Primarily 5-6 family with 1 store or office
642 LORIMER STREET
BROOKLYN · BIN 3068372
💬 Discuss this project
1928Year Built
3Stories
S5Building Class
R6BZoning
4,274 sfGross Floor Area
7Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 642 LORIMER ST., LLC · 2,494 sf lot · 1.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Floor 22p · 2 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar12p · 7 filings · 20 docs
1 job · most recent 10/06/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/06/2023——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric Mitsubishi MSZ-GS36NA2 33,200 BTU · Fan Coil Indoor ×2
Mitsubishi MUZ-GS36NA2 35,200 BTU · Condensing Unit ×2
1 job · most recent 03/20/2025
FiledStatusContractorScope
03/20/2025——9 heads
1 job · most recent 10/05/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/05/2023——Gas, Storm, Water/Sanitary
4 jobs · most recent 11/19/2024
General Wiring
FiledStatusContractorScope
11/19/2024CompleteATMOS ELECTRIC SVCE CORP—
10/03/2022CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
10/29/2019CompleteWILLDAN ELECTRICAL OF NY—
09/05/2018CompleteFISHMAN ELECT. & SON CORP6 meters
1 job · most recent 01/10/2025
Steel Concrete Masonry
FiledStatusContractorScope
01/10/2025Signed-offMPS PLUMBING & HEATING INSteel, Concrete, Masonry
Building Lifecycle
All (164)Filed (25)Permit Issued (17)Signed Off (11)Violation (7)Inspection (13)Objection (61)Special Inspection (30)
02/09/2026
Signed off — Alteration
B01341448-I1
02/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/20/2026
Permit issued — General Construction
B01341448-I1-GC
01/12/2026
Filed — Alteration
B01341448-I1
09/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/18/2025
Permit issued — Sprinklers
B01197774-I1-EW-SP
05/27/2025
Signed off — Alteration
Install electric ductless split system mechanical units as per plans. Install new commercial kitchen hoods, exhaust fans with duct work, refrigeration unit, and makeup air unit at 2nd floor roof (roof of extension). No change in use, egress, or occupancy.
B01067486-I1
03/20/2025
Filed — Alteration
New SP application for the FDC in open space, new 9 sprinkler heads and related sprinkler piping/BPF filed under B00794843-S6.No change in use, egress and occupancy.
B01197774-I1
03/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
RUWAN RAJAPAKSE
03/19/2025
Special inspection requirement — Sprinkler Systems
RUWAN RAJAPAKSE
03/12/2025
Signed off — Alteration
Proposed horizontal enlargement at 1st floor of existing 3-story mixed use building. Install new partitions and general interior renovation work as per plans. No change in use, egress, or occupancy.
B00794843-I1
03/07/2025
Signed off — Alteration
Erect 8'-0" high temporary plywood construction fence on Jackson Street side of property as per plans. Application is filed in conjunction with B00794843-GC. No change in use, egress, or occupancy.
B00921473-I1
03/06/2025
Signed off — Alteration
Proposed horizontal enlargement at 1st floor of existing 3-story mixed use building. Install new partitions and general interior renovation work as per plans. No change in use, egress, or occupancy.
B00794843-S3
03/06/2025
Signed off — Alteration
Install new plumbing and gas fixtures at 1st floor and cellar as per plans. Application is filed in conjunction with GC B00794843. No change in use, egress, or occupancy.
B01019255-I1
02/07/2025
Objection resolved — Addressed
01/22/2025
Signed off — Alteration
Proposed new installation of illuminated double-faced non-flashing signs for commercial tenant Johnny's. Wording: Johnny's
B01143719-I1
01/16/2025
Objection raised — Fire_Protection
01/15/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
01/10/2025
Filed — Alteration
Proposed horizontal enlargement at 1st floor of existing 3-story mixed use building. Install new partitions and general interior renovation work as per plans. No change in use, egress, or occupancy.
