← Back
Shopping center, with or without parking
6420 AMBOY ROAD
STATEN ISLAND · BIN 5110511
💬 Discuss this project
1993Year Built
1Stories
K6Building Class
R3XZoning
69,575 sfGross Floor Area
12Units
3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: AMBOY REALTY PLAZA L · 250,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingLandscapeGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 10 docs
Floor 1Under Construction23p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARVEST REAL ESTATE SERVICES2509/13/2026
AMBOY REALTY PLAZA L103/22/2026
AURORA CONTRACTORS, IN103/22/2026
AMBOY PLAZA REALTY303/21/2026
ISLAND REALITY HOLDINGS303/21/2026
D-MARK CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BIANCA V. SKVIRSKY, PE206/11/2026
ZELTA DESIGN405/06/2026
BASSIRI303/26/2025
A TECH ENGINEERING NYC, PLLC.212/19/2022
F.P.VILLANO CONSULTING ENGINEER LLC111/04/2020
JOSE L. PENA,P.E.208/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO603/21/2026
LOUIS STRIAR603/21/2026
A TECH ENGINEERING NYC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A1 SPECIALIZED, INCScaffold607/17/2026
KALE CONSTRUCTION INCGeneral Contractor407/08/2026
APPROVED ELECTRIC CORP.Electrical103/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/15/2026
PHIL'S AIR CONDITIONING &General Contractor107/08/2026
ALL AMERICAN CONSTRUCTIONGeneral Contractor108/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZELTA INSPECT LLC7764104/06/2026
BASSIRI8394203/26/2025
A TECH ENGINEERING NYC, P6738212/19/2022
Building Lifecycle
All (85)Filed (14)Permit Issued (12)Signed Off (6)Violation (17)Inspection (6)Special Inspection (30)
08/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2026
Permit issued — General Construction
S01331985-I1-GC
07/16/2026
Permit issued — Sign
S01386829-I1-SG
07/16/2026
Permit issued — Sign
S01386830-I1-SG
07/14/2026
Permit issued — Plumbing
S01331985-S1-PL
06/11/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - DUNKIN'. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01386829-I1
06/11/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - DUNKIN'. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01386830-I1
06/11/2026
Special inspection requirement — Final
BIANCA SKVIRSKY
05/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
05/07/2026
Special inspection requirement — Final
ERIK LIEPINS
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
05/07/2026
Special inspection requirement — Maintenance information
ERIK LIEPINS
05/07/2026
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
05/07/2026
Special inspection requirement — Lighting controls
ERIK LIEPINS
05/07/2026
Special inspection requirement — Interior lighting power
ERIK LIEPINS
05/06/2026
Filed — Alteration
PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01331985-P2
05/06/2026
Filed — Alteration
PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01331985-P1
05/04/2026
Special inspection requirement — Interior lighting power
05/04/2026
Special inspection requirement — Lighting controls
05/04/2026
Special inspection requirement — Maintenance information
05/04/2026
Special inspection requirement — Exterior lighting power
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
05/04/2026
Special inspection requirement — Final
04/06/2026
Filed — Alteration
PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01331985-S1
04/06/2026
Filed — Alteration
PROPOSED RENOVATION OF EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
S01331985-I1
04/21/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01143176-I1
04/18/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR(UNIT#80 ONLY) WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01143180-I1
04/18/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
03/27/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
03/27/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
03/27/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
03/26/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01143176-P1
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
03/26/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
03/26/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
01/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/13/2024
Permit issued — Plumbing
S01143180-I1-PL
12/10/2024
Permit issued — Mechanical Systems
S01143176-I1-MS
12/10/2024
Permit issued — General Construction
S01143176-I1-GC
11/26/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01143176-I1
11/26/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR(UNIT#80 ONLY) WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S01143180-I1
07/05/2023
Violation issued (FDNY_NOV, closed)
03/14/2023
Signed off — Alteration
Direct replacement of (1) 4-ton rooftop HVAC single package unit onto existing roof curb.
S00659625-I1
03/13/2023
Permit issued — Mechanical Systems
S00659625-I1-MS
12/20/2022
Violation issued (FDNY_NOV, closed)
12/20/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/20/2022
Special inspection requirement — Mechanical Systems
anthony santoro
12/20/2022
Special inspection requirement — Final
anthony santoro
12/19/2022
Filed — Alteration
Direct replacement of (1) 4-ton rooftop HVAC single package unit onto existing roof curb.
S00659625-P2
12/19/2022
Special inspection requirement — Mechanical Systems
anthony santoro
12/19/2022
Special inspection requirement — Final
anthony santoro
11/04/2022
Filed — Alteration
Direct replacement of (1) 4-ton rooftop HVAC single package unit onto existing roof curb.
