Two family frame
642 GLENMORE AVENUE
BROOKLYN · BIN 3088851
💬 Discuss this project
1899Year Built
2Stories
B2Building Class
R5BZoning
1,000 sfGross Floor Area
2Units
8 Open Violations 5 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family frame · Owner of record: GLENMORE ASSETS LLC · 2,250 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionCivil
Roof4p · 2 filings · 20 docs
Bulkhead2p · 1 filing · 18 docs
Cellar2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2023$170K—Private party → GLENMORE ASSETS LLC$170/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC604/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING1203/21/2026
Building Lifecycle
All (90)Filed (6)Violation (10)Objection (44)Special Inspection (30)
07/24/2025
Objection resolved — Resolved
07/24/2025
Objection resolved — Resolved
04/22/2025
Objection resolved — Addressed
04/21/2025
Objection raised — Cost
04/21/2025
Objection raised — Fire_Protection
04/21/2025
Objection raised — Fire_Protection
04/21/2025
Objection raised — Fire_Protection
04/21/2025
Objection raised — Fire_Protection
04/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing worktype for the enlargement and conversion to a 4-family dwelling as per the submitted drawing.
B01169553-S3
04/07/2025
Objection raised — Cost
04/05/2025
Objection resolved — Addressed
04/05/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
03/14/2025
Special inspection requirement — Sprinkler Systems
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Zoning
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Fire_Protection
02/21/2025
Objection raised — Scope
02/21/2025
Objection raised — Energy
02/21/2025
Objection raised — Admin
02/21/2025
Objection raised — Plumbing
02/21/2025
Objection raised — Plumbing
02/21/2025
Objection raised — Fire_Protection
02/21/2025
Objection raised — Energy
02/21/2025
Objection raised — Structural
02/21/2025
Objection raised — Scope
02/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing worktype for the enlargement and conversion to a 4-family dwelling as per the submitted drawing.
B01169553-S2
02/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing worktype for the enlargement and conversion to a 4-family dwelling as per the submitted drawing.
B01169553-S1
02/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing worktype for the enlargement and conversion to a 4-family dwelling as per the submitted drawing.
B01169553-I1
02/14/2025
Special inspection requirement — Protection of exposed foundation insulation
02/14/2025
Special inspection requirement — Maintenance information
02/14/2025
Special inspection requirement — Metering
02/14/2025
Special inspection requirement — Interior lighting power
02/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
02/14/2025
Special inspection requirement — Energy Code Compliance Inspections
02/14/2025
Special inspection requirement — Concrete - Cast-In-Place
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/21/2025
Special inspection requirement — Air barrier — testing
01/21/2025
Special inspection requirement — Air barrier - visual inspection
01/21/2025
Special inspection requirement — Fenestration air leakage
01/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
01/21/2025
Special inspection requirement — Permanent certificate
01/21/2025
Special inspection requirement — Fenestration areas
01/21/2025
Special inspection requirement — Insulation placement and R values
12/10/2024
Objection raised — Other
12/10/2024
Objection raised — Other
12/10/2024
Objection raised — Other
12/10/2024
Objection raised — Other
12/10/2024
Objection raised — Other
12/10/2024
Objection raised — Other
Latest 60 of 90 events.
Nothing on file for this building.
1 project · most recent 04/10/2025
Sprinkler System
FiledStatusContractorScope
04/10/2025——Sprinkler System
2 projects · most recent 04/10/2025
Gas Water/Sanitary Storm
FiledStatusContractorScope
04/10/2025——Gas, Water/Sanitary
12/04/2024——Gas, Storm, Water/Sanitary
1 project · most recent 04/10/2025
Fence
FiledStatusContractorScope
04/10/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/14/2025Sprinkler Systems—special
02/14/2025Protection of exposed foundation insulation—energy_progress
02/14/2025Maintenance information—energy_progress
02/14/2025Metering—energy_progress
02/14/2025Interior lighting power—energy_progress
02/14/2025Fire-Resistance Rated Construction—progress
02/14/2025Energy Code Compliance Inspections—progress
02/14/2025Concrete - Cast-In-Place—special
02/14/2025Fire-Resistant Penetrations and Joints—special
01/21/2025Structural Stability – Alterations of existing buildings—special
01/21/2025Air barrier — testing —energy_progress
01/21/2025Air barrier - visual inspection—energy_progress
01/21/2025Fenestration air leakage—energy_progress
01/21/2025Fenestration and door U-factor and product ratings—energy_progress
01/21/2025Permanent certificate—energy_progress
01/21/2025Fenestration areas—energy_progress
01/21/2025Insulation placement and R values—energy_progress
12/04/2024Permanent certificate—energy_progress
12/04/2024Maintenance information—energy_progress
12/04/2024Electric vehicle service equipment requirements—energy_progress
11/26/2024Fire-Resistant Penetrations and Joints—special
11/26/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
11/23/2024Fenestration areas—energy_progress
11/23/2024Air barrier - visual inspection—energy_progress
11/23/2024Fire-Resistant Penetrations and Joints—special
Latest 25 of 38.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026B01146826-S1Request digital key ↗
08/23/2026B01146826-I1Request digital key ↗
08/22/2026B01169553-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01146826-I1Open ↗
08/13/2026B01169553-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01146826-I1Open ↗
08/13/2026B01169553-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026B01146826-S1Open ↗
08/23/2026B01146826-I1Open ↗
08/13/2026B01169553-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B01146826-I1Open ↗
08/13/2026B01169553-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01146826-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026B01146826-I1Open ↗
08/23/2026B01146826-S1Open ↗
08/13/2026B01169553-S2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/23/2026B01146826-I1Open ↗
08/13/2026B01169553-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01146826-I1Open ↗
08/13/2026B01169553-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01146826-I1Open ↗
08/13/2026B01169553-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01146826-I1Open ↗