DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB12/16/2016VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
ECB12/17/2008VIOLATING CONDITIONS: 51,50A,50B,50C 51-SHUT BOILER PICKED UP 492 PP MILLION CARBON MONOXDP OUTSIDE DRAFT-O-STAT 50A- BOILER ROOM NOT SEALED. 50B- GAUGE GLAS LEAKING,50C-NEEDS FUSABLE LINK ON FRESH AIR.Nothing owed — awaiting certificate of correction
ECB01/19/200750A,50B FULTON V.T.BOILER,6HP,NB94085,GAS,2003.50A-PRIMARY & SECONDARYBLOW DOWN VALVES LEAKING. REPLACE BOTH DRAIN VALVES.50B.SCREW THREADS IN PLACE AT THE OUTLET END OF THE SAFETY VALVE DISCHARGE PIPE.Nothing owed — awaiting certificate of correction