S00659625-I1
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedALL AMERICAN CONSTRUCTION08/11/2026
DOB NOWSignPermit IssuedMAD SIGNS INC07/16/2026
DOB NOWSignPermit IssuedMAD SIGNS INC07/16/2026
DOB NOWPlumbingPermit IssuedSAFEPIPE PLUMBING INC07/14/2026
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/13/2024
DOB NOWMechanical SystemsSigned-offKALE CONSTRUCTION INC12/10/2024
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC12/10/2024
DOB NOWMechanical SystemsSigned-offPHIL'S AIR CONDITIONING &03/13/2023
DOB NOWSignSigned-offMAD SIGNS INC06/29/2021
DOB NOWSignSigned-offMAD SIGNS INC11/12/2020
DOB NOWSignSigned-offMAD SIGNS INC08/25/2020
DOB NOWSignSigned-offMAD SIGNS INC07/01/2019
BISMHISSUEDD MARK CONSTRUCTION CORP10/29/2019
BISPLISSUEDJPI PLUMBING & HEATING IN04/09/2019
BISOTISSUEDD MARK CONSTRUCTION CORP03/25/2019
BISOTISSUEDD MARK CONSTRUCTION CORP06/05/2018
BISOTISSUEDD MARK CONSTRUCTION CORP05/23/2017
BISMHISSUEDQSR DEVELOPMENT GROUP LLC03/24/2017
BISMHISSUEDEAGLE INTERIORS INC01/30/2017
BISOTISSUEDD MARK CONSTRUCTION CORP05/17/2016
1 project · most recent 05/06/2026
Water/Sanitary
FiledStatusContractorScope
05/06/2026Permit IssuedSAFEPIPE PLUMBING INCWater/Sanitary
4 projects · most recent 06/08/2026
General Wiring
FiledStatusContractorScope
06/08/2026CompleteALL PRO ELEC. OF N.Y. INC—
06/08/2026CompleteALL PRO ELEC. OF N.Y. INC—
04/09/2019CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
11/19/2018Permit IssuedAPPROVED ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
06/11/2026FinalBIANCA SKVIRSKYprogress
05/07/2026Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
05/07/2026FinalERIK LIEPINSprogress
05/07/2026Energy Code Compliance InspectionsERIK LIEPINSprogress
05/07/2026Maintenance informationERIK LIEPINSenergy_progress
05/07/2026Exterior lighting powerERIK LIEPINSenergy_progress
05/07/2026Lighting controlsERIK LIEPINSenergy_progress
05/07/2026Interior lighting powerERIK LIEPINSenergy_progress
05/04/2026Interior lighting power—energy_progress
05/04/2026Lighting controls—energy_progress
05/04/2026Maintenance information—energy_progress
05/04/2026Exterior lighting power—energy_progress
05/04/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Energy Code Compliance Inspections—progress
05/04/2026Final—progress
03/27/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
03/27/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
03/27/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
03/27/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
03/27/2025FinalFARHAD BASSIRI-TEHRANIprogress
03/26/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
03/26/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
03/26/2025FinalFARHAD BASSIRI-TEHRANIprogress
03/26/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
03/26/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
Latest 25 of 32.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
08/23/2026S00659625-P2Request digital key ↗
08/23/2026S00659625-I1Request digital key ↗
08/20/2026S01143180-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sign3
08/26/2026S00173687-I1Request digital key ↗
08/26/2026S00373942-I1Request digital key ↗
08/25/2026S00418394-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION8
11/01/2019520375683Open ↗
04/10/2019520375683Open ↗
03/26/2019520375683Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
08/29/2019520375683Open ↗
08/02/2019520375683Open ↗
06/26/2019520375683Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026S00173687-I1Open ↗
08/26/2026S00373942-I1Open ↗
08/23/2026S00659625-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026S00659625-I1Open ↗
08/31/2026S00659625-I1Open ↗
08/30/2026S01143176-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/27/2019520226309Open ↗
09/27/2019520375683Open ↗
03/15/2019520375683Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026S00659625-I1Open ↗
08/30/2026S01143176-I1Open ↗
08/28/2026S01331985-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/15/2019520375683Open ↗
04/04/2017520277067Open ↗
01/10/2017540120420Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/15/2019520375683Open ↗
04/04/2017520277067Open ↗
05/12/2016520226309Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/10/2017540120420Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/10/2017540120420Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
08/20/2019520375683Open ↗
08/02/2019520375683Open ↗
06/26/2019520375683Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/17/2017520277067Open ↗
04/12/2017540120420Open ↗
04/04/2017520277067Open ↗
▸BISEQUIPMENT USE PERMITS2
04/17/2017520277067Open ↗
04/12/2017540120420Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
03/15/2019520375683Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026S00173687-I1Open ↗
08/26/2026S00373942-I1Open ↗
08/16/2026S01331985-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/18/2019520375683Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
09/27/2019520226309Open ↗
09/27/2019520375683Open ↗
03/15/2019520375683Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/27/2019520226309Open ↗
09/27/2019520375683Open ↗
04/17/2017520277067Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/30/2017540120420Open ↗
01/10/2017540120420Open ↗
▸BISNYCECC ANALYSIS1
01/10/2017540120420Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/10/2017540120420Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/30/2017540120420Open ↗
01/10/2017540120420Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/07/2019520375683Open ↗
10/02/2019520226309Open ↗
09/27/2019520226309Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/15/2019520375683Open ↗
04/04/2017520277067Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/27/2019520375683Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
09/27/2019520226309Open ↗
09/27/2019520375683Open ↗
03/15/2019520375683Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM8
11/07/2019520375683Open ↗
10/02/2019520226309Open ↗
09/27/2019520226309Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET3
03/15/2019520375683Open ↗
04/04/2017520277067Open ↗
05/12/2016520226309Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/10/2017540120420Open ↗
▸BISADDITIONAL INFORMATION1
09/15/2017520226309Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
01/10/2017540120420Open ↗