Two family converted from one family
6408 16 AVENUE
BROOKLYN · BIN 3133391
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R5Zoning
1,732 sfGross Floor Area
2Units
Two family converted from one family · 1,476 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
Plumbing
Basement1p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/28/2022$1.1M—Private party → Private party$635/sf building
10/18/2018$950K—Private party → Private party$548/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JONG HAE CHANG ARCHITECT208/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLUSHING PLUMBING CORPPlumbing407/08/2026
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (2)
08/04/2022
Signed off — Alteration
FILING THIS APPLICATION CAP & REMOVE 1 BOILER,TO RELOCATE 2 EXIST.GAS METER TO OSP, RELOCATE 1 EXIST. HWH AND INSTALL 1 NEW BOILER ON BASEMENT,NO CHANGE TO USE,EGRESS AND OCCUPANCY.
B00361889-I1
08/18/2020
Special inspection requirement — Energy Code Compliance Inspections
Jong Hae Kim
08/18/2020
Special inspection requirement — HVAC insulation and sealing
Jong Hae Kim
08/17/2020
Objection resolved — Addressed
08/17/2020
Objection resolved — Addressed
08/12/2020
Objection raised — Scope
08/12/2020
Objection raised — Mechanical
08/11/2020
Filed — Alteration
FILING THIS APPLICATION CAP & REMOVE 1 BOILER,TO RELOCATE 2 EXIST.GAS METER TO OSP, RELOCATE 1 EXIST. HWH AND INSTALL 1 NEW BOILER ON BASEMENT,NO CHANGE TO USE,EGRESS AND OCCUPANCY.
B00361889-P1
07/20/2020
Permit issued — Plumbing
B00361889-I1-PL
07/07/2020
Filed — Alteration
FILING THIS APPLICATION CAP & REMOVE 1 BOILER,TO RELOCATE 2 EXIST.GAS METER TO OSP, RELOCATE 1 EXIST. HWH AND INSTALL 1 NEW BOILER ON BASEMENT,NO CHANGE TO USE,EGRESS AND OCCUPANCY.
B00361889-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLUSHING PLUMBING CORP07/20/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/18/2020Energy Code Compliance InspectionsJong Hae Kimprogress
08/18/2020HVAC insulation and sealing Jong Hae Kimenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00361889-I1Request digital key ↗
08/15/2026B00361889-P1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00361889-I1Open ↗
08/13/2026B00361889-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00361889-I1Open ↗
09/01/2026B00361889-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026B00361889-I1Open ↗
08/13/2026B00361889-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00361889-I1Open ↗
08/13/2026B00361889-P1Open ↗