B00794843-P1
12/16/2024
Special inspection requirement — Final
RUWAN RAJAPAKSE
12/16/2024
Special inspection requirement — Structural Steel - High Strength Bolting
RUWAN RAJAPAKSE
12/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RUWAN RAJAPAKSE
12/16/2024
Special inspection requirement — Structural Steel - Details
RUWAN RAJAPAKSE
12/16/2024
Special inspection requirement — Concrete - Cast-In-Place
RUWAN RAJAPAKSE
12/16/2024
Special inspection requirement — Structural Steel - Welding
RUWAN RAJAPAKSE
12/16/2024
Special inspection requirement — Masonry
RUWAN RAJAPAKSE
12/09/2024
Objection resolved — Addressed
12/03/2024
Objection raised — Other
11/25/2024
Filed — Alteration
Proposed horizontal enlargement at 1st floor of existing 3-story mixed use building. Install new partitions and general interior renovation work as per plans. No change in use, egress, or occupancy.
B00794843-P2
11/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Permit issued — Sign
B01143719-I1-SG
11/19/2024
Filed — Alteration
Proposed new installation of illuminated double-faced non-flashing signs for commercial tenant Johnny's. Wording: Johnny's
B01143719-I1
11/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Timothy Li
11/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Timothy Li
11/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Timothy Li
11/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Timothy Li
11/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Timothy Li
11/05/2024
Filed — Alteration
Install new plumbing and gas fixtures at 1st floor and cellar as per plans. Application is filed in conjunction with GC B00794843. No change in use, egress, or occupancy.
B01019255-P1
11/01/2024
Signed off — Alteration
Proposed horizontal enlargement at 1st floor of existing 3-story mixed use building. Install new partitions and general interior renovation work as per plans. No change in use, egress, or occupancy.
B00794843-S4
10/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/21/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/09/2024
Permit issued — Plumbing
B00794843-S6-PL
09/18/2024
Permit issued — Construction Fence
B00921473-I1-FN
07/29/2024
Signed off — Alteration
Proposed horizontal enlargement at 1st floor of existing 3-story mixed use building. Install new partitions and general interior renovation work as per plans. No change in use, egress, or occupancy.
B00794843-S2
06/20/2024
Permit issued — Mechanical Systems
B01067486-I1-MS
06/17/2024
Filed — Alteration
Install electric ductless split system mechanical units as per plans. Install new commercial kitchen hoods, exhaust fans with duct work, refrigeration unit, and makeup air unit at 2nd floor roof (roof of extension). No change in use, egress, or occupancy.
B01067486-I1
06/17/2024
Special inspection requirement — Maintenance information
Timothy Li
06/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
Timothy Li
06/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Timothy Li
06/17/2024
Special inspection requirement — Final
Timothy Li
06/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Timothy Li
06/17/2024
Special inspection requirement — Mechanical Systems
Timothy Li
06/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Timothy Li
06/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
Timothy Li
06/13/2024
Special inspection requirement — Final
RUWAN RAJAPAKSE
06/13/2024
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
06/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RUWAN RAJAPAKSE
06/13/2024
Special inspection requirement — Insulation placement and R values
RUWAN RAJAPAKSE
Latest 60 of 164 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
642 LORIMER ST7407/08/2026
MORGAN CONSTRUCTION NY IN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2022$2.3M—— → —$533/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PROSPECT ENGINEERING P.C201/12/2026
CNY ENGINEERING P.C203/20/2025
TLI ARCHITECT, PLLC1701/10/2025
TIMES BUILDINGS ENGINEERING SER PC411/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TIMES BUILDINGS ENG SERV P C803/21/2026
BMB BUILDING CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MCNY CONTRACTING LLCGeneral Contractor1507/08/2026
MPS PLUMBING & HEATING INCPlumbing407/08/2026
MORGAN CONSTRUCTION NY INCGeneral Contractor307/08/2026
UNITECH DESIGN INCGeneral Contractor104/09/2026
UNITECH DESIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROSPECT ENGINEERING P.C.2775101/12/2026
GRAND INSPECTION & CONSUL6792803/20/2025
TLI ARCHITECT, PLLC1045711/05/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUNITECH DESIGN INC01/20/2026
