Floor 481p · 1 filing · 20 docs
Plumbing
Sprinkler work as shown on plans.
On file for this job
34 documents · 1 drawing sheet
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43Under Construction9p · 1 filing · 6 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
WORK FILED FOR COMBINATION OF UNITS 43A AND 43H AND MINOR RENOVATION OF UNIT. RELOCATION AND REPLACEMENT OF FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
6 documents
Floor 42Under Construction9p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
AT 42ND FLOOR APT 42A- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND CEILINGS, WITH RELATED ELECTRICAL WORK.
On file for this job
13 documents
REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (2 LAV, 2 W/C, 1 SHOWER); CAP & REMOVE (1 TUB, 1 URINAL); RELOCATE PLUMBING FIXTURES WITH NEW (1 SINK, 1 DW, 1 W/M); INSTALL NEW PLUMBING FIXTURES (1 SHOWER) AT APT 42C ON THE 42ND FLOOR
On file for this job
16 documents · 3 drawing sheets
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36Under Construction7p · 1 filing · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PROPOSED ALTERATIONS TO AN EXISTING CONDOMINIUM IN AN EXISTING BUILDING- THE OLYMPIC TOWER. APT # 36D. REPLACEMENT OF EXISTING PLUMBING FIXTURES, REPLACEMENT OFKITCHEN APPLIANCES.
On file for this job
20 documents
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 301p · 1 filing · 3 docs
Plumbing
Scope of work will include replacement of plumbing fixtures as indicated on plans. No change in occupancy ,egress or use.
On file for this job
3 documents · 1 drawing sheet
Floor 29
Floor 284p · 1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
NTERIOR WORK AT APARTMENT # 28A ON THE 28TH FLOOR. WORK TO INCLUDE NON-STRUCTURAL DEMOLITION, MINOR INTERIOR PARTITION WORK AND ASSOCIATED FINISHES. ALL AS PER PLANS SUBMITTED, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents
Floor 27Under Construction4p · 2 filings · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION TO EXISTING APARTMENT 27H. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this job
7 documents
PLUMBING WORK ASSOCIATED WITH RENOVATION OF APT 27H, INCLUDING REPLACEMENT/RELOCATION OF TOILETS, LAVS, SHOWERS, TUB, SINK, AND WASHER/DRYER AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
3 documents
Floor 26Under Construction6p · 1 filing · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Replace some existing plumbing fixtures with new, and install some new. All as per accompanying plans. No chance in use or occupancy.
On file for this job
8 documents
Floor 25Under Construction6p · 1 filing · 7 docs
Architecture
Issued Permit Scope
General Construction
Renovate (3) existing bathrooms in apartment #25D. No change in use, egress or occupancy.
On file for this job
7 documents
Floor 24Under Construction5p · 1 filing · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
THE PROPOSED WORK INCLUDES THE REMOVAL AND REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES AND ASSOCIATED PLUMBING SUPPLY AND WASTE PIPING. THE PROJECT ALSO INCLUDES THE INSTALLATION OF PLUMBING LEAK DETECTION SYSTEMS AND RECESSED WASHER SUPPLY LINE
On file for this job
7 documents
Floor 23
Floor 22
Floor 2114p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Structural work as shown on plans.
On file for this job
47 documents · 11 drawing sheets
INTERIOR RENOVATION OF APARTMENT 27F ON THE 27TH FLOOR, NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this job
14 documents · 1 drawing sheet
Plumbing work as shown on plans. 10th Floor Marketing/11th Floor Construction, 21st Floor
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 20
Floor 19
Floor 182p · 1 filing · 4 docs
Architecture
Installation of non load bearing partitions as per plans filed herewith.
On file for this job
4 documents · 2 drawing sheets
Floor 177p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Removal of HVAC system as per plans filed herewith. No change in use egress or occupancy.
On file for this job
12 documents · 1 drawing sheet
Structural renovation to provide new stair and double height public assembly space as per plans.
