← Back
Over six families without stores
641 WEST 169 STREET
MANHATTAN · Washington Heights (South) · BIN 1063398
💬 Discuss this project
1922Year Built
6Stories
C1Building Class
R8Zoning
38,058 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized0 Open Violations
Over six families without stores · Owner of record: ROYAL CHARTER PROPERTIES, INC. · 8,658 sf lot · 4.4 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROYAL CHARTER PROPERTIES, INC.3107/08/2026
SATO CONSTRUCTION103/22/2026
OWNER OF 641 W 169 ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MG2106/01/2023
NEW YORK ENGINEERING ASSOC., P.C.603/03/2022
SCALAR ARCHITECTURE PC208/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING203/21/2026
NEW YORK ENGINEERING ASSOCIATES P1203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor707/08/2026
HYPER STRUCTURES GRP INCGeneral Contractor603/21/2026
A & C HEATING SERVICES INGeneral Contractor303/21/2026
A & C HTG SERVICES, INCPlumbing207/08/2026
HERMAN TEXEIRAElectrical103/21/2026
LINMAR CONSTRUCTION CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOWARD L ZIMMERMAN ARCHIT1712106/01/2023
NEW YORK ENGINEERING ASSO851603/03/2022
Building Lifecycle
All (117)Filed (9)Permit Issued (12)Signed Off (5)Violation (60)Inspection (1)Special Inspection (30)
08/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2025
Permit issued — General Construction
M00871945-I1-GC
11/01/2024
Permit issued — General Construction
M00871945-I1-GC
05/02/2024
Permit issued — General Construction
M00871945-I1-GC
06/01/2023
Filed — Alteration
M00871945-I1
06/07/2022
Signed off — Alteration
INSTALL EXTERNAL CHIMNEY STACK
M00461900-S1
06/07/2022
Signed off — Alteration
INSTALL EXTERNAL CHIMNEY STACK
M00461900-I1
06/07/2022
Signed off — Alteration
INSTALL NEW HOT WATER HEATER AND TWO STORAGE TANKS. INSTALL NEW GAS SERVICE, METER AND PIPING.
M00461877-I1
03/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/04/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
03/04/2022
Special inspection requirement — Energy Code Compliance
LOUIS ARENA
03/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
03/03/2022
Filed — Alteration
INSTALL NEW HOT WATER HEATER AND TWO STORAGE TANKS. INSTALL NEW GAS SERVICE, METER AND PIPING.
M00461877-P2
03/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
03/02/2022
Special inspection requirement — Energy Code Compliance
LOUIS ARENA
03/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
03/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
03/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
03/02/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
02/22/2022
Permit issued — Boiler Equipment
M00461900-I1-BE
02/02/2022
Permit issued — Mechanical Systems
M00461900-S1-MS
01/28/2022
Permit issued — Plumbing
M00461877-I1-PL
11/02/2021
Filed — Alteration
INSTALL EXTERNAL CHIMNEY STACK
M00461900-S1
10/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/28/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
10/28/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
10/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/26/2021
Filed — Alteration
INSTALL EXTERNAL CHIMNEY STACK
M00461900-P1
10/22/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00204149-I1
10/22/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00204150-I1
09/17/2021
Filed — Alteration
INSTALL NEW HOT WATER HEATER AND TWO STORAGE TANKS. INSTALL NEW GAS SERVICE, METER AND PIPING.
M00461877-P1
08/19/2021
Special inspection requirement — Chimneys and vents
LOUIS ARENA
08/18/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
08/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/18/2021
Special inspection requirement — Energy Code Compliance
LOUIS ARENA
08/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/18/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
08/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/18/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
08/18/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
08/18/2021
Special inspection requirement — Final
LOUIS ARENA
04/13/2021
Permit issued — Boiler Equipment
M00461900-I1-BE
04/08/2021
Permit issued — Plumbing
M00461877-I1-PL
04/02/2021
Filed — Alteration
INSTALL EXTERNAL CHIMNEY STACK
M00461900-I1
04/02/2021
Filed — Alteration
INSTALL NEW HOT WATER HEATER AND TWO STORAGE TANKS. INSTALL NEW GAS SERVICE, METER AND PIPING.
