEATING07/01/2026
DOB NOWPlumbingSigned-offOSSO PLUMBING & HEATING05/01/2026
DOB NOWGeneral ConstructionPermit IssuedARCHITECTURAL MATERIAL LL04/13/2026
DOB NOWGeneral ConstructionPermit IssuedARCHITECTURAL MATERIAL LL03/17/2025
DOB NOWPlumbingSigned-offFERKO PLUMBING & HEATING05/01/2024
DOB NOWGeneral ConstructionSigned-offARCHITECTURAL MATERIAL LL02/21/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC11/29/2023
DOB NOWGeneral ConstructionSigned-offVALID CONTRACTING CORP05/11/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC04/17/2023
BISOTISSUEDVALID CONTRACTING CO01/04/2011
BISOTISSUEDVOLVO CONSTRUCTION COMAPNY04/23/2007
BISEQISSUEDSTONELEDGE SCAFF. CORP .03/05/2007
BISOTISSUEDSKY TRACK BUILDER INC.02/15/2007
BISEQISSUEDSTONELEDGE SCAFF. CORP .01/09/2007
BISEQISSUEDSTONELEDGE SCAFF. CORP .01/25/2006
BISEQISSUEDSTONELEDGE SCAFF. CORP .03/09/2005
2 projects · most recent 06/17/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/17/2026Permit IssuedOSSO PLUMBING & HEATINGGas, Water/Sanitary
04/12/2025Signed-offOSSO PLUMBING & HEATINGWater/Sanitary
9 projects · most recent 02/09/2026
General Wiring
FiledStatusContractorScope
02/09/2026Permit IssuedARSENIO NYC ELECTRICAL INGeneral Wiring
02/09/2026Permit IssuedARSENIO NYC ELECTRICAL INGeneral Wiring
02/09/2026Permit IssuedARSENIO NYC ELECTRICAL INGeneral Wiring
02/09/2026Permit IssuedARSENIO NYC ELECTRICAL INGeneral Wiring
02/09/2026Permit IssuedARSENIO NYC ELECTRICAL INGeneral Wiring
08/27/2025Permit IssuedARSENIO NYC ELECTRICAL IN—
08/27/2025Permit IssuedARSENIO NYC ELECTRICAL INGeneral Wiring
08/27/2025Permit IssuedARSENIO NYC ELECTRICAL INGeneral Wiring
04/18/2023CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/17/2026Energy Code Compliance InspectionsEMMANUEL KAVRAKISprogress
06/17/2026Tenant Protection Plan ComplianceALLENDE MATOSspecial
06/16/2026Tenant Protection Plan ComplianceALLENDE MATOSspecial
06/16/2026Energy Code Compliance InspectionsEMMANUEL KAVRAKISprogress
04/12/2025Tenant Protection Plan ComplianceALLENDE MATOSspecial
04/08/2025Energy Code Compliance InspectionsEMMANUEL KAVRAKISprogress
02/06/2024FinalEMMANUEL KAVRAKISprogress
04/03/2023MasonryBRIAN T. O'CONNORspecial
04/03/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
04/03/2023FinalVicente Varelaprogress
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/31/2026M00854177-I1Request digital key ↗
08/31/2026M00859818-I1Request digital key ↗
08/28/2026M01001631-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
10/12/2012121396328Open ↗
08/24/2010120450289Open ↗
06/21/2010120387438Open ↗
▸BISWORK PERMIT APPLICATION2
01/05/2011120450289Open ↗
06/23/2010120387438Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/31/2026M00859818-I1Open ↗
08/27/2026M01026638-P1Open ↗
08/27/2026M01026638-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026M01195231-P1Open ↗
09/01/2026M01001631-I1Open ↗
08/28/2026M00854177-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M01195231-P1Open ↗
08/28/2026M00854177-I1Open ↗
08/28/2026M00854177-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/05/2013121396328Open ↗
10/12/2012121396328Open ↗
08/24/2010120450289Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/21/2010120387438Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/21/2010120387438Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026M01026638-I1Open ↗
08/27/2026M01026638-P1Open ↗
08/23/2026M01128249-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/24/2010120450289Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/21/2010120387438Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/12/2012121396328Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/05/2013121396328Open ↗
10/12/2012121396328Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/05/2013121396328Open ↗
06/21/2010120387438Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/24/2010120450289Open ↗
06/21/2010120387438Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/05/2013121396328Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
08/05/2013121396328Open ↗
10/12/2012121396328Open ↗
08/24/2010120450289Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
10/12/2012121396328Open ↗
08/24/2010120450289Open ↗
06/21/2010120387438Open ↗