On file for this job
11 documents · 1 drawing sheet
Filing herewith for 7 mechanical units as per plans filed herewith
On file for this job
43 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 167p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Removal of HVAC system as per plans filed herewith. No change in use egress or occupancy.
On file for this job
12 documents · 1 drawing sheet
Structural renovation to provide new stair and double height public assembly space as per plans.
On file for this job
11 documents · 1 drawing sheet
Filing herewith for 7 mechanical units as per plans filed herewith
On file for this job
43 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1511p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Removal of HVAC system as per plans filed herewith. No change in use egress or occupancy.
On file for this job
12 documents · 2 drawing sheets
Structural renovation to provide new stair and double height public assembly space as per plans.
On file for this job
11 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use egress or occupancy.
On file for this job
23 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 14
Floor 13
Floor 12
Floor 1120p · 8 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbing
Plumbing work as shown on plans. 10th Floor Marketing/11th Floor Construction, 21st Floor
On file for this job
3 documents · 1 drawing sheet
Installation of non bearing partitions as per plans filed herewith.
On file for this job
19 documents · 12 drawing sheets
Sprinkler work as shown on plans. 10th Floor Marketing/11th Floor Construction, 21st Floor
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 10
Floor 91p · 1 filing · 20 docs
Fire Protection
Sprinkler work as shown on plans.
On file for this job
34 documents · 1 drawing sheet
Floor 8
Floor 7
Floor 61p · 1 filing · 6 docs
DM
REPLACEMENT OF TWO CONDENSER WATER PUMPS FOR THE EXISTING CHILLED WATER SYSTEM.
On file for this job
6 documents · 1 drawing sheet
Floor 51p · 1 filing · 20 docs
Architecture
Structural work as shown on plans.
On file for this job
47 documents · 1 drawing sheet
Floor 4
Floor 3
Floor 2Under Construction2p · 1 filing · 3 docs
ArchitectureGeneral
Issued Permit Scope
General Construction
INTERIOR ALTERATIONS OF EXISTING 2ND FLOOR COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this job
3 documents · 1 drawing sheet
Floor 118p · 11 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionMechanicalPlumbingStructural
INTERIOR RENOVATION WORK TO INCLUDE THE REMOVAL OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, DOORS, CEILING, FINISHES, FIXTURES AND RELATED CONSTRUCTION IN RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this job
5 documents · 7 drawing sheets
MECHANICAL WORK RELATED TO THE REMODELING OF AN EXISTING RETAIL SPACE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this job
3 documents · 1 drawing sheet
RENOVATION TO EXISTING STORE (TAG HEUER) MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine2p · 3 filings · 13 docs
DMMechanicalPlumbing
Plumbing work as shown on plans. 10th Floor Marketing/11th Floor Construction, 21st Floor
On file for this job
3 documents · 1 drawing sheet
Mechanical work as shown on plans. 10th Floor Marketing/11th Floor Construction, 21st Floor
On file for this job
6 documents · 1 drawing sheet
Sprinkler work as shown on plans. 10th Floor Marketing/11th Floor Construction, 21st Floor
On file for this job
4 documents · 1 drawing sheet
Cellar15p · 6 filings · 20 docs
ArchitectureDMFire Protection
Issued Permit Scope
General Construction
INTERIOR RENOVATION OF EXISTING CELLAR SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this job
6 documents
HUBLOT-- PLUMIBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION.
On file for this job
28 documents · 2 drawing sheets
HUBLOT-- MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH RETAIL RENOVATION.
On file for this job
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Sub-Cellar1p · 1 filing · 20 docs
Plumbing
Sprinkler work as shown on plans.
On file for this job
34 documents · 1 drawing sheet
BasementUnder Construction3p · 3 filings · 16 docs
Fire ProtectionMechanicalPlumbing
PLUMBING SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
7 documents · 1 drawing sheet
SPRINKLER SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
6 documents · 1 drawing sheet
Sub-BasementUnder Construction5p · 1 filing · 3 docs
Fire Protection
Issued Permit Scope
Sprinklers
SPRINKLER SYSTEM MODIFICATION AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this job
3 documents