M00461877-I1
09/26/2020
Violation issued (ECB, closed)
Construction
08/17/2020
Permit issued — Supported Scaffold
M00204150-I1-SF
08/14/2020
Permit issued — Sidewalk Shed
M00204149-I1-SH
08/14/2019
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00204150-I1
08/14/2019
Permit issued — Sidewalk Shed
M00204149-I1-SH
08/14/2019
Permit issued — Supported Scaffold
M00204150-I1-SF
08/13/2019
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00204149-I1
08/01/2019
Special inspection requirement — Final
JULIO SALCEDO-FERNANDEZ
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2010
Violation issued (HPD, closed)
A
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLINMAR CONSTRUCTION07/22/2025
DOB NOWGeneral ConstructionPermit IssuedHYPER STRUCTURES GRP INC11/01/2024
DOB NOWGeneral ConstructionPermit IssuedHYPER STRUCTURES GRP INC05/02/2024
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC02/22/2022
DOB NOWMechanical SystemsSigned-offA & C HEATING SERVICES IN02/02/2022
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP01/28/2022
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC04/13/2021
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP04/08/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC08/17/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC08/14/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC08/14/2019
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC08/14/2019
BISOTISSUEDSATO CONSTRUCTION CO.INC12/20/2021
BISOTISSUEDSATO CONSTRUCTION CO.INC12/22/2020
BISOTISSUEDSATO CONSTRUCTION CO.INC10/15/2019
BISEQISSUEDJERRICK ASSOCIATES INC04/08/2008
BISPLISSUEDILG MECH SERVICES, INC08/26/2005
BISFBISSUEDCOMMERCIAL COMBUSTION SER01/27/2004
2 projects · most recent 08/30/2021
Boiler Controls
FiledStatusContractorScope
08/30/2021CompleteTEXEIRA ELECTRIC CORPBoiler Controls
08/02/2019CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
03/04/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/04/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/04/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/04/2022Maintenance informationLOUIS ARENAenergy_progress
03/04/2022Energy Code ComplianceLOUIS ARENAprogress
03/04/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/02/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/02/2022Energy Code ComplianceLOUIS ARENAprogress
03/02/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/02/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
03/02/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
03/02/2022Maintenance informationLOUIS ARENAenergy_progress
10/28/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/28/2021Heating SystemsLOUIS ARENAspecial
10/28/2021Maintenance informationLOUIS ARENAenergy_progress
10/28/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/19/2021Chimneys and ventsLOUIS ARENAspecial
08/18/2021Mechanical SystemsLOUIS ARENAspecial
08/18/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/18/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/18/2021Energy Code ComplianceLOUIS ARENAprogress
08/18/2021HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/18/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/18/2021Maintenance informationLOUIS ARENAenergy_progress
08/18/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
Latest 25 of 30.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026M00461877-I1Request digital key ↗
09/02/2026M00461877-P2Request digital key ↗
08/15/2026M00461877-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/03/2026M00461900-P1Request digital key ↗
09/03/2026M00461900-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/03/2026M00461900-S1Request digital key ↗
08/31/2026M00871945-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00204149-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00204150-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
11/29/2022140853271Open ↗
11/09/2022140853271Open ↗
06/28/2019140853271Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
12/24/2019140853271Open ↗
10/15/2019140853271Open ↗
04/08/2008110129441Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026M00461900-I1Open ↗
09/23/2026M00461900-I1Open ↗
09/23/2026M00461900-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00204150-I1Open ↗
09/03/2026M00461900-P1Open ↗
09/03/2026M00461900-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00461900-I1Open ↗
09/02/2026M00461900-P1Open ↗
09/01/2026M00461877-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/08/2016122702897Open ↗
06/08/2016122702897Open ↗
07/15/2013110129441Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/28/2019140853271Open ↗
06/08/2016122702897Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/08/2016122702897Open ↗
04/07/2008110129441Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/28/2019140853271Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/28/2019140853271Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/07/2008110129441Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
09/05/2026M00204150-I1Open ↗
08/13/2026M00204149-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
06/28/2019140853271Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00461900-P1Open ↗
09/03/2026M00461900-I1Open ↗
09/03/2026M00461900-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/07/2008110129441Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/28/2019140853271Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/30/2022140853271Open ↗
06/28/2019140853271Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00461900-I1Open ↗
08/13/2026M00461877-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/08/2016122702897Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/28/2019140853271Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/30/2022140853271Open ↗
▸BISNYCECC ANALYSIS1
06/28/2019140853271Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00461900-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/30/2022140853271Open ↗
11/30/2022140853271Open ↗
11/29/2022140853271Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/05/2022140853271Open ↗
07/15/2013110129441Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/07/2008110129441Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/30/2022140853271Open ↗
06/28/2019140853271Open ↗
06/08/2016122702897Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
06/08/2016122702897Open ↗
04/07/2008110129441Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/28/2019140853271Open ↗