ECB02/02/2006FAILURE TO SAFELY AND PROPERLY REMOVE MATERIAL/DEBRIS FROM CONSTRUCTION SITE. NOTED: SCAFFOLDING PIPE, RUSTED AND SHARD METAL MESH, AND WOOD W/PROTRUDING NAILS THROWN IN FRONT YARD BLOCKING EGRESS AND HAZARDOUSNothing owed — awaiting certificate of correction
Two family frame · 1,120 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.