DOB NOWSprinklersSigned-offMPS PLUMBING & HEATING IN06/18/2025
DOB NOWSignSigned-offUNITECH DESIGN INC11/20/2024
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN10/09/2024
DOB NOWConstruction FenceSigned-offMCNY CONTRACTING LLC09/18/2024
DOB NOWMechanical SystemsSigned-offMCNY CONTRACTING LLC06/20/2024
DOB NOWGeneral ConstructionSigned-offMCNY CONTRACTING LLC05/21/2024
DOB NOWSupport of ExcavationSigned-offMCNY CONTRACTING LLC05/10/2024
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN03/26/2024
DOB NOWFoundationSigned-offMCNY CONTRACTING LLC11/21/2023
DOB NOWStructuralSigned-offMCNY CONTRACTING LLC11/16/2023
DOB NOWSupport of ExcavationSigned-offMCNY CONTRACTING LLC11/09/2023
DOB NOWGeneral ConstructionSigned-offMCNY CONTRACTING LLC10/31/2023
DOB NOWConstruction FenceSigned-offMCNY CONTRACTING LLC08/22/2023
DOB NOWGeneral ConstructionSigned-offLEMLE & WOLFF CONSTRUCT04/14/2023
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN12/07/2022
DOB NOWGeneral ConstructionSigned-offLEMLE & WOLFF CONSTRUCT11/28/2022
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
09/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/15/2025Pass-Final Sign Permit InspectionPassView ↗
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/21/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
05/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2024Pass-Final PL - UndergroundPassView ↗
11/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
03/20/2025Tenant Protection Plan ComplianceRUWAN RAJAPAKSEspecial
03/19/2025Sprinkler SystemsRUWAN RAJAPAKSEspecial
12/16/2024MasonryRUWAN RAJAPAKSEspecial
12/16/2024Structural Steel - DetailsRUWAN RAJAPAKSEspecial
12/16/2024Concrete - Cast-In-PlaceRUWAN RAJAPAKSEspecial
12/16/2024Structural Steel - WeldingRUWAN RAJAPAKSEspecial
12/16/2024Structural Stability – Alterations of existing buildingsRUWAN RAJAPAKSEspecial
12/16/2024Structural Steel - High Strength BoltingRUWAN RAJAPAKSEspecial
12/16/2024FinalRUWAN RAJAPAKSEprogress
11/07/2024HVAC-R and service water heating equipmentTimothy Lienergy_progress
11/07/2024HVAC-R and service water heating system controlsTimothy Lienergy_progress
11/07/2024HVAC-R and service water piping design and insulationTimothy Lienergy_progress
11/07/2024Energy Code Compliance InspectionsTimothy Liprogress
11/07/2024Fire-Resistant Penetrations and JointsTimothy Lispecial
06/17/2024Tenant Protection Plan ComplianceTimothy Lispecial
06/17/2024Maintenance informationTimothy Lienergy_progress
06/17/2024HVAC-R and service water heating system controlsTimothy Lienergy_progress
06/17/2024HVAC-R and service water piping design and insulationTimothy Lienergy_progress
06/17/2024HVAC-R and service water heating equipmentTimothy Lienergy_progress
06/17/2024FinalTimothy Liprogress
06/17/2024Energy Code Compliance InspectionsTimothy Liprogress
06/17/2024Mechanical SystemsTimothy Lispecial
06/13/2024MeteringRUWAN RAJAPAKSEenergy_progress
06/13/2024Fenestration and door U-factor and product ratingsRUWAN RAJAPAKSEenergy_progress
06/13/2024Insulation placement and R valuesRUWAN RAJAPAKSEenergy_progress
Latest 25 of 78.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/28/2026B07995164-I1Request digital key ↗
08/28/2026B07995164-P1Request digital key ↗
08/28/2026B07995164-P2Request digital key ↗
Showing 3 of 25 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00794843-P1Open ↗
08/13/2026B00794843-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00794843-P1Open ↗
08/13/2026B00794843-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/28/2026B07995164-I1Open ↗
08/28/2026B07995164-P1Open ↗
08/28/2026B07995164-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/23/2026B08045016-P1Open ↗
09/01/2026B07995164-P4Open ↗
09/01/2026B07995164-P4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B08045016-P1Open ↗
09/23/2026B01197774-I1Open ↗
08/30/2026B00794843-P1Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00794843-P1Open ↗
08/13/2026B00794843-I1Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
08/28/2026B07995164-I1Open ↗
08/28/2026B07995164-P1Open ↗
08/28/2026B07995164-P2Open ↗
Showing 3 of 24 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00794843-S4Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00794843-S4Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026B00794843-I1Open ↗
08/13/2026B00794843-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00794843-I1Open ↗
08/13/2026B00794843-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00794843-P1Open ↗
08/13/2026B00794843-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00794843-S2